HEADQUARTERS POWER INTERRUPTION SCHEDULE

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-04722A000200020090-5
Release Decision: 
RIFPUB
Original Classification: 
K
Document Page Count: 
2
Document Creation Date: 
December 9, 2016
Document Release Date: 
March 29, 2000
Sequence Number: 
90
Case Number: 
Publication Date: 
March 7, 1971
Content Type: 
CHART
File: 
AttachmentSize
PDF icon CIA-RDP78-04722A000200020090-5.pdf71.21 KB
Body: 
-. ATTACHMENT 1 Approved Fo~0/fl8: ~#~7$flfl~fl0020090-5 7 March 1971 POWER SOURCE POWER STATUS Frantic - Not Affected Critical _ Total outage, 90 seconds to Emergency several minutes at: Commercial or ~ 1000 Hours Normal Power 1200 Hours 1500 Hours FRANTIC POWER Within the Headquarters Building the Frantic Power is backing up the following loads: - -a. Select equipment in Operations Center b. Select equipment for the~Office of Communications c. Select equipment for the Office of Security d. Select lighting and equipment in 7D and 7E areas Approved For Release 2000/08/28 :CIA-RDP78-04722A000200020090-5 ATTACHMENT 1 .Approved For Release 2000/08/28 :CIA-RDP78-04722A000200020090-5 Critical Power: 2500 kw. 90- to 120-second response, automatic-start generator located adjacent to the powerhouse and backing up the following loads: a. All loads located in the south half of the Building which previously were on emergency power; i.e., ail loads in the south half of the Building which were backed up by the two each 2000 kw. manual-start generators are now backed up by the 2500 kw. automatic-start generator. b. Select loads in the north half of the Building including-all telephones, all KY-3's and the area between 7D 25 and 7E 35. ~nergency Power: Two each 2000 kw. manual-start,` 15-minute response generators located in the powerhouse _ and backing up the following loads: All emergency loads in the north end of the Build- ing; i.e.., no change -- all loads in the north end of the Building previously on emergency power (two each 2000 kw.'s) are still on emergency power. There is no emergency power in the south half of the Building during the test. In an actual outage, however, emer- gency power can be switched, as necessary, from the north half of the Building to-thee south half of the Building _ Commercial or Normal Power: All remaining. power not mentioned in systems listed above which serve the Headquarters Area Complex. -- Approved For Release 2000/08/28 :CIA-RDP78-04722A000200020090-5