CABLE TO AIG NINE SEVEN SIX FROM NPIC WASH DC

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04558A001400030066-2
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
February 19, 2008
Sequence Number: 
66
Case Number: 
Publication Date: 
September 1, 1966
Content Type: 
CABLE
File: 
AttachmentSize
PDF icon CIA-RDP78B04558A001400030066-2.pdf100.79 KB
Body: 
Approved For Release 2008/02/19: CIA-RDP78BO4558AO01400030066-2 P 012244Z SEP 66 FM. NPIC WASH DC TO AIG NINE SEVEN SIX RUEKDA/D IA PRODCEN RUEKDA /N IC BT CONFIDENTIAL CITE NPIC 8338.: REF A: NPIC 8093, DIG 130234Z, AUG .66 B: NPIC 7968, DIG 030.120Z, AUG 66 C: NPIC 7659, DTG 030204Z, JULY 66 Ds E: NPIC 7691,. DTG .070813Z, JULY 66 CONTINUING SCAN BY NPIC OF ~EVEALS THE FOLLOWING INFORMATION ON THE HANOI/PING-PIN-HSIANG RAIL LINE IN NORTH VIETNAM: 1. THE SPANS OF THE CAO NUNG RAILROAD BY-PASS BRIDGE AT 2133N 10630E (UTM XJ550845) HAVE BEEN REPLACED PROVIDING A SERVICEABLE BY-PASS OF THE HEAVILY DAMAGED CAD NUNS RAILROAD BRIDGE OVER THE SONG HOA REPORTED IN REF A. THE SPANS OF THE BY-PASS BRIDGE HAD BEEN REMOVED UPON THE COMPLETION OF THE RECONSTRUCTION OF THE MAIN BRIDGE IN EARLY AUGUST. (REF B). 25X1 I 2 SEP 1t,1ti 3 s~RiaJTiO j \' i:o 1 Office_e action File _25X1-1 #_C BR~ P n Ds 25X1 25X1-i nop N;n-ICB Pr~G:4 ~ SPAIA-AP __.-25X1 d 'advance COW, ~,,. a?tiUz~cf 25X1 THE THREE CENTER SPANS OF THE BAC SIANG RAILROAD BY-PASS r^~ t`-,t4~,ti~ lJ7 1*d4 rem 3y -;4;fT ftzffadizmg Pal i.l fl al Approved For Release 2008/02/19: CIA-RDP78BO4558AO01400030066-2 OU15%75 '1966 SEP 1 23 20 Z Approved For Release 2008/02/19: CIA-RDP78BO4558AO01400030066-2 BRIDGE (REF C) AT 2115N 106.17E (UTM XJ248518) HAVE BEEN REMOVED. THE BRIDGE APPEARED COMPLETED (REF D) t WITH ALL EIGHT SPANS IN PLACE. TWO PROBABLE HALF-THRU TRUSS BRIDGE SECTIONS ARE PRESENTLY OBSERVED AT 2116N 10611E (UTM XJ228526) .700 YARDS WEST OF THE SERVICEABLE BAC GIANG RAILROAD BRIDGE OVER THE SONG THUONG TWO.HALF-THRU TRUSS BRIDGE SECTIONS HAD PREVIOUSLY BEEN OBSERVED (REF E) IN THE BAC.GIANG RAIL YARD AT .2116N .10611E (UTM XJ242532). 25X1 3. CONSTRUCTION CONTINUES ON THE PREVIOUSLY REPORTED (REF E) RAILROAD BY-PASS.BRIDGE UNDER CONSTRUCTION AT 2112N 10605E (U?M Xd 132456) AROUND THE UNSERVICEABLE DAP CAU RAIL BRIDGE SEVEN OF THE S-SPANS ARE IN PLACE AND RAILS 25X1 EXTEND-TO BOTH APPROACHES OF THE BRIDGE. `~. I 25X1 MAP REF: UTM COORDS FROM AMS SERIES L7012# SHEET 62751 & 62741V.. GEOGRAPHIC COORDS FROM USAIC SERIES 200 SHEET 0616.20HL. GP-1 CONFIDENTIAL --END OF MESSAGE-- S/C NOTE: ALSO PASSED PRIORITY SAIGON INFO DIRECTOR, VIENTIANE,UDORN,.CLARK FIELD CITE. NPIC 8338. 25X1 Approved For Release 2008/02/19: CIA-RDP78BO4558AO01400030066-2