RELOCATION OF 250 KW DIESEL GENERATOR TO (Classified)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-05601A000300090001-8
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
1
Document Creation Date:
November 11, 2016
Document Release Date:
June 16, 1999
Sequence Number:
1
Case Number:
Publication Date:
October 8, 1963
Content Type:
MEMO
File:
Attachment | Size |
---|---|
CIA-RDP78-05601A000300090001-8.pdf | 65.65 KB |
Body:
Approved For Release 199.9/09/20 : CIAq , 1A0003000900Q
25X1A9a ATTN
C/FEB/OC-E
Chief, Real Estate & Construction Division, OL
26X1A6a
Relocation of 250 KW Diesel Generator to
# iU'L1V I V/iL
8 October 1963
In response to your telephone request, the following
25X1 A6a
comments are presented in regard to the relocation of the 250
KW Fairbanks-Morse (slow speed) Diesel Generator presently
installed at Site
a. Because of the weight and bulk of this installation,
the cost of removing, crating and transporting would be
prohibitive. The engine base alone weighs 57 , 000 1bs .
b. The cost of re-installation, housing, etc., would
more than offset the cost of several high speed generators
of equal capacity.
25X1A6a
c. The design work for th*"20 usion of electrical
generating facilities at s bed projected on
retaining this unit . The sign egmplete. A new
switchboard will be built around the eacsting generator
owitchgear (Fairbanks-Morse) as the basic unit.
d. Present policy is based on the installation of
ter units, because of smaller size and easier installa-
tion.
25X1A9a
25X1A6a
25X1A6a
25X1A9a
Approved orREI'AV 14484/20: CIA- ii Q40,30009(ifli
ay'Of ~/ my (189._,
,10
12
~f_
Or
OL/RECD/ CTEB/ -MOW f :;, aJ a
CYO?6`1
COINTIDENTIA1
T
I
q
a:
-
ly
~
.too
arS __. REV jM. S`
T REV AUT 4. !4H
Distribution:
Original - Addressee
UP- = ZO-63 Contract File tCkDD /RECD
1 - File/RECD
2 - OL RECD/ UEB
Chief, OC-E