EFFECT OF EACH OUTAGE IN SPECIFIC AREAS
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-04722A000200020091-4
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
3
Document Creation Date:
December 9, 2016
Document Release Date:
March 29, 2000
Sequence Number:
91
Case Number:
Publication Date:
March 7, 1971
Content Type:
MISC
File:
Attachment | Size |
---|---|
CIA-RDP78-04722A000200020091-4.pdf | 141.55 KB |
Body:
Approued For Relea$e 2009$/2
~4~22A0002000200~4
ATTACHMENT 2
Power Outages; _7 MARCH 1971
Times; 1000, 1200 and 1500 Hours
Effect of each Outage in Specific Areas
A.
Director of Central Intelligence
1. Rooms 7D>25 to 7D-35, Director of Central Intelligence and Deputy
Director of Central~Intelligence Suites >
Incandescent lighting (Office of DCI and DDCI have incandescent
lighting), telephones and KY~3's will not be affected. The
remainder of the system including the Director's special elevator
will be out for 90 seconds to several minutes at the commencement
of each test.
2. Room 6F-19, Director of Central Intelligence, Vietnam Task Force
All equipment, teletype and lighting will be out 90 seconds to several
minutes at the commencement of each test.
B. Deputy Director of Intelligence
Room 7F~33, Operations Center -
Equipment connected to Frantic power system will not be affected. All
other lights and equipment will, be out 90 seconds to several minutes
:.each test commencement.
C. Deputy Director for Plans
1. Room UC-47, Records Integration Division Computer Center >
All equipment and lights will be out 90 seconds to several minutes
at the commencement of each test.
2. , Room GD-30, Records Integration division File Rohm >
All equipment and lights will be out 90 seconds to several minutes
at the commencement of each test. -
3. ~ Room 5D-55, -Task Force r
. Lighting and telephone service will be out 90 seconds to several
minutes at the commencement of each test.
.Approved For Release?2000/08/28 :CIA-RDP78-04722A000200020091-4
..
_
Approved For Release 2008/28
Attachrtte)Yt 2
-Power Out~ges._ 7 MARCH ,1971, Times: 1.000, 1200 and 1500 Hours, Effect of
each Outage iTt Specific Areas
D. Deputy Director. for 5uppo:rt
1. Rooms 113-27 attd GB-14, Office of Communications, Signal Center
? Frantic power. circuits will not be affected. All other circuits
will be out 90 seconds to several minutes at the commencement
'oF each test.
2; All. KY-3 tClCjlliOnC9 ttn(l gray t:clephrntes -
.KY-3 tclepl~oneR will l.)c out 90 ,~ccoruls to several minutes at the
cormi~encetnettt of each test except those noted in paragr. orbs A, l,.
and D. 5. Gray phones will not be affected.
,.
3. ~ Logistics Scr.vices Division, Office of Logistics aiul various building
services
a. Telephones -The main telephone frame will not experience an
outage. The source of the annunciator-system, indicator lights
and ringing will not operate 90 seconds to several minutes at
the commencement of each test except as noted in paragraphs
A. 1. and D. 5.
b. Building cl.evators -All elevators will be out of operation from
90 seconds to sever. al minutes at the commencement of each test.
cr I'-teumacic Tube System - The entire system will be out of service
front 90 seconds to several minutes at the commencement of each
test.
Printing Services Division, Office of Logistics
a. GJ-56 plant -All equipment and lights will experience a 90 seconds
to several minutes outage at the commencement of each test.
b. 7G~29 plant -All equipment will be out 90 seconds to several minutes
at the commencerttent of each test except the two circuits connected
to the frantic system.
5. Room IE-26, Building Security Branch, Office of Security- KY-3, Radio's,
. telephone's and DC parrion~.~ of the alarm system will be operational.
Ajipro.ved For Release X000/08/28 :CIA-RDP78-04722A000200020091-4
~I~C~I~~"ll~
Approved For Release 2008/28
...
~~~00200020(-4
Attachment 2
~ 1
Power Outages ~_ 7 MARCH 1971, Times; 1000, 1200 and 1500 Hours, Effect of
each Outage in Specific Areas .
E. Deputy Director for Science and ~'echnology
1. Data Communications, Office of Special Projects ~ y
Service to overhead lights, computer and peripheral equipment
will be out from 90 seconds to several minutes at the commencement.
of each test.
2. Roam 1D-0031, Foreign Missile and Space Analysis Center -
The Computer and peripheral equipment will be out from 90 seconds
to several minutes at the commencement of each test.
3. Room 1D~0023, Office of EJ.int -~
Ail equipment connected will be out 90 seconds to several minutes
at the commencement of each test.
4. Computer Center, Office of Computer Services
All power to Computer equipment will be out 90 seconds to several
minutes at the commencement of each test.