CABLE TO AIG 7840 FROM NPIC WASHDC
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04549A000800030009-8
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
1
Document Creation Date:
December 28, 2016
Document Release Date:
August 17, 2006
Sequence Number:
9
Case Number:
Publication Date:
April 11, 1968
Content Type:
CABLE
File:
Attachment | Size |
---|---|
CIA-RDP78B04549A000800030009-8.pdf | 79.9 KB |
Body:
OUT648I0
P 1 1004 8Z APR 63
FM NPIC WASHDC
TO AIG 7840,
ST
G
1959 w,.'l? 11 00 5I 1
1d T I A L
CITE NPIC .
CPIR:NPIC SER:FO0705 GN MSIJ:00T976 14MAR68H
DAY PHOTO. CAMERA ON 01542, OFF 0615Z
AMS SERIES L701, SHEET 6554 III, 1ST ED., SERIES L7i%l1 SHEETS
5945 I, 5946 I, II9 6046 III, 1ST ED.
PART I. SIG:NIFICA1?;T PHOTO INTERPRETATIONS
B. NEW TARGETS AND SIGNIFICANT CHANGES
25X1
25X1
ZZZOI:ROAD CONSTRUCTION NEW SGM:NONE CTY VS 142445N1O73245:E
THE SOUTHERN UNNUMBERED EXTENSION OF LAOS ROUTE 110 IN
SOUTH VIETNAM 32 NM SW OF DAK TO IS OBSERVED EXTENDING
SOUTH FROM ITS PREVIOUSLY REPORTED TERMINUS AT 142445N_;`;t_rp~ ,enjJ~
1073245E (UTM YA743947) TO YA748913 AND THEN GENERALLY EAS
TO 142242N 1073340E (YA761910). AN ADDITIONAL SEGMENT IS
--~
OBSERVED EXTENDING SOUTH FROM 142155N 10173218E (YA738895)
TO 1490JOIN 1073939F (YA749R70)
- -1
ZZZO2:UNREPORTED ROAD SGM:NONE CTY CB 113500N1
DES:A PREVIOUSLY UNREPORTED OPERATIONAL ROAD IS OBSERVED
EXTENDING FROM ROUTE 5 IN PHNOM PENH AT 113505N 1045520E
(UTM VT916804) TO A CROSSING AT THE TONLE SAP RIVER (BRIDG
COMPLETED), THEN GENERALLY NORTH PARALLELING THE MEKONG
RIVER TO PH PREK CHROU (VU98OOSG), THEN GENERALLY NNW
WHERE IT JOINS ROUTE 6 AT 11532ON 1045535E (VU920142).
BRIDGE CONSTRUCTION SITES ARE LOCATED AT VT910877, VT9118
VT9149O3, VT921915, VT928926, VT9O8889, VU9631O3, VU984O3
VU987037, AND VU991035. THESE BRIDGE SITES, WHICH ARE IN
VARYING STAGES OF COMPLETION, ALL HAVE ACTIVE BY-PASSES.
PART II. OTHER PHOTO INTERPRETATIONS - NONE