SITE PREPARTION FOR THE INSTALLATION OF A FILM VIEWER ROOM 3N433-E,(Classified)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-04782A000100050030-3
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
1
Document Creation Date:
November 11, 2016
Document Release Date:
October 22, 1998
Sequence Number:
30
Case Number:
Content Type:
STUDY
File:
Attachment | Size |
---|---|
![]() | 43.76 KB |
Body:
Approved-For Release.1.999/ !1x78-04782A000100050030-3
Attachment "E"
25X1A6a
SITE PI ERABATION FOR THE INSTALLATION OF A FILM VIEWER
ROOM 3N)133-E,
Estimated Cost: $1)1, 500
Estirnal,e Tay: GSA, Ana.costia Group Force
Dhginecring; Required By: None
Alterations to be Performed By: 'Anacostia Group Force
'Carl et Dutc: f'or Comp..Letion: 30 May 1.961f
De scrip t ton
This site prepa.ratioii w iii require the procurement and..instaiia-
Lion of a 1argur, Type "D" air mixing box and a return air duct, a
25X1A6a compressed air line between and this room, and the
procurement and ins tallat ion o an electrical control panel:, as well as
related electrical. work.
Ju,t:ifi.cation
The unique eiec Lricai. and mechari..i ca.! characteristics of this ins tru-
menL generate taceat loads in excess, of 1;,000 BTU's which cannot be
(Iis ;Ipatz.d i.nt () Ltdjoini:nFr areas or into Lhe air conditi:or)in.g system-by
the Type "A" rnrx:Lnp; box presently installed. This i,nsttiument has been
25X1A6a designed since was planned and requires 10 psi of compressed
air to ac t;u.ate :,omc o1' 1,ts, components. An additional electrical control.
panel- ir; necessary to provide the special current required.
Approved For Release 1999/08/27 CIA-RDP78-04782A000100050030-3