DISCUSSION WITH (SANITIZED) CHAPTER VI COORDINATOR

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-05597A000200040093-9
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
1
Document Creation Date: 
December 22, 2016
Document Release Date: 
July 8, 2009
Sequence Number: 
93
Case Number: 
Publication Date: 
June 30, 1955
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP78-05597A000200040093-9.pdf45.04 KB
Body: 
Approved For Release 2009/07/08: CIA-RDP78-05597A000200040093-9 25 YEAR RE-REVIEW For the Record K. A. Knowles Discussion with 30 June 1955 Chapter VI Coordinator 1. In conversation with I I Chapter VI SovBloc Coordinator he indicated desires of the Economic Area, and specifically to obtain the production allocations for Section 62-D, Electric Power, and Section bj-.F, Construction Materials, which are presently done by the Army engineers. production of Chapter VI elements, and further, that the manner in which these sections were prepared by Army was not in con- sonance with the way the rest of the :sections had been prepared. on : ese two sections had caused considerable delay in ORR said that difficulties of getting production coordination 2. I indicated tol I that I would informally look into the matter, although I didn't have any hopes of getting re- allocation of these two sections to ORR. 3. As a substitute I suggested tol the possibility of working out with the engineers an ad hoc arrangement on these subsections on which they found difficulty or were anticipating the long delays in production, permitting ORR to do the job and having the subsections thus produced reviewed by the engineers. K. A. KNOWLES STAT Approved For Release 2009/07/08: CIA-RDP78-05597A000200040093-9