ANNEX A
1. Convert conunercial power installation to three
phase with a relocation of the high tension line. Install
transformer capacity of at least 75 KVA.
2. Install two 75 KVA generators for standby service.
The single phase unit installed at - and a single
phase unit in stock to be converted to three phase, four
wire.
3. Construct a 20' x 20' concrete block building west
of the vault to house the standby generators.
4. Move the underground fuel tank installed for the
present generator to new location along side proposed build-
ing. Install another 1,000 gallon underground fuel tank.
5. Change to full three phase operation.
Loads to other ui c gs o balanced across phases.
Estimated Cost $15,000