SITE PREPARTION FOR THE INSTALLATION OF A FILM VIEWER ROOM 3N433-E,(Classified)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-04782A000100050030-3
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
1
Document Creation Date: 
November 11, 2016
Document Release Date: 
October 22, 1998
Sequence Number: 
30
Case Number: 
Content Type: 
STUDY
File: 
AttachmentSize
PDF icon CIA-RDP78-04782A000100050030-3.pdf43.76 KB
Body: 
Approved-For Release.1.999/ !1x78-04782A000100050030-3 Attachment "E" 25X1A6a SITE PI ERABATION FOR THE INSTALLATION OF A FILM VIEWER ROOM 3N)133-E, Estimated Cost: $1)1, 500 Estirnal,e Tay: GSA, Ana.costia Group Force Dhginecring; Required By: None Alterations to be Performed By: 'Anacostia Group Force 'Carl et Dutc: f'or Comp..Letion: 30 May 1.961f De scrip t ton This site prepa.ratioii w iii require the procurement and..instaiia- Lion of a 1argur, Type "D" air mixing box and a return air duct, a 25X1A6a compressed air line between and this room, and the procurement and ins tallat ion o an electrical control panel:, as well as related electrical. work. Ju,t:ifi.cation The unique eiec Lricai. and mechari..i ca.! characteristics of this ins tru- menL generate taceat loads in excess, of 1;,000 BTU's which cannot be (Iis ;Ipatz.d i.nt () Ltdjoini:nFr areas or into Lhe air conditi:or)in.g system-by the Type "A" rnrx:Lnp; box presently installed. This i,nsttiument has been 25X1A6a designed since was planned and requires 10 psi of compressed air to ac t;u.ate :,omc o1' 1,ts, components. An additional electrical control. panel- ir; necessary to provide the special current required. Approved For Release 1999/08/27 CIA-RDP78-04782A000100050030-3