(Sanitized)CONSTRUCTION
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-04727A000300120018-8
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 12, 2016
Document Release Date:
September 9, 1998
Sequence Number:
18
Case Number:
Publication Date:
April 7, 1966
Content Type:
MF
File:
Attachment | Size |
---|---|
![]() | 65.61 KB |
Body:
~~ Approved For Release 2001/11/0 78-04727A000300120018 ~ `' ~~ ~' ~/ _ ~ G ~2i
~' ~ 25X1A2g
R~ 1y
~ ~ 1~ s
MEMORANDUM FOR: Deputy Director for Suppor
1, This memorandum is for information only.
2. It has been determined to proceed with
construction, using the Corps of Engineers as our on-
struction Agent. In order to expedite this project to
the greatest extent possible, the following steps were
taken:
a. Plans and specifications were largely
developed by the Real Estate and Construction
Division, OL, prior to approval of the project.
b. Requisitions have been placed for mate-
rial and equipment which could not be procured
locally, thus saving several months compared
with a contractor ordering this material after
award of a construction contract.
c. Discussions held with representatives
of the Corps of Engineers at Headquarters
relative to procedures and timing for this
project.
3 Plans have now been forwarded to the Station
at ~ and through the Corps o~ineers' channels
to the Gulf District Engineer,
Construction Engineer, will proceed to
on pril 196 to represent the Agency in away ing
a contract for site development, foundations for
buildings and antennae, erection of prefab buildings
and installation of utilities.
4, Arrangements are.. being made with the prefab
supplier to furnish a skilled foreman to supervise the
erection of the prefab buildings.
4 t j: ~.:~
Approved For Release 2001/11/01 :CIA-RDP78-0 ~ A0003004 0018-8
Approved For Release 2001/11/01 : Ck~~~~~p8-04727A000300120018-8
).: 6 V[
SUBJECT: Construction
5. The Real Estate and Construction Division, oL,
proposes detailing an engineer to this project during
construction to direct and expedite the program.