.. r Approved For Releas~ FQ~TjVic-Gam'--x-u.-,_.r~. -o'7i
~'001/0y /N l~83/~0? 8
SEC;R'ET
20 March 1956
25X1A2d2
25X1A6c
25X1A9a
25X1A2d2
25X1A6a
TO : Acting Chief, Real Estate and Construction Division
THRU: Director of Logistics
FROM: Construction Engineer,
SUBJECT: General:
Specific: Replacement Construction Progr
REF: dated 16 February 1956
ACTION REQUIRED:. None, Information
s
are in concert with considerations and discussions revious p
field. p ~ ,Y made in the
f DocamI,# No. ' .-
0 01ta i e in C1333. ----------?
I
~ lien
Ay'a'?' ? I Is, n"gid To: TS
.ti dee go: HR 70.2
1. The comments and suggestions of o
the reference have been'noted with interest as a number of these Dint
a. The water line mentioned has been installed in a more direct
route which will appear on the "As Built" drawings. Preservation of
natural cover and accessibility were considered.
b. All water sources are of critical contarm nation, Chlorination
to the supply tank and to the booster pumps is therefore considered
advisable in concurrence with Engineers' recommendation
Past experience in the area indicates overheating of generating
equipment by sheltering from prevailing winds. Thvdderstorms are
rare and it is desired to take full advantage of maximum ventila-
tion. If found necessary, a louvre protection may be installed
later on.
co Plans do not call for sloping the tank floors as infrequent
draining and cleaning will be done by brooming. However, this may be
adjusted in the field if no additional cost is involved.
d. We are advised that the redwood storm drain covers meet
requirements and precludes use of weight handling equipment for
maintenance.
e. Drawing No. 699-585 indicates that drainage of the car shed
and apron have been providede_ Field adjustments will be made as necessary
to obtain adequacys
f. The Receiver installation has been suspended pending GHQ
conference No further information has been received at this
Station. Request HQS advice SAP. The catenary clearance had been "caazght"
in the field.
uus 0CU U1 sue i zela. k au 6"\P`M .H-' i \I I -
h
-Y ow V
U. t!rnn~nn GQ 0918, n.} }~~
25X1A
25X1A9a
2. A supply of cast iron pipe has arrived and utilities installations are
progressing. It is not desired to encumber Headquarters with detail review of
the uti1it 1