NOTICE: In the event of a lapse in funding of the Federal government after 14 March 2025, CIA will be unable to process any public request submissions until the government re-opens.

RECOMMENDED CHANGES(Classified)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-04915A000400010093-7
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
1
Document Creation Date: 
December 9, 2016
Document Release Date: 
August 16, 2001
Sequence Number: 
93
Case Number: 
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78-04915A000400010093-7.pdf30.64 KB
Body: 
Approved For Release 200 ANNEX A 1. Convert conunercial power installation to three phase with a relocation of the high tension line. Install transformer capacity of at least 75 KVA. 2. Install two 75 KVA generators for standby service. The single phase unit installed at - and a single phase unit in stock to be converted to three phase, four wire. 3. Construct a 20' x 20' concrete block building west of the vault to house the standby generators. 4. Move the underground fuel tank installed for the present generator to new location along side proposed build- ing. Install another 1,000 gallon underground fuel tank. 5. Change to full three phase operation. Loads to other ui c gs o balanced across phases. Estimated Cost $15,000 Approved For Release 2001/08/31 : CIA-RDP78-04915A000400010093-7