CABLE TO AIG NINE SEVEN SIX FROM NPIC WASH DC
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04558A001300030028-5
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
March 13, 2008
Sequence Number:
28
Case Number:
Publication Date:
July 28, 1966
Content Type:
CABLE
File:
Attachment | Size |
---|---|
![]() | 81.44 KB |
Body:
Approved For Release 2008/03/13: CIA-RDP78BO4558AO01300030028-5
OlJ1'M40
INITIAL SCAN BY NPIC OF MISSION
CO N F'L D E NT I AL CITE NPIC 7903.
P 280140Z ='"
FM NPIC WASH DC
TO AIG NINE SEVEN SIX
RUEKDA/DIA PRODCEN
RUEKDA/NIC
BT
25X1
?
25X1
1966 JUL 28 02 o I Z
REVEALS THE FOLLOWING INFORMATION ON THE THANH HOA/
1. A RAIL BY-PASS UNDER CONSTRUCTION IS OBSERVED AROUND THE 28 JUL1966
VINH RAIL LINE=
PHU QUAT RAIL BRIDGE AT 1926N 10545E. BY-PASS
UTM WG795410 WHERE IT REJOINS THE MAIN LINE. THE PHU QUAT BRIDGE--'
r r -
IS SERVICEABLE. l
ref
rd 25X1
Acti
WG797497 TO ANOTHER BRIDGE UNDER CONSTRUCTION AT UTM WG795493 TOE
EXTENDS FROM UTM WG 798497 TO A BRIDGE UNDER CONSTRUCTION AT UTM
I
I PD
_ .L r_ o _25X1
j r 1A D
1923N 10544E (UTM WG784435). BOMB CRATERS HAVE DAMAGED THE RAIL
_RAG
BED AND CUT THE RAIL LINE, HOWEVER A WOODEN TRESTLE IS OBSERVED I Wsaxx-a
SPA
T PZ ICe
2. AIR STRIKES HAVE RENDERED THE RAIL LINE UNSERVICEABLE AT
UNDER CONSTRUCTION. I p,_P
- 25X1_,.
3. A RAIL BY-PASS UNDER CONSTRUCTION IS OBSERVED AROUND THE 'advance copy
Sanitized
THE DAI THUY RAIL BRIDGE ? AT 1922N 10543E. BY-PASS Sz" & A 125X1
RAIL LINE EXTENDS FROM UTM WG759418 [U A S ViULAOLL ansuuc. Ma
UTM WG756419 TO UTM WG753414 WHERE IT REJOINS THE MAIN LINE. THE
n ] F 7W, I 'Al
Approved For Release 2008/03/13: CIA-RDP78BO4558AO01300030028-5
t Approved For Release 2008/03/13: CIA-RDP78B04558A001300030028-5
0
DAI TNfY RAIL BRIDGE IS SERVICEABLE.
10
4. A RAIL BY-PASS UNDER CONSTRUCTION OBSERVED AROUND THE
PHUONG DINH RAIL BRIDGE AT 1951N 10548E. BY-PASS
EXTENDS FROM UTM WG842951 TO A BRIDGE UNDER CONSTRUCTION AT UTM
WG842949 TO UTM WG843947 WHERE IT REJOINS THE MAIN LINE. THE
PHUONG DINH BRIDGE IS SERVICEABLE.
MAP REF: AMS SERIES L701, SHEETS 616911 & III, 6170 I
USATC SERIES 200, SHEET 0617-4 HL
GP-1
C O N F I D E N T I A L
-END OF MESSAGE-
1
Approved For Release 2008/03/13: CIA-RDP78B04558A001300030028-5