HEADQUARTERS POWER TESTING SCHEDULE
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-04722A000200010010-4
Release Decision:
RIFPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 9, 2016
Document Release Date:
June 8, 2000
Sequence Number:
10
Case Number:
Content Type:
CHART
File:
Attachment | Size |
---|---|
![]() | 193.09 KB |
Body:
crT
Approved For. Release 2000/08/28 : CIA-RDP78-04722A000200010010-4
HEADQUARTERS POWER TESTING SCHEDULE
POWER INTERRUPTION
POWER SOURCE
JANUARY, JULY ALL OTHER
MONTHS-
Frantic
10 seconds at None
1900 hours.
Critical
90 to_ 120 seconds None
at 1900 hours.
Commercial Power
total from 1900 to 2200 hours.
NOR
TH HALF OF BUILDING
POWER INTERRUPTION
POWER SOURCE
JANUARY, JULY ALL OTHE
MONTHS
Frantic
~..
10 seconds at None
1900 hours.
Critical
90 to 120 seconds None
at 1900 hours.
Emergency
Approximately 15-minute outage
starting at 1900 hours.
Commercial Power
Total from 1900.to 2200 hours.
Formerly the 30 kw. uninterrupted power source. Presently 250 kw., 10-second response, automatic-start
generator located within the Headquarters Building and backing up the following loads:
b. Select equipment for the Office of Communications.
. Select equipment for the Office of Security.
Select equipment in the 7D 25 - 7E 35 area.
='
Approved For Release 2000/08/28 : CIA-RDP78-04722A000200010010-4
backing up the following loads:
Approved for Release. 2000/08/28 : CIA-RDP78-04722AO0020001001.0-4
2500 kw. 90- to 120-second response, automatic-start generator located adjacent to the powerhouse and
a. All loads located in the south half of the Building which previously were on emergency.
power; i. e. , all loads in the south half of the Building which were backed up by the two each
2000 kw. manual-start generators are now backed tip by the 2500 kw. automatic-start
generator.
b. Select loads in the. north half of the Building including all telephones, all KY-3's-and
the area between 7D 25 and 7E 35.
Emergency Power:
Two each 2000 kw. manual-start, l5-minute respo-nse'generators located in the powerhouse-and backing
up the following loads: All emergency loads in the north end of the Building; i. e., no change -- all loads
in the north end of the Building previously on emergency power (two each 2000 kw. 's) are still on emer-
gency power. There is no emergency power in the south half of the Building during the test. In an
actual outage, however, emergency power can be switched, as necessary, from the north half of the '.:
Building to the south half of the Building.
Approved For Release 2000/08/28: CIA-RDP78-04722A000200010010-4