AGENCY STUDY OF SPACE REQUIREMENTS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-04787A000100110012-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
November 11, 2016
Document Release Date: 
March 31, 1999
Sequence Number: 
12
Case Number: 
Publication Date: 
August 31, 1965
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78-04787A000100110012-1.pdf120.9 KB
Body: 
-Sanitized - Approved For Release - DP78-04787A000100110012-1 3 1 AUG 1965 MEMORANDUM FOR: Deputy Director for Support SUBJECT : Agency Study of Space Requirements REFERENCES : (a) Your Memorandum dated 13 August 1965 to D/L, subject as above (b) Your Memorandum-of 5 August 1965 to the DDCI; subject, Planning for Ex- pansion at Langley Headquarters Site 1. This memorandum contains recommendations for your approval; such recommendations are contained in paragraph 5 below. 2. Pursuant to your direction contained in the above references, a Space Requirements Staff has been established to undertake the in- house study. The Staff is responsible to the Chief, Real Estate and Construction Division, and consists initially of the following personnel: 25X1A 3. In conducting the study the following criteria will serve as guidelines: a. All Departmental activities will be examined. b. Current space requirements will be reviewed and un- satisfied requirements identified. c. Projected space requirements will be developed in the light of the Agency 15-year plans, manpower limitations and other considerations including but not limited to functional relationships, support relationships, and states of the art. Sanitized - Approved For Releasi"EME& 000100110012-1 Sanitized - Approved For Release..A-RDP78-04787A000100110012-1 d. The review will not be restricted by constraints of cost, availability of real estate, number of buildings, or the location of currently occupied space. 4. The end product developed by the Staff will be a summary space directive reflecting current and projected space requirements. This directive will be similar to the one previously developed for the Headquarters building. Special requirements for space will be ex- plained, and appropriate analysis and recommendations provided. The following tentative schedule is considered reasonable for comple- tion of the study, provided Agency components meet the 28 February deadline noted in (c) below: a. Develop the detailed procedures, criteria, and forms for conducting the study (1 September - 30 September). b. Initial visits to the Deputy Directors' designees to discuss the Staff's objective, procedures, forms, and criteria to be applied and the ultimate product (I October - 15 October). c. Visits to offices within the components, and submission of their final reports (16 October - 28 February). d. Analysis of data including follow-up visits to components as required (1 March - 31 May). e. Preparation of the final report, justifications, observa- tions and recommendations (1 June - 31 August). 5. It is. recommended that a memorandum to other Deputy Di- rectors (draft attached) be released and the study criteria herein be approved. 25X1A GE E. MELOON Attachment Draft of Memo Di3-fictor of Logistics Approved: /0 25X1A tc.. L. L anise rman Deputy Director Sanitized - Approved For Release 4;' , 7 DP78-0478-IA*G*tDA#4 0012-1 4 ? Sanitized - Approved For Releas SUBJECT: Agency Study of Space Requirements Distribution: Original - OL/RECD 2 DD/S 1 - OL files 25X1 A OL/I ECD/ (30 August qwm~~ Sanitized - Approved For Release . }A RQP78-04787A000100110012-1 RDP78-04787A000100110012-1