REVISED PRODUCTION FORECAST ON SECTION 80 FOR FY 1956-57
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-05597A000200040053-3
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
1
Document Creation Date:
December 22, 2016
Document Release Date:
July 8, 2009
Sequence Number:
53
Case Number:
Publication Date:
October 17, 1955
Content Type:
MFR
File:
Attachment | Size |
---|---|
![]() | 48.55 KB |
Body:
Approved For Release 2009/07/08: CIA-RDP78-05597A000200040053-3
CONFIDENTIAL
17 October 1955
MEMORANDUM FOR RECORD
SUBJECT: Revised Production Forecast on Section 80 for FY 1956-57
1 ? stated that the proposed revised schedule
for Section 30 for FY 1956-57 had been coordinated with Army and Air
Force.
2. 1 hadl (check the proposed schedule against the
Chapter I schedule to see if there are any inconsistencies. He has
indicated a number of sections which are scheduled or forecast for
completion after scheduled completion of corresponding sections 18.
However, he did not regard any of these as serious except with respect
to Area 39 (China). He feels very strongly that this should be looked
into to determine whether or not they will be able to come up with the
Section 18 on China in Septer nber 1956 as it is now scheduled. The
Section 80 on 39A was published on 11 March 1954, but there has been
no Section 80 produced for 39B, and none is scheduled or forecast.
The Section 80 on 39A is fairly recent (1954). It is possible that they
can prepare the Section 18 without the necessity of coming out with
a maintenance on M.
3. To sum it up, the schedule proposed by Navy for the
Sections 80 is okey with the exception of this one item, and on that
it is merely a matter of determining whether or not they will be in
a position to come up with a Section 18 without revision of 80 on 39A.
t3 r._,
25 YEAR
RE-REVIEW
Approved For Release 2009/07/08: CIA-RDP78-05597A000200040053-3