AGENDA MEETING NO. 56 RESEARCH, DEVELOPMENT AND PRODUCTION REVIEW BOARD

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-05462A000100040010-0
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
4
Document Creation Date: 
December 22, 2016
Document Release Date: 
February 16, 2010
Sequence Number: 
10
Case Number: 
Publication Date: 
May 2, 1956
Content Type: 
AG
File: 
AttachmentSize
PDF icon CIA-RDP78-05462A000100040010-0.pdf125.46 KB
Body: 
Sanitized Copy Approved for Release 2010/02/16: CIA-RDP78-05462A000100040010-0 Research, AGEtTDA Meeting No. 56 Development and Production Review Board Room 2035 "T" Bldg. - 1+30 hours I. Old Business: 1. Review and Approval of the Minutes of Meeting #55 and of the Special Meeting held 18 kpril 1956 and 19 April 1956 II. New Business: Report of current projects in the Research and Development laboratory- 2. Report by Operations & Training Division on projects assigned by the Research and Development Board Discussion of budgeting for development items that may go into production during fiscal years 1957 and 1958. Doc KEY DATE 8 DCIG COMP am DPI TYPE ORIG CLASS -5-- PAGES _L REY CLASS S JUST Z.2 , NEXT KEY ZD I b AUTHI Sanitized Copy Approved for Release 2010/02/16: CIA-RDP78-05462A000100040010-0 Sanitized Copy Approved for Release 2010/02/16: CIA-RDP78-05462A000100040010-0 S-E-C-R-E-T MINUTES Research, Development and Production Review Board I. Meeting #56 of the Research, Development and Production Review Board was held in the OC Conference Room at 11+30 hours on 2 May 1956. The following persons were in attendance: This meeting was continued at 1330 hours on 3 May 1956 in Room 21+13 "I" Building. The following persons were in attendance: II. Under Agenda Item 1, Old Business: The Minutes of Meeting #55 and the cial meeting of 19 April 1956 Were approved, and it was noted that name was 25X1 inadvertently omitted from the list of t ose a en ng Meeting #55, and attending the special meeting on 19 April 1956. III. Under Agenda Item II, New Business: 1. Report was made to the board of the current projects at the Research and Development Laboratory. 2. The Operations and Training Division reported as follows: a. That a decision had been made to permit the Laboratory to construct five AR-2 units for operation from 6 volt source and a balance of units to be AR-3 type with a 12 voltage primary power source. In the future any additional AR-3's will utilize 12 volts as a power source. Sanitized Copy Approved for Release 2010/02/16: CIA-RDP78-05462A000100040010-0 Sanitized Copy Approved for Release 2010/02/16: CIA-RDP78-05462A000100040010-0 1~ 1400 I( b. A survey had been made to determine how many base station units were available in Comma stock. It was determined Board to O&T for a p determination as to present and future 25X1 equipment requirements was still under study. f. Training of Operations personnel for activating of a was in progress. since this type of unit does not generally exist in foreign areas. d. Operational tests are being run jointly by O&T and Engineering on the =single side band equipment (SSE-1). The -j-Pt assigned by the Research and Develo ent that there was one unit in_nd one unit in the Laboratory. c. The Operations & Training Division is continuing its evaluation of the CV-1 transistorized converter. It had been determined that the present units would not operate satisfactorily with an AC-DC type of receiver, but this was not considered to be a serious problem g. Two military equipments were being investigated as to their use for cargo chute location and/or drop zone beaconry. They are the AN/PRN-3 and the AN/PRN-2. Units will be obtained for evaluation. 3. Discussion of budgeting for development of items that may go into production during Fiscal Years 1957 and 1958. The following recommendations were agreed to by the Boards 1957 1958 a. Solid State Component s $ ---- $ 50,000 b. ligh Speed Agent Sets ---- 2,000,000 c. RS-l1A&B, RP-11, RS-1 1 land'Generator, RR- 11AA/BB 3,000,000 ------ d. Semi-automatic Duplex Set AS- 3---- 200,000 25X1 , e. Facsimile Equ ipment ---- 30,000 25X1 f. E:::]Receiver ---- 5,000 g. Reuseable Tape ---- 2,000 h. ET-2 50,000 ------ i. Power Sources 25,000 ------ J. 0 Equipment 100,000 ------ k. Semi-automatic Duplex Station Equipment Base ---- 75,000 1. Equipm ent 10,000 ------ m. Electronic Keyers 10,000 ------ n. Electronic T-R Switc hes 2,500 ------ Sanitized Copy Approved for Release 2010/02/16: CIA-RDP78-05462A000100040010-0 Sanitized Copy Approved for Release 2010/02/16: CIA-RDP78-05462A000100040010-0 S-E-C-R-E-T The Meeting of 3 May 1956 concluded at 1630 hours. 25X1 D triloutions Members and those in a endance listed in Paragraph I R&D Internal Projects R&D External Projects Sanitized Copy Approved for Release 2010/02/16: CIA-RDP78-05462A000100040010-0