CABLE TO DIRNSA FROM NPIC
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04558A001300030016-8
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
March 13, 2008
Sequence Number:
16
Case Number:
Publication Date:
July 28, 1966
Content Type:
CABLE
File:
Attachment | Size |
---|---|
![]() | 76.4 KB |
Body:
OUT59262
P 282228Z
FM NPIC
TO DIRNSA
CNO
Approved For Release 2008/03/13: CIA-RDP78BO4558AO01300030016-8
0
1966 JUL 28 22 42 2
Y
OPCEN
STATE/RCI
CINCLANTFLT
CINCPACFLT
CINCUSNAVEUR
CINCLANT
CINCPAC
LANTINTCEN
FI CP AC
COMNAVFORJAPAN
COMSECONDFLT
YDHAVQC/CINCEUR
YSHKLRC/USARPAC
AFSSO PACAF
AFSSO ACIC
AFSSO FTD
AFSSO AFSC
AFSSO BSD
AFSSO ESD
AFSSO SSD
AFSSO USAF
AFSSO USAFE
INFO FICEUR
ZEM
T 0 P S E C R E T
THIS MESSAGE IS IN THREE (3) PARTS.
L - - Approved For Release 2008/03/13: CIA-
lice Action
-
1
CITE NPIC 7925. 25X1
Approved For Release 2008/03/13: CIA-RDP78BO4558AO01300030016-8
S ?
PART I
CONTINUING STUDY OF THE TATISHCHEVO ICBM COMPLEX ON MISSION
4030 REVEALS AN EXTENSIVE BUILT-UP AREA IN THE EASTERN SUBURB
OF TATISHCHEVO AT 51-40N/045-38E. THIS AREA IS NOW CONSIDERED TO
BE A PART OF THE ICBM COMPLEX SUPPORT FACILITY. IT CONTAINS A LARGE
ADMINISTRATION AND HOUSING SECTION WITH SOME OF THE BUILDINGS STILL
UNDER CONSTRUCTION. A LARGE COMMUNICATIONS FACILITY IS LOCATED ON
THE NORTH SIDE AND IT COMPRISES AN ADMINISTRATION BUILDING, ANTENNA
ARRAYS AND A HARDENED COMMUNICATIONS CENTER WHICH IS STILL UNDER
CONSTRUCTION. LARGE WAREHOUSES ARE BEING CONSTRUCTED IN THE SE
SECTION. TWO HEATING/POWER PLANTS SERVE THE ENTIRE AREA. THE
ADMINISTRATION AND HOUSING AREA IS ROAD SERVED FROM THE RAILHEAD
AND STORAGE AREA LOCATED SE OF THE TRANSFER POINT. PRIOR TO THE
CONSTRUCTION OF THESE FACILITIES AT THE ADMINISTRATION AND HOUSING
AREA, WHICH BEGAN IN THE SUMMER OF 1964, THE AREA WAS CONSIDERED
A MILITARY BARRACKS AND TRAINING AREA.
PART II
LAUNCH SITE 66 OF THE OLOVYANNAYA COMPLEX IS IN THE MID-STAGE
OF CONSTRUCTION RATHER THAN EARLY AS REPORTED IN OAK FOR MISSION
4030,
PART III
LAUNCH SITE 20 AND 21 AT THE KARTALY ICBM COMPLEX HAVE BEEN
REEVALUATED AND ARE IN A MID-STAGE OF CONSTRUCTION RATHER THAN LATE
AS REPORTED IN OAK FOR
GP-1
T 0 P S E C R E T
I
Approved For Release 2008/03/13: CIA-RDP78BO4558AO01300030016-8