HEADQUARTERS POWER INTERRUPTION SCHEDULE
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-04722A000200020090-5
Release Decision:
RIFPUB
Original Classification:
K
Document Page Count:
2
Document Creation Date:
December 9, 2016
Document Release Date:
March 29, 2000
Sequence Number:
90
Case Number:
Publication Date:
March 7, 1971
Content Type:
CHART
File:
Attachment | Size |
---|---|
CIA-RDP78-04722A000200020090-5.pdf | 71.21 KB |
Body:
-. ATTACHMENT 1
Approved Fo~0/fl8: ~#~7$flfl~fl0020090-5
7 March 1971
POWER SOURCE
POWER STATUS
Frantic -
Not Affected
Critical _
Total outage, 90 seconds to
Emergency
several minutes at:
Commercial or ~
1000 Hours
Normal Power
1200 Hours
1500 Hours
FRANTIC POWER
Within the Headquarters Building the Frantic Power is backing
up the following loads:
-
-a.
Select
equipment
in
Operations Center
b.
Select
equipment
for
the~Office of Communications
c.
Select
equipment
for
the Office of Security
d.
Select
lighting
and
equipment in 7D and 7E areas
Approved For Release 2000/08/28 :CIA-RDP78-04722A000200020090-5
ATTACHMENT 1
.Approved For Release 2000/08/28 :CIA-RDP78-04722A000200020090-5
Critical Power:
2500 kw. 90- to 120-second response, automatic-start generator located adjacent to the
powerhouse and backing up the following loads:
a. All loads located in the south half of the Building which previously were on
emergency power; i.e., ail loads in the south half of the Building which were
backed up by the two each 2000 kw. manual-start generators are now backed up by
the 2500 kw. automatic-start generator.
b. Select loads in the north half of the Building including-all telephones, all
KY-3's and the area between 7D 25 and 7E 35.
~nergency Power:
Two each 2000 kw. manual-start,` 15-minute response generators located in the powerhouse
_ and backing up the following loads: All emergency loads in the north end of the Build-
ing; i.e.., no change -- all loads in the north end of the Building previously on emergency
power (two each 2000 kw.'s) are still on emergency power. There is no emergency power
in the south half of the Building during the test. In an actual outage, however, emer-
gency power can be switched, as necessary, from the north half of the Building to-thee
south half of the Building _
Commercial or Normal Power:
All remaining. power not mentioned in systems listed above which serve the Headquarters
Area Complex. --
Approved For Release 2000/08/28 :CIA-RDP78-04722A000200020090-5