FUTURE HOUSING FOR AGENCY HEADQUARTERS ELEMENTS
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-04787A000100010029-4
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
21
Document Creation Date:
December 9, 2016
Document Release Date:
August 18, 2000
Sequence Number:
29
Case Number:
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 896.91 KB |
Body:
Approved For Relea001/08/31 : CIA-RDP78-047$i 0100010029-4
A
kjp~wlb
?
a_ a a a a a a__ a a a a a s s l~Yi
TAB A - a - a -
TAB R a w a a a_ a r s a w a w a CUBMW SPACE SITUATION
TAB C a a a a a_ a a a a -
FUTURE SPACE ]38
TAB D a a a a a a a a a a - a a a a a BROAD COAT iii7iI3
Approved For Release 2001/08/31 :-CM RDP
)29-4
Approved For Release 2001/08/31 : CIA-RDP78-04787A000100010029-4
TAB
Approved For Release 2001/08/31 : CIA-RDP78-04787A000100010029-4
Approved For Release62001/08/31 : CIA-RDP78-04787A000100010029-4
QPPJJJJJEIV t 1
DARTERS HU1LD1i CONSTRUCTION
HISTORY
1955 our original estimate of the construction cost for
new headquarters building to house approximately 10, 000 employees
$85, 000, 000. The estimate of the Public Buildings Service al
prepared in 1955, was $50, $00, 000 and after our discussions with the
Bureau of the Budget we requested the Congress for authorization of
000. Our final authorisation which was contained in the
Military Construction Act of 1955 (Public Law 161, 84th Congress)
was for $4b, 000, 800. The appropriation for construction was passed
on 27 July 1956.
2. Even under the most austere standards and conditions it
Was impossible
struet a building which would house all Agency
yeas within the authorised $46, 000, 000. In 1956 the Director
of Central Intelligence recommended to the Congress that the construc-
tion proceed within funds available even though sDm
would be in other locations.
3. The Public Buildings Service acting as our Constru
Agent, awarded the Architectural-Engineering Contract in the amount
of $1, 751, 300 to Harrison & Abramovits early in 1957. Before the
Architectural-Engineering drawings and specifications were complete
Approved For Reiease2001/08/31 : CIA--l DP7&- 4787A179d100010029-4
Approved For Release 2001/08/3 /;,CIA-RDP78-04787A000O90010029-4
l . r ? . 1IAL
the Clearing and Grubbing Contract was awarded on 9 October 1957.
This initial contract was followed by three other major construction
contracts, the final one being the contract for the superstructure
Tompkins-Jones Construction Company on
59
4. Two contracts were awarded for our move to the new building.
Bing when we gained beneficial occupancy of the North portions
of the building in September 1961. The second contract covered our
move into the South portion of the building in February 1962. The
move was completed on 20 April 1962.
S. Through 31 March 1963 there was an =obligated balance of
emaining in the Treasury from our
appropriation.
Approved For Release 20047
/J 7 7'
Approved For Release 2001/08/31 : CIA-RDP78-04787A000100010029-4
TAB
Approved For Release 2001/08/31 : CIA-RDP78-04787A000100010029-4
25X1A
I
25XlA
Approved For ReleasC1001/08/ .: DP78-~4 @ ?~$ 4
-f IN IT !
with the
use of Vmmt apace with
of a sK t-pride wpm* s
is eta, p imia -
estb*tes iuac*U that tale we *cbL*yimi hf uti3i*stim
policies t 'space a+es .
e caasiaticu of the date =ad ftw peariu,
swat be frvom the i 'telr
sib". This iasa date Action Ix
stet cites it
I Pwomal in
cad iuat Rsd pe a. es"lluge in the H,esd~ arkers
tom. In adhii tica to office aad Spec
I by these . amities, spy tom' cmfetft-)^*
etc.# is a ftmishsd.
s e tootW In this builiiug is lm5,OOG and the gnma tquom
2. BQUAUS sped
to accu h a laf
Approved Mgr RI
25X9
me s st ted,. with wmW*mti(m
114!!g and the p wsomw1 to be housod, am
to be meted in t3 bdd4ng by
cu t space psm eim : sit thus be dropped
25X1A
feet of not usable spy end
Approved For Releas001001/08
6J.
0*02* f"t of n
of Spam s amide a total of
apace of vbich 26#215 is davoted, to
As the needs of these activities ObOuger apace Noblems
14
Ling
t duets the square footage p rat by
the ner of ;foe l h ed is es.
E L
ted to the Dgle' sit*, if
fag
iv* ist tttaa sets
sbos a listing of
Approved For Release 2001/08/31 : f-04787A000100010029-4
Approved For ReleaE+2001/08/31 : jTA?8P,8-04787A00010i010029-4
6.
tisaboaft,v Vith
boww
Ilk
Out a" scheduled fCw
'set or net U"bl* ap
8
son" Vnt of not ussbl* sPace
B. W
In the 190
by
17,414 Sara feet
cvi s thato the 14 bbuildimp i:
+ yy,, ~
`1 winber of as compared with 113 usable
r+e 3r is 1 o ooo a
Approved T/
of dom.
tal, apace sues an lab at es,,
C1A-RDP78-04787A000100010029-4
Approved For Release 2001/08/31 : CIA-RDP78-04787A000100010029-4
TAB
Approved For Release 2001/08/31 : CIA-RDP78-04787A000100010029-4
CONE! r5 i
Approved For Release 2001/0*IRD`- 029-4
IAJ
stop No W*
8 St., N. W.
Tom
ems freer
s/c 1 J~ 1963.
Mft. is schsduled for Lund"to
t
k7,
+1,067
Approved For Release 2001/08/31 : CIA-RDP78-04787A000100010029-4
TAB
Approved For Release 2001/08/31 : CIA-RDP78-04787A000100010029-4
(J
8
Approved For Rele! 2001/0
CI P78-04
i 88
TAB C
O Yp B dPM arawww"
to
"MM IBI* F AGIMGY E A13QCdlE
1. In broodly? estisatins our future space re
addition of functions to the
to the activities
for the 19'0
the obangiog state of the art in =xW fields ox is
rt, the Agewy is a dynamic organ-
isation that a st contin~aa.I1t undergo rye to provide amities
can cope with the fast mowing pace of interiaaational affairs. Based on. ex-
perience of recent years in Uses aett+era, we broadly estimate that 200,000
not useable space will be needed as a
satisfy such new space regtair ats for the d,qe ere is the period cen-
tered around 1970- Nowevor, this nest be e
of all 8esdgmsrters cats that will take several month to co +lote,,
for scare of this space W*' already under study for early action
This brood est'iaate of 2000000 sere feet does not
include our i mediate reequireunt for 35,000 square feet of not useable space.
2. If the foregoing estimate of future additional space requirsueents is
being, then our atulaw future space req dreaents for
procurement of space thrQuab 1970 arse:
Immsdis' a needs 35,000 square, feet
gepiace t for Teayporary Buildings
in vest Leo Pirk 151,,167 s ar er feet
acement for four bags arnjected
far possible evacuation in 1965-70 perked 97,E soware feet
Estiaste f o r ad ittonal needs 200,000 square foot
Total pros t requirements
483,752 41i 11J not
C 0 NT MIT
Approved For Release 2001/0$31 : CIA-RDP78-04787AOOO1~0.0'O1t 29-4
Approved For Releaae.2001/08/31 :.,C
I5T78-04787A0001Ap610029-4
VNIDERI;,
nev government buildings are being planned, in which the agcy can
in the time from under consideration Will have to be obtained to satisfy
long tee lease to
requirements is l tical. under present policies
aaiocate d spaces leased apace aeppx aching $6.00 per *quwv toot, per year
0.8
*iniaa sastments.
per .yam. This definite4 indicates an econcW need for con-
struction of a new building or buildings at the aragley site, if such con-
struction can be accaap Listed with the equivalent funds that Would have to
be spent an ar : tae rental costs for teen years or thereabouts. Thera
my be no alternate to rental of part of the space required in the interim
period until construction could be completed. Nowwmrj, early action on cm
struction approval might ma it possible to occupy present locations with
If > construction is to be accomplished at the
2~X1A
Ph 7
site., tz
the Metropolitan area. (See eatery 3 in pew
These buildings provide 237,414 wpm= feet of ui
that contractor
would ultimately man a restal cost approaching
, space should be provides for the
space. Since ae aentely 100,, square feet Will be needed for the dawn
the Director,
overt activities that need to be 11
3T,
sage toot of useable spec. will have to be added
requirements. " bis value vill also heave to be sue-
mentioned in paragraph l above.
Apprl~r1CeN 21/08/3`1 ' C3~A-RDP78-04787A000100010029-4
Approved For ReIeW 2001/08/31 : CIA DP7,8-04787A00Q p0010029-4
QQ1YfiDEi
other req ireeeent needs consideration in aomect with nev
gable space for a concession area.
apparent that
6. As
of a survgr,
structico to a .fir eia is a re&
reeenta centered arod. 1.9
on re .nets fros the seven other
483*7
137,A14 s
24*#00 sq.
To
app 961,750 square feet. Oro" a requirements for custodial
spwe, mfeteria, beer ream, snack bars, etc., are estiaated to
feet. This brings the total gross mqairement to
at the LmnSUW site. This is then d for eea
PIraW%* 2 abom)
tics of a building or buildings ha.
store old be in the best interests of the Apwy
such concessions as a
Ject to .
nst msea ile space rem
in the Weushi n e
641, 03.66 ft.
feet wmdd necessitate construction of a gnm sperm
,062,750 *quo* feet.
gross requirements for cc sstz ction
phase. A s
of +sli 02mmurts or the 3qufart+sre through 1970 not be
take sever. maths. Future optic utilization of the pre t Bmdquart*
building not d et+eai=d frogs the results of this
that mast be fulfilled in the U tropcd i
Apprd 4ke 2001/08/31 -RD.P78-04787A000100010029-4
Approved For Rele2001/083.1 1ARDP78-04787A0001ii0010029-4
end pxeliMIL"aft-ray, c4it est tiles for cQMUMA't cn
deve1a ed f=u the nwU=llj* ~ s a* gds stare foot-
seamy supoCirrtixrg
9. jrc ruts sites for ouch construction cm be ftmUved at
. n tb reliaLus 'af
in the ss mt of *MtO D am
ted ezp ses in the conlct of the g i '
Wit
ma to "Myw"
de to procaed with architecture and desigp
for cadttruction.
Approved For Release 2001/08/31 : CIA-RDP78-04787A000100010029-4
Approved For Release 2001/08/31 : CIA-RDP78-04787A000100010029-4
TAB
Approved For Release 2001/08/31 : CIA-RDP78-04787A000100010029-4
To
FM AGIM
COUAd DO 40M at OAS eost, t I
of eamstrdatIgn 4 Specua
iuzpmw
the , the 1,061,,
Approved For Release 2001/08/
Approved For Relea2001/ 31 : -RDP78-04787A0001W10029-4
" FIDE gj
Approved F;or R` wa ''`
CIA IDR10 A000100010029-4
Approved For Release 2001/08/31 : CIA-RDP78-04787A000100010029-4
TAB
Approved For Release 2001/08/31 : CIA-RDP78-04787A000100010029-4
Approved For Releasa2001/08/31/: ,(T8-04787A000ifl 010029-4
at the L i site shoulA be eee be d
-e a
prc vide messed afficisacy tbrough
be
of 'roe 5 to 6 yaws.
it Is a timsted that an ammat In rest sppcc*ohit *3.t an cOWA
be swftd the nt each year thereafter. 2hU estiameft stems fcw
the setimated rental costs in the fuUwe of 2.8 ash per Yew to
At the end at tt period
am AS"
with pre1ia n pl*nnim an* fm Owooo i in
dutrln6
to Proceed
in the acaluct of this pose of new a tray tion.
cc i be m to initiate 3mmedtet ley t pre.
in time rid be , in the -We sl3.. pao4e .
of counts be fDUOWSd Upon cea at-i on of the pare-
v e~asetl /68 C- A 01 1
ExciUded him TOOMIt ev
Approved For Releasao,2001/08/31/jIFIF
78-04787A0001QA10029-4
Approved For Release 2001/08/31 : , R~78-04787A000100010029-4