EXCESS AGENCY STOCKS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-05538A000200050001-4
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 9, 2016
Document Release Date: 
April 3, 2000
Sequence Number: 
1
Case Number: 
Publication Date: 
April 18, 1958
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP78-05538A000200050001-4.pdf167.92 KB
Body: 
ppr~, -`d" or a ease 000/08MUMW-RDP78-05538A000200050004 -4 Change In Cass. ^ #Na~ a1d -2 d 18 APR 1958 SSA (Comptroller) see Agency Stocks Memorandum dated 13 March 1988, from Chief, '/8 to SSA-3/8, subject same m above Gass. Cha:egvd To: TS S C : HR 7C?2 c~th . Date: --- ------ Byi Reference memorandum recommended that the BSA-DD/8 I a total examination of the surplus materiel stocks .on and the development of policy and procedures under -plus materiel can be made available to operational e-ctivitiee without fiscal billing against the activity, and irrespective of the current programed level of the activity. 9. Under present procedures excess or surplus property may be issued to requesting components provided that the cost barge for such property does not increase thee total costs of the operation to an amount in a*cess of the total project approval. In cases where the total property authorization of has not been exceeded, additional property authorization is Issued to cover the cost charge to the project for the value of the excess or surplus property requisitioned. When the dollar level of the project approval has been reached additional ro1ect approval by the appropriate approving authority ty authorization will issued based an an increase in ovtded that the property required is on hand and will not be replaced when issued. This procedure is based on the principle that the ICI or other approving authority, in approv-- ing a project at a given dollar level, intends that the sum of all things of value furnished for the operation of that project (,whether it be funds, new materiel purchased, normal stocks on hand or surplus stocks) should not exceed the dollar level of the project approval. assumed that the *misting Agency policy is, wherever possible and without detriment to operational needs, to make use of Agency owned surplus materiel rather than male purchases of similar items. Instructions for preparation coordinated with the Office of logistics or its represeentw sot Outlines require the preparation of a logistics Phis annex details the estimated logistics requirements tivo prior to the projects being forwarded for approval. The Approved For Release 2000/08/29 : CIA-RDP78-05538A000200050001-4 Approved For Release 2000/ 1,4-RDP78-038A000200050001-4 :, MU tics should make the determination an to _w_ i or not all or part of those items can be satisfactorily abed from stock or by purchase. If there is any doubt should consult the operational element concerned. Since the present procedure is based on the above- mentioned Agency policy regarding project approvals, it is the opinion of this Office that no change should be Made in the present procedure for requisitioning of excess Agency stocks. 25X1A Distribution: Orig. & I - Addressee 1 - Signer's copy 1 -OL 1 -- TAS Subject 1 - TAS Chrono 1 - TAS Reading TAS/LLR/mlc(1l April 1958) co: pp y v' -s on, office of Logistics Approved For Release 2000/0872c.?: tIA-RDP78-05538A000200050001-4 Approved For Release 2000/08/29 : CIA-RDP78-05538A000200050001-4 MISSING PAGE ORIGINAL DOCUMENT MISSING PAGE(S): No ~-~achme~f Approved For Release 2000/08/29 : CIA-RDP78-05538A000200050001-4