AGENDA MEETING NO. 53 RESEARCH, DEVELOPMENT AND PRODUCTION REVIEW BOARD

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-05462A000100040015-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
4
Document Creation Date: 
December 22, 2016
Document Release Date: 
February 16, 2010
Sequence Number: 
15
Case Number: 
Publication Date: 
February 1, 1956
Content Type: 
AG
File: 
AttachmentSize
PDF icon CIA-RDP78-05462A000100040015-5.pdf210.51 KB
Body: 
? Sanitized Copy Approved for Release 2010/02/16: CIA-RDP78-05462A000100040015-5 8-R-C-R-E-T AG WA Meeting No. 53 Board Research, Develcrnen t aad Production Review l Yebruary 1956 Room 2035 "I" Bldg. - 1430 lours I. 034 Bx neast 1. Review and Approval of the Minutes of Meeting #52. 11. Idev Business: 1. Review of the Research and Development Program. 2. Presentation of report on [3ield teats and discussion of requirement for production of additional 0 units. DOD REV DATE - ORIG COMP OPI = T DRIG CLASS PAGES REV CLASS JUST ZL NEXT HEY LCZ- AUTM7~7 Sanitized Copy Approved for Release 2010/02/16: CIA-RDP78-05462A000100040015-5 Sanitized Copy Approved for Release 2010/02/16: CIA-RDP78-05462A000100040015-5 S-E-C-R-E-T Under a nda Item I, old Businesss 25X1 25X1 25X1 III. NGI1UTES Research, Development and Production Review Board Meeting #53 of the Research, Development and production Review Board was held in the OC Conference Room at 1430 hours on 1 February 1956. The following persons were in attendances The 'unites of !Meeting #52 were reviewed and approved by the Board. Under Benda Item II, New Business 1. The Engineering Division representatives gave a run-down on th from isid tests conducted in October ov a and, in November over the path fr o 7 t in these discussions as s reli- d ou t was pointe 25X1 vas concerned in transmitting by the Osystesm, a Al rah ability- dio teletype circuit at degree was obtained. When compared to a ra a given time, the0 system does not exhibit any higher degree of reliability, but over a period of time by virtue of 0 capability of passing greater volumes of traffic, a much higher overall reli- t from an ordi-na teletype system. th h OC-E ACTION a an ability is obtained t returned Engineering Division proposed that the existing equipments be to the contractor d that they then be installed on a lifk betwee The Board concurred in this proposal. The Engineering Division was also requested to submit a recc tnendation as to the number of additional units of approval t present e,4 . m ant that should be proeurred and to obtain the the members for this proposal on an ad hoc basis Sanitized Copy Approved for Release 2010/02/16: CIA-RDP78-05462A000100040015-5 Sanitized Copy Approved for Release 2010/02/16: CIA-RDP78-05462A000100040015-5 Now, 11"W The O representatives requested that we explore with the 25X1 contractor the possibility of using the FRT-5 or 207-A transmitter as well as the 231 D for the system. It was also recommended OC-E by O&T that the Zginaering Division explore the value, if any, of ACTION utilizing the existing B-390 receiver in place of the one incorporated in the existing equipment. 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X,25X1 25X1 25X1 25X1 The Engineering Division indicated that a discussion had been held with the contractor and NSA looking toward the addition to the SPIT system of a high-speed on line cryptographic system and a high- speed, printer, so that fu l advantage could be taken of Ohigh traffic transmission capabilities. 2. Field Tests. The Chairman requested information as to the s to s thaw field tests rec n8ed by the Board action of 2 November 1955. The O&T representatives stated that because of the shortage of manpower,, nothing had been done on this project. The ring representatives informed the Board that equipment at had been moved into the main operating room and that approximately two or three weeks additional time would be required to have it in working order. The Chief Engineer indicated that a member of the Plant Engineers Branch would be going tohortly on a TDrY basis in connection. with some other work and suggested that this man might carry a Dunit with him and initiate transmissions from the sight. It was pointed out that this should be a fairly represe ntative test, since the individual concerned has had no OC-E & previous training or experience with rent. The Engineer 25X1 25X1 OC-M will also brief Operations personnel on the 0 equipment ACTION and arrange for them to pass live traffic on the equipment. It was agreed that this proposal would be accepted and that the details would be worked out between O Division and the Bagineering Division. The Executive Officer introduced a discussion ova le stated that there bad been prepared in the Office of Camnunications a letter directed to the DI)/P Materiel Board which in effect divorced the Office of Coma tmicativns from any further work in this field as regards (a) the ultimate beacon and (b) the beacon. The Office of Communications would continue some testing on the ARA-250 CRC-11 system. Additionally, the Office of Qcmnuni- cations would accept the responsibility for the control issue, training, and maintenance in regard to any The Executive Officer stated, that the Agency had recently received a lette requesting a policy decision in the field at1 with particular attention to the matter of compata systems, and its effect on the The Executive Officer felt that until such a policy assn d in view of the Office of Communications relation- ship wit in this field, that the present letter to the DD/P Materiel Board should not go forward. B E-C-RE-T Sanitized Copy Approved for Release 2010/02/16: CIA-RDP78-05462A000100040015-5 Sanitized Copy Approved for Release 2010/02/16: CIA-RDP78-05462A000100040015-5 S-E-C-R-E-T including a questioning of the need for I lati a -L L to a1? O.L ?- to be the feeling of the Board that ifht the interim prtoi~oa could be concluded very shortly that to t nt of an effective, oompatable,iL1 ake on the development .~1._-. _,,.,._.cas,, VA" Af mc+t]wai rm an the whole matter 25X1 25X1 1 would be vt realistic and furs system providing the DD/P would preps a 25X1 25X1 operational requirements. set that the proposed letter to the DD/P conch d ll fi . na y it was OC-F Materiel Board should be rewritten by the Engineering Division peke ACWION should indicate that further discussions with the a'WrOPriate should be held in this matter before coming to any final determination- Board meeting will be 7 March 1956. 25X1 5? It was noted that the current review of R&D Projects has not yet been oo leted by the Board. The meeting adjourned at 1630 hours. The next meeting of the Ideas and Requirements Panel will be held on 15 February and the next Regular %stributions Members and those attendance listed in Paracaph I R&D Internal Projects R&D External Projects S-E-C-R-E-T Sanitized Copy Approved for Release 2010/02/16: CIA-RDP78-05462A000100040015-5