(Sanitized) POWER AND AIR CONDITIONING PROGRESS REPORT NO. 8
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78-06505A000500040020-6
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
November 17, 2016
Document Release Date:
May 31, 2000
Sequence Number:
20
Case Number:
Publication Date:
April 7, 1969
Content Type:
CABLE
File:
Attachment | Size |
---|---|
CIA-RDP78-06505A000500040020-6.pdf | 86.46 KB |
Body:
CABLE s"ECPP A %d,f, ,ggIease =M 4A6ECIA-RWZ"6 705AVGQW0Q4 OJ'Ati 4s-SEEN BY
25X1A
25X1A
25X1A
1. PROJECT APPROXIMATELY 63.3 PER CENT COMPLETE.
2. NEW A/C CHILLER ASSEMBLIES BEING DISMANTLED IN
PREPARATION FOR REPLACEMENT OF CHILLER UNITS REJECTED
(SEE REF A) .
3. POWER HOUSE EXPANSION PROCEEDING SLOWLY BUT SURELY
IN ITS FINAL PHASE. OLD UPS REMOVED AND TURNED OVER
ppb
25X1A POWER HOUSE AND AIR CONDITIONING PROGRESS REPORT NO, 8
25X1A
25X1~5X1A
25X1A
PERSON/UNIT NOTIFIED
ADVANGYt015Y [ ISSUED _ SLOTTED
t,
DISSe ? PER
ACTIO-?
TESTED . CABLING NOW ABOUT 9O PER CENT COMPLETED.
AT:
.4 L FAT
4. CONNECTION TO- HV LINES TRANSFERRED FROM OLD TO
OLD SUBSTATION NOW
NEW SUBSTATION ON 29 MARCH-
DISMANTLED. TEMPORARY LINEStPCI I)L I $ISTRIBUTION
SYSTEM TO NEW SUBSTATION.
5. NEW SWITCHGEAR INSTAL~ED AND BEING DEBUGGED AND
RID COPY
SECRET
GROUP I I
EXCLUDED FROM AUTOMATIC
DOWNORADLNG ANO I2
DECLi511FICLTION
INDEX: ^ YES ^ NO
CLASSIFY TO FILE NO._
X-REF TO FILE NO.
B . DIRECTOR 89497
Approved For Relel~a~~"2 O'/06/14 : CIAA-
SAC
S )A.
c1F. -
,.o
25X1A
NiY
R :Tli ?i
DP78 06505~,g~p50~J0400A ~E
Y~ c,r~'
:a LE A-nprame .SFr, . ,F~elease 20 14AGCIA-RDRZ&46505AOQ5?AA4Q?~ S ? SEEN SOEW
25X1A
LI
ISSUED ^ SLOTTED
OISS[*++ ~Y_ PER
ACTIQ
RID COPY
SECRET
GROUP I
C[CIUOED FROM AUTOMATIC
DOWNGRADING AIO
DECIItlrt ICATION
X-REF TO I'-FILE NO.
FILE RID ^ RET TO BRANCH ^ DESTROY ^ SIG.
PAGE 0299 S E C R E T
25X1A 6. AND UPS FACTORY REP ARRIVED ON 14 MARCH TO
!5X1 A
SUPERVISE FINAL PHASE OF UPS INSTALLATION AND CONDUCT
TESTING. NEW UPS INSTALLATION AND TESTING NOW
COMPLETED . FACTORY REP DEPARTED 5 APRIL.
L
TO DEPART 10 APRIL AFTER SWITCHGEAR TESTING COMPETED.
0/A 13 APRIL
25X1A (SEE REF B). :ONDUCTED ON-SITE INSPECTION OF `--
PROJECT 27 MARCH THRU 2 APRIL .
7. EXPECT TO BEGIN CUTOVER OF LOAD TO NEW DISTRIBUTION
ON S APRIL .