(UNTITLED)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78-06505A000500040099-0
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
7
Document Creation Date: 
November 17, 2016
Document Release Date: 
June 7, 2000
Sequence Number: 
99
Case Number: 
Publication Date: 
February 15, 1967
Content Type: 
CABLE
File: 
AttachmentSize
PDF icon CIA-RDP78-06505A000500040099-0.pdf276.19 KB
Body: 
Approved For Release 2000/06/14: CIA-RDP78-Q6505A000500040099-0 INDEX: ^ YES ^ NO CLASSIFY TO FILE NO. X-REF TO FILE NO. FILE RID [3 RET. TO BRANCH ^ DESTROY ^ SIG. W A I M f. 15 g, FOR COMPATABILITY NEW SWITCHGEAR (SYSTEM 2), NEW 235 KW GENERATOR, CLASSIFIED MESSAGE 7- TOTAL COPIES SECRET gIOUr 1 .XO.DD.DCNAO AUICMATIC DOWM4RAgN1: AND DeaAasv~cAnoN (!3) DIRECTOR 73385 ,r i 1. PARA 4 REF A RELATES TO NEW CONDUIT AND CABLE RUNS BETWEEN POWER HOUSE AND RECEIVER BUILDING. ADDITIONS AND IMPROVEMENTS AND NEW UPS. 2. OTHER FACTORS WHICH MUST BE CONSIDERED BEFORE POWER HOUSE EXPANSION ARE: PROVISIONS FOR NEW AIR CONDITIONING LOAD, ABLE MORE DOWN TIME DEFINITE USING EXPANSION APPROACH VICE $ n,rT~~4f' SWITCHGEAR LOCATION AND NECESSITY REMAIN OPERATIONAL. CONSIDER}-C/j NEW 1 FLOOR. EXISTING CONDUITS CANNOT BE REUSED DUE DIFFERENT i / rl,j NEW WAREHOUSE LOAD, NEW TRANSFORMERS, AND DUMMY LOAD. 3. INSTALLATION NEW EQUIPMENT AND CONDUIT WORK WILL BE TREMENDOUS PROBLEM DUE EXISTING, MULTIPLE CONDUITS IN CONCRETE DO il POWERHOUSE. S E C R E T 3T C / U ~, /STG="'t~ S - / . L~ iG AG s~ c SECRET- --Approved For Release 2000/06/14: CIA-RDP78-06505A000500040099-0 8 1933 Z F`G`l7~1 w)' ^ RID COPY INio: vR 25X1 A 25X1 A 25 1A CITE DIRECTOR ,73305 1. WHILE IDEA OF ONE BUILDING TO HOUSE ALL - MECHANICAL AND ELECTRICAL SYSTEMS MERITS AND HAS BEEN GIVEN SERIOUS CONSIDERA- TION UNFORTUNATELY OUR PRESENT BUDGET STATUS PROHIBITS THIS APPROACH. .2. FUNDS IN THE AMOUNT OF - ARE AVAILABLE FOR THE A/C 25X1A INSTALLATION AND WITH THE EXPANDED SYSTEM PLANNED THIS AMOUNT MAY BE MARGINAL. SINCE IT IS BOTH TECHNICALLY FEASIBLE AND AN ECONOMIC NECESSITY EXTERNAL PORTIONS OF THE NEW A/C SYSTEM WILL BE'LOCATED ON PADS OUTSIDE OF THE BUILDING AND NO BUILDING WILL BE REQUIRED. 3. UPS DIFFERENT SYSTEM. -UPS UNDER CONSTRUC- TION AND NO PROBLEMS ENCOUNTERED. ORIGINAL PLANNING FOR SWITCHBOARD AND UPS INSTALLATION TO EXPAND PRESENT POWER BUILDING. TWO DIESELS RELEASING OFFICER Approved For Release 2000/06/14: CIA-RDP78-06505A REPRODUCTION BY OTHER THAN THE ISSUING OFFICE ISM AUTHE ICATING 0 ~'\ ,_ ED. iY{L' J5N(i>/ t' UKN( Ct "^rQa .. Approved For Releease 2000/06/14o:-F?IAARIDP78-06505 FILE RID ROLITIN DISSEM BY, 5-E-C-R-E-T 7 -3A WILL-REMAIN AND OPPOSITE WALL REMOVED AND AREA ENLARGED TOWARD GUARDHOUSE AND FENCE. FUNDS AREAVAILABLE FOR THIS AUSTERE MODI- FICATION: HOWEVER, TO BUILD A COMPLETE NEW RELOCATED POWER HOUSE PLUS. CABLING WOULD FAR EXCEED THE 50.000 ALLOTED. WE ARE PRESENTLY ' 25X1A IN-THE PROCESS OF PROVIDING WITH THE SCOPE OF WORK. FUNDS. AND OTHER DETAILS. CONCURRENTLY DETAILS WILL BE POUCHED EXCEPT FOR REMOVAL OF PRESENT UPS NO LOSS OF STANDBY POWER WILL BE NECESSARY. TO REDUCE THIS UPS LOSS TO MINIMUM BUILDING MODIFICA- TIONS WOULD AWAIT DELIVERY NEW UPS TO SITE. 4. CAN YOU ADVISE DETAILS OF PARA 'F REF. SINCE MAY PARALLEL WORK OUTLINED PRECEEDING PARA. END OF MESSAGE 25X1A S-E-C-R-E-T FiT Eadud.d Iron eNanmi< awrr,r,Hn, .n1 d.i l Es - C X- REF TO FILE NO. SECRET [Iii ' ^ ^ FLE RiD T` ANCH DESTROY ^ S!GG . NOTIFIED AC 7I UN 1 r ,r: I fl RID COPY f-1 25X'IA FILE 6`3 C ;:> (A4OTA)-: (1A ISSUED SL TTED ? TUBEB~ ` RANSM ITTED, SC ISS O u i "'? FF, ENGINETE s.S r, I% i.. "X I ; ) '") it u PEP lil uY NNO CON'`IDS RA L c.. ir:. !1, 1. J i. -... ._ P?, ~ ._ .. ., _ r a.o nnt~ V 'rF/'~T 1ND ICATE DESTRAE11 I'" COMB NE ra Y ,) C}I, Y'; x... ~; r^?'~' 4 [1 c'au tiV~., SE A L, L. ~.r 1 `!u N C y irr Te t "i~ r '~4 qS i a i2?r. .- A; iiiT, r- } {~i ll f"I F'~M LS'' ponp, Fro-, t r:i ,tYIE'4 ri 1 I BUILD 1Nu .4, So I.1 I-SCUSSED AT 'VAR X11 i IN S i N .i.[, ,rvv iV., , ;,. )ESIRALE S E C 0 E T Approved For Release 2000/06/14: CIA-RDP78-06505A000500040099-0 Inl rT' 25X1A ILLE B 25X1A 25X1 C Approved For Release 2000/06/14: CIA-RDP78-06505A000500040099-0 Next 1 Page(s) In Document Exempt Approved For Release 2000/06/14: CIA-RDP78-06505A000500040099-0 Approved For Release 2000/06/14 .CIA-RDP78-066v0v-A000500040099-Q, C-...,.;IFY TO FILE NO. R-O TO i- 0 F; L R;D ROT. TO BRANCH Cj' DcST~iOY `; SiG. a SECRET S C T 223240 Z CITE '545 ZZCtotL 64 46-7 ?ate i I . : T T ION SUPPORT OFFICER REPORTS_ IN RECEIPT INSTRUC- T ~ONS FRTO SELECT LOCAL FIRM TO CONDUCT A AND E SL OY C^- AIRCONDITIONING. AT THIS STAGE NO ALLOTMENT OF FUNDS 3PEC IF 1-7 D. NOT ICE FROM ADVISES A/C ENGINEER `J.IILL TRAVEL TO SITE AS ASSIST. 2. _ ADV IS',S SI- T FR IM WILL UTILIZE CLEARED U. S. CITIZENS FOR A AND E WORK, NONE OF WHOM WILL HAVE MORE THAN SECRET CLEARNCE. O'~EVER 1..r _ ASKS DEGREE OF CWARANCE NEEDED FOR JOB. 3, '.1E PROPOSE TO PROCEED ..)ITH A AND E EFFORT ON BASIS CLEAR- C S J~ELO sY TN- i S. CITIZENS. ALTHOUGH IT WILL BE INCONVENIENT, -~L CC's UP CRYPT) EQUIPMENT AND OTHER CLASSIFIED INFORMATION =Z,'I -.ENGINEER S TOO WORK WITHOUT ACESS TO ANY CLASSIFIED 4. IOJ SE LEVEL OF FUNDS ALLOTTED. C R E T LfL ~~ "~""__ ppr'~ ~1 f et lA-RDP78-06505A000" GIONA tA6NftG ItOM AVIbAlAT10 otatsinuTla+ REPRODUCTION PROHIEI UNIY 1TI a ISSUED ^ SLOTTED CI TUBED 25X1A 25X1A 25X1A 25X1A 25X1A 25X1A 25X1A 25X1A 25X1A 25X1A