DISCUSSION WITH (SANITIZED) CHAPTER VI COORDINATOR
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-05597A000200040093-9
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
1
Document Creation Date:
December 22, 2016
Document Release Date:
July 8, 2009
Sequence Number:
93
Case Number:
Publication Date:
June 30, 1955
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 45.04 KB |
Body:
Approved For Release 2009/07/08: CIA-RDP78-05597A000200040093-9
25 YEAR
RE-REVIEW
For the Record
K. A. Knowles
Discussion with
30 June 1955
Chapter VI Coordinator
1. In conversation with I I Chapter VI SovBloc
Coordinator he indicated desires of the Economic Area, and
specifically to obtain the production allocations for
Section 62-D, Electric Power, and Section bj-.F, Construction
Materials, which are presently done by the Army engineers.
production of Chapter VI elements, and further, that the manner
in which these sections were prepared by Army was not in con-
sonance with the way the rest of the :sections had been prepared.
on : ese two sections had caused considerable delay in ORR
said that difficulties of getting production coordination
2. I indicated tol I that I would informally look
into the matter, although I didn't have any hopes of getting re-
allocation of these two sections to ORR.
3. As a substitute I suggested tol the possibility
of working out with the engineers an ad hoc arrangement on these
subsections on which they found difficulty or were anticipating the
long delays in production, permitting ORR to do the job and having
the subsections thus produced reviewed by the engineers.
K. A. KNOWLES