Body: 
r CIA PROJECT NO. ADVICE OPROJECT ACTION Ref: 00-24448) TO: ASSISTANT DIRECTOR, ORE PROJECT TITLE FOIAb Additional Construction and ASSISTANT DIRECTOR, OSO FOIAb3bl Material for Project 00 ASSISTANT DIRECTOR, 00 ASSISTANT DIRECTOR, OCD FXI CHIEF, BUDGET AND FINANCE BRANCH CHIEF, SERVICES BRANCH PROJECT DURATION 0,000 of vouchered funds for Lam: remainder of fiscal year 1949 _ FOIA _ DESCRIPTION AND SCOPE OF PROJECT In fiscal year 1948, funds were allocated for the construction M That allocation was based on he by estimate supplied In order to stay within the contract allocation, it was necessary to 25X delete certain. items of the project as approved because the construction cost exceeded the estimate and there were no funds. It is 25X desirable that those deleted items now be reinstated in the ver project by a obligating 28,956.00 to clear the 25X -strand Ian - re enc ensure; and Instal s corm sash, site,; erect3 b bed t screens, and metal venetian blinds in the Operations building; and in addition to those deleted items, to paint the exterior of the metal building and to ins storage water tall outlets for the irrigation of the lawns; and (b) allocating an onal am amount of additional $1, 044.00 the procurement of necessary materials such as posts; post braces; wire; hose; sprinklers; etc, SUMMARY OF ESTIMATED COSTS OBJECT CLASS VOUCHERED UNVOUCHERED TOTAL 01 Personal Services $ Doclira0 No. _.,____ ` 02 Travel @ /e a t40 t`*h'c1t3gQ In Class. 03 Transportation of things an 04 Communications sified 05 Rents and U t i l i t i e s D(a S. Charged Tai TS $ 06 Printing and Binding Aiii'h.: FR 70-2 2t?_ 07 Other Contractural services 28,956.00 H Z'; _22 _SEP_i97S._ By: _RQ:~ ? .00 08 Supplies and Materials .,044,00 3 804 ,00 09 Equipment Other TOTAL 30,,000,00 $ $ 30,000.00 SPECIAL PROVISIONS OR LIMITATIONS These changes and additions to be accomplished as an extension of the present contract, ~Tt d RECOMMENDATION (PROJECTS REVIEW COMMITTEE) r