CABLE TO AIG NINE SEVEN SIX FROM NPIC WASH DC

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04558A001300030089-8
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
3
Document Creation Date: 
December 28, 2016
Document Release Date: 
March 13, 2008
Sequence Number: 
89
Case Number: 
Publication Date: 
July 15, 1966
Content Type: 
CABLE
File: 
AttachmentSize
PDF icon CIA-RDP78B04558A001300030089-8.pdf97.84 KB
Body: 
CENTER ROUTII SLIP Z - 9 IP FM 30 (5-66) DESTROY PREVIOUS EDITIONS P,~-~ CAS Approved For Release 2008/03/13: CIA-RDP78BO4558AO01300030089-8 to) S /6 Approved For Release 2008/03/13: CIA-RDP78BO4558AO01300030089-8 ? 0 T59104 P 150332Z FM NPIC WASH DC TO AIG NINE SEVEN SIX RUEKDA /D IA PRODCEN RUEKDA /NIC BT C O N F I D E N T I A L CITE NPIC 7767. CONTINUING SCAN BY NPIC OF MISSION BLUE SPRINGS 5157 OF 6 JULY 1966 REVEALS THE FOLLOWING INFORMATION ON RAILROADS IN NORTH VIETNAM. < )FYI 1. IMP- Vit/1 It{1 VA1Li UAL) ANU 41UHWAY t5K11)UI. WAS DESTROYED BY AIR STRIKES ON 29 JUNE 1966 AND IS STILL 1". K JUL 1966 UNSERVICEABLE. THERE IS NO EVIDENCE OF ANY ATTEMPT TO REPAIR OR BY-PASS THE DESTROYED BRIDGE. HIGH WATER, EVIDENT ON PHOTOGRAPHY, ON THE RIVERE CLAIRE WILL IMPEDE REPAIR OF THE BRIDGE. A LONG PONTOON BRIDGE SECTION IS LOCATED 1 NM EAST OF THE BRIDGE IN A FLOODED AREA AT 2117N 1052SE (UTM WJ488548). 2. A RAIL BY-PASS IN EARLY STAGES OF CONSTRUCTION, AROUND THE HAI PRONG RAILROAD AND HIGHWAY BRIDG WHICH HAS NEVER BEEN SUBJECTED TO AIR STRIKE, IS OBSERVED EXTENDING FROM 2051N 10640E (UTM XJ741062) WESTWARD TO A BRIDGE UNDER CONSTRUCTION OVER THE SONG TRAM BAC (STREAM) AT 2051N 10640E (UTM XJ736064). CONSTRUCTION OF THE BY-PASS ON THE NORTH SIDE OF THE STREAM IS EVIDENT, HOWEVER IT HAS NOT Approved For Release 2008/03/13: CIA-RDP78BO4558AO01300030089-8 I P..,. I C_-D~ / T-1p_7--f- 25X1. PSD PSD-ICB TID I IAD 25X1 Advance copy, Sanitized 41?'_ :,, ?~ttll 1T W tst@* e Approved For Release 2008/03/13: CIA-RDP78BO4558AO01300030089-8 is --2--- YET REACHED THE RIVER. THE CONSTRUCTION WAS EVIDENT ON (BB) 3. A RAIL BY-PASS AROUND THE BINH PHIEN RAILROAD BRIDGE WHICH HAS NEVER SEEN SUBJECTED TO AIR STRIKE IS EVIDENT EX- TENDING FROM 2057N 10609E (UTM XJ210185) SOUTHWESTWARD TO A BRIDGE UNDER CONSTRUCTION CROSSING AN UNNAMED STREAM AT 2057N 10610E (UTM XJ219182) TO 2057N 10610E (UTM XJ227183) WHERE IT REJOINS THE HA NOI - HAI PRONG RAIL LINE. MAP REF: AMS SERIES L701 SHEETS 60741. 6273IV, 6373IV USATC SERIES 200 SHEETS 0616-19&20HL GP-1 C O N F I D E N T I A L -END OF MESSAGE- CITE NPIC 7767. Approved For Release 2008/03/13: CIA-RDP78BO4558AO01300030089-8