'Approved For Release.2-091/04/09: CIA-RDF7$;;05327A000300040010-8 SECTION 4:.. - ROOF1N9;. 3 PLY. BUILT-UP 4-01? SCOPES The work covered by this section of the specifications consists in furnishing all plant,., labor-,.equipment., appliances and materials not furnished by the Government, and in performing all operations in connect- ion with the installation of built-up roofing, complete, in strict accordance with this section of the specifications and the applicable drawings, and subject to the terms and conditions of the contract. 4-02 APPLICABLE SPECIFICATEONSI The following specifications of the i,ssues?listed below but referred to thereafter, by basic designation only, form a part of this specifications a, Federal Apecificatignss HH-F-185 Felt, Asbestos; Asphalt-Saturated, Uncoated for Flashin , Roofing & Waterproofing 3S-A-666 Asphalt; (for Built-Up Roofing.& Waterproofing SS-A-701 Asphalt-Primer) (for) Roofing and Waterproofing SS-C-153 Cement; Bituminous; Plastic STATI NTL ': 4-03 GENERALS Asphalt built-up=roofing shall be applied to the roof surfaces-indicated on the drawings. Metal flashings shall . conform to the requirements of section o9 SHEET METALWORK, AND MXSCELLAN AUS W='. 4.04 MATERIALS: a, ,,A~~s..P~,haltt for hot application shall conform to Federal Speci- fication SS-A-666, type II, Grade 2, Class A, having a softening point of 190 degrees F maximum and 160 degrees F minimum. b, Asphalt primer shall conform to Federal Specification SS-A-7C1, c. Perforated asphalt-saturated asbestos- ,felt shall conform to the requirements of Federal Specification HH-F-185, type I, Class A. d, P astir bituminous cement shall conform to Federal Specifi cation SS-C-153. Type 1 shall be used in conjunction with asphalt-saturated felts. Approved For Release 2001/04/09 : CIA-RDP78-05327A000300040010-8 STA I,rTL d For Release 2001/04/09 : CIA-RDP78-05327A000300040010-8 4-05 PREPeRATIQN OF SURFACES: The construotion of any bay` 9x-section section of .roof ' shall be completed before roofing work is begun. Roofing ,Ahall..not start uhtil roof surfaces' are pnooth, firm, dryand free from high spots, depressions and all loose and foreign material, rand- nave been inspected ?,., and approved by the Contracting Officer. Vents and-other projections through roofs shall be properly flashed and secured iii position. 4-06 APPLICATION OF ftOOFING~ a;" ens Three-pay asphalt built=up"t+oofing shall be installed on the prepared concrete roof decks. Asphalt shall not be heated above 400 .degrees F. Felts shall not be out into varying lengths'befof+ laying, but shall be unrolled from the full roll immediately following the asphalt mop- ping, The felts shall be laid by the shingle method afid' all surfaces of felt must be fully covered with hot asphalt so that in no case shall felt touch felt.` Theirblis of felts shall be stacked in properly protected piles ;uiitil ready for use. The mopping shall in no case be 'more than 5 feet ahead.of the application of felt. Felt shall always "be dry when applied, Mopping temperature of asphalt shall be 350 to 375 degrees F. Layers of felt shall be rolled accurately in 'place, free from. 'wrinkles and buckles, and broomed into the cement using an approved roofing broom. Each layer shall be cemented solidly. b. Method o is a t n; The prepared roof surface shall be uniformly coated with asphalt primer, using not less than one gallon per 100 square feet. The primer shall bp, allowed - to dry, When the primer has sufficiently dried, a uniform coating of hot asphalt shall be applied over the primer, using not less than 30'pounds per 100-square feet. Over this coating of asphalt, three layers of 36-inch perforated asphalt-saturated asbestos felt shall be laid, lapping each sheet 241 inches over the preceding sheet. Ends of the sheets stall be lapped not less than 6 inches. When 32-inch felt is used, sheets` shall be lapped 22'-inches,' The full width of the lap of each of these three sheets shall be mopped with hot asphalt, using not less than 20 pounds per 100 square feet. Felts shall be cut off at abutting vertical surfaces. When the laying of the three layers of felt is already.. completed,, the entire surface shall)be boated uniformly with hot asphalt, using not, less than 60 pounds per 100, bquare feet. o. Material Requirements The roofing shall contain not less than the following quantities of, materials per 100 square feet, Approved For Release 2001/04/09 : Clkt P78-05327A000300040010-8 Approved For Release 2001/04109 CIA7RDP78-05327A000300040010-8 Asphalt Primer ----------------.~-- --,.,....._,. >:.,. 7.5 lbs 3. Layers of Perforated.Qsphalt- Saturated.Asbestos Felt ----' --Mr--------y.----- 45 The Asphalt ------ -_e-.-_..--------------- .,~.~----_----- 130 The 407 ROOF EDGE FLASHING specified in section on SHEET META,LWCRK AM MISCELLANEOUS METAL shall be installed where indicated on the drawings. The edge flashing shall be installed before the application of the roof ATINTL %we coating and shall be cemented to the roofing with asphalt-base plastic ce-laent and bolted. The flashing shall then be covered with hot asphalt coating to the thic2cness indicated on the drawings. 408 ROOF CO TINGs The finished roof surfaces shall be coated with aspt::.alt base aluminum coatin conforming to the requirements TINTL The rate of application s ReIRW accordance w .mane ac urer s 1as ruction. A minimum of 30 days under favorable conditions or longer, if necessary, as drpcted by the Contract- ing Officer, is to be allowed for drying time of roofing before applying roof coating. 4-03 Approved For Release. 2001/04/09: CIA-RDP78-05327A000300040010-8