(Sanitized) REPLACEMENT CONSTRUCTION PROGRAM

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-04983A000100060018-3
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
December 9, 2016
Document Release Date: 
November 21, 2000
Sequence Number: 
18
Case Number: 
Publication Date: 
March 20, 1956
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78-04983A000100060018-3.pdf84.93 KB
Body: 
.. r Approved For Releas~ FQ~TjVic-Gam'--x-u.-,_.r~. -o'7i ~'001/0y /N l~83/~0? 8 SEC;R'ET 20 March 1956 25X1A2d2 25X1A6c 25X1A9a 25X1A2d2 25X1A6a TO : Acting Chief, Real Estate and Construction Division THRU: Director of Logistics FROM: Construction Engineer, SUBJECT: General: Specific: Replacement Construction Progr REF: dated 16 February 1956 ACTION REQUIRED:. None, Information s are in concert with considerations and discussions revious p field. p ~ ,Y made in the f DocamI,# No. ' .- 0 01ta i e in C1333. ----------? I ~ lien Ay'a'?' ? I Is, n"gid To: TS .ti dee go: HR 70.2 1. The comments and suggestions of o the reference have been'noted with interest as a number of these Dint a. The water line mentioned has been installed in a more direct route which will appear on the "As Built" drawings. Preservation of natural cover and accessibility were considered. b. All water sources are of critical contarm nation, Chlorination to the supply tank and to the booster pumps is therefore considered advisable in concurrence with Engineers' recommendation Past experience in the area indicates overheating of generating equipment by sheltering from prevailing winds. Thvdderstorms are rare and it is desired to take full advantage of maximum ventila- tion. If found necessary, a louvre protection may be installed later on. co Plans do not call for sloping the tank floors as infrequent draining and cleaning will be done by brooming. However, this may be adjusted in the field if no additional cost is involved. d. We are advised that the redwood storm drain covers meet requirements and precludes use of weight handling equipment for maintenance. e. Drawing No. 699-585 indicates that drainage of the car shed and apron have been providede_ Field adjustments will be made as necessary to obtain adequacys f. The Receiver installation has been suspended pending GHQ conference No further information has been received at this Station. Request HQS advice SAP. The catenary clearance had been "caazght" in the field. uus 0CU U1 sue i zela. k au 6"\P`M .H-' i \I I - h -Y ow V U. t!rnn~nn GQ 0918, n.} }~~ 25X1A 25X1A9a 2. A supply of cast iron pipe has arrived and utilities installations are progressing. It is not desired to encumber Headquarters with detail review of the uti1it 1