JUSTIFICATION FOR ADDITIONAL FACILITIES

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-04915A000400020053-0
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
5
Document Creation Date: 
December 9, 2016
Document Release Date: 
August 28, 2001
Sequence Number: 
53
Case Number: 
Content Type: 
REQ
File: 
AttachmentSize
PDF icon CIA-RDP78-04915A000400020053-0.pdf205.41 KB
Body: 
Approved For Release 2001/09/03 : CIA-RDP78-04915A000400020053-0 Approved For Release 2001/09/03 : CIA-RDP78-04915A000400020053-0 Approved For Release 2001/09/0 : C3 IA-RDP78-04915A00.0400020053-0 TMOV Annex 4 Justification for Additional Facilities 1. Paving - Outside East: Estimated Cost - $36,768.00 a. Widen road to 30 feet: The present road in this area is 17 feet wide which does not allow trucks to pass. When widened to 30 feet, trucks can pass and maneuver on this road as required* b. Paved Storage Area: By paving this area, 26,800 sq* ft. of space will be provided for outside storage. No hard surfaced outside storage is now provided. The condition of the soil during wet weather precludes the use of this area for storage until paved. An estimated 18,000 sq. ft. of storage space is now occupied within the warehouse by dumber and other material which should be in outside storage. This area is also required for storage of vehicles now being stored in borrowed space. c. Pave Vehicle Shed Area: This area is required for the storage and protection of vehicles as described in t2t below. This will provide a paved area within the vehicle shed and a 30 foot area in front of the shed for ingress and egress of vehicles. d. Pave Area in Front of Truck Dock: This area is required to allow- trucks to park at the truck dock. e. Pave Approach to Ramp: This area is required for the movement of vehicles into and out of the building as described in paragraph 3. 2. Vehicle Shed: Estimated Cost - $14,902.00 This structure is required to house some 20-25 trucks which are operated by the depot. There is no facility available for the protection of these vehicles. Vehicles are often loaded in late-afternoon to allow early start the following day, thereby necessitating protection for materials as well as the vehicles. 39 Truck Dock, Ramp and Canopy: Estimated Cost - $14,109.56 a. Truck Dock: This dock is required on the East Side of the building to provide for the loading and unloading of several vehicles simultaneously, to increase the rate of loading and unloading, and to allow loading and unloading of heavy equipment from the side, and maneuvering such equipment which is not possible when loading and unloading through the warehouse doors. As dictated by security requirements, this dock will also be used to park gasoline powered materials handling equipment at night and when Approved For Release 2001/09/03 : CIA-RDP78-04915A000400020053-0 Approved For Release 2001/29/ ,.6 A DP78-04915A0000400020053-0 not in use. Local deliveries are made from this side of the buildings b. Truck Dock Ramp: This ramp is required for the ingress and egress of material handling equipment moving lumber and other materials into and out of the warehouse. It will also provide the only means of getting vehicles into and out of the building. c. Truck Dock Canopy: This fixture is required to protect men and material from the elements during inclement weather. It will allow uninterrupted operation during rains which would not be possible without it. 6. Paved Area, West Side: Estimated Cost - $4,536.0? STATINTL This area is adjacent and is required so that trucks may maneuver in the vici y o 51 A I N I C 7. Pave Parking Area: Estimated Cost - $1,890.00 5 Iv This consists of an area 100 feet long and 15 feet wide and will provide parking space for approximately 75 cars which are parked in the area daily. This area is now being used without any hard surfacing, but is extremely muddy in wet weather. Approved For Release 2001/09/03.-4M t WYM-04915A000400020053-0 Approved For Re a 2001/09/03 : CIA-RDP78-04915A0000400020053-0 MOWN-- --- hb 8. Inside Storage Area Installations: Estimated cost - $1,150.00 a. Connect refrigeration unit, sprinkler and lights in vault: A refri- gerated vault is required to store photographic supplies and other items requiring refrigeration. The cost of this requirement consists of the installation of an Agency-owned refrigeration unit outside the vault, extension of the sprinkler system below the vault ceiling, and install- ation of light fixtures within the vault* b. Sprinkler and Lights - Depot Service Office: This requirement consists of extension of the sprinkler below the ceiling of an office operated by the Depot Service Section, and installation of light fixtures in that office. 9. TSS Shop Area: Estimated Cost - $36,500.00 , an air conditioning for all but the storage area. The air conditioning is required to eliminate sounds from other areas through the main ventilating system, and to prevent the hazards of personnel working with high voltage under conditions creating perspiration. The high voltage arrangements will be in accordance with safety requirements of the Security Office. 10. Communications Engineering Building: Estimated Cost - $20,000.00 This building is required in the design, evaluation, fabrication, install- ation and maintenance of commo gear. This function is now being performed in various unsatisfactory locations, or not at all, awaiting these facilities. This function should be within the vicinity of the storage operation since this function includes the acceptance test of power generating equipment. Some of the functions of this unit cannot be performed within the main building because of the fire hazard involved and security considerations. The pressure of current and contemplated contracts for mobile equipment de- mands the acquisition of suitable facilities for the accomplishment of the above mentioned services. For economy reasons, the generator testing and workshop functions have been combined, thereby resulting in judicious use of common facilities. This building is 40' x 42'6" and includes a welding shop and paint shop. The paint shop and welding shop installations will be in accordance with safety requirements of the Security Office. Approved For Release 2001/09/03 : tIA-PDP78-04915A000400020053-0 Approved For Release 2001/09/0 78-04915A000400020053-0 11. Medical Requirements: Estimated Cost - $3,500.00 a. Sink and Running Water: These facilities are required in the medical supply area. Medical. items handled include drugs, acids and other corrosive substances, and dictate the necessity of employees to wash their hands between operations to avoid contamination of materials, and to prevent the possibility of severe burns. The nearest sink to this area is 270 feet away. STATINTL b. Health Room: A health room is required because are to be employed in the depot. The depot is in a relatively isolated area and is distant from any type of medical facility. The type of work performed, e.g., use of cutting tools, increases possibility of injury. Specific requirements for this facility are a sink and a commode. 12. Security Requirements: Estimated Costs - $1,225.00 a. Sprinkler System Alarm: A sprinkler system alarm is required within the guard room. At present the system is located in a building occupied by GSA, 1,200 feet from our guard room. There is only one guard on duty in the GSA building after normal duty hours and he must patrol the entire building. be Installation of Firegongs: These firegongs are required inside the building. Firegongs are now installed outside the building and cannot be heard inside of building to warn personnel of danger in case of fire* c. Separate Control Switch: A separate switch is required to control interior lights and exterior floodlights. The inside lights are now controlled by four separate panels, and the. exterior floodlights are controlled by the guard office in the adjacent GSA building without regard to our requirements. -4- Approved For Release 2001/09/03. CIA-RDP78-04915A000400020053-0 -000