CABLE TO AIG NINE SEVEN SIX FROM NPIC WASH DC
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04558A001500010036-6
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
March 12, 2008
Sequence Number:
36
Case Number:
Publication Date:
November 21, 1966
Content Type:
CABLE
File:
Attachment | Size |
---|---|
![]() | 83.63 KB |
Body:
Approved For Release 2008/03/12 : CIA-RDP78BO4558AO01500010036-6
P 212324Z NOV 66
FM NPIC WASH DC
TO AIG NINE SEVEN SIX
RUEKDA/DIA PRODCEN
RUEKDA/NIC
BT
C O N F I D E N T I A L
CITE NPIC 9112.
OUT60440
9966 NOV 21 23 41 Z
CONTINUING SCAN BY NPIC OF MISSION BLUE SPRINGS Q168 OF
4 NOVEMBER 1966 REVEALS A RAIL BY-PASS UNDER CONSTRUCTION AROUN
THE HA NOI RAILROAD HIGHWAY BRIDGE OVER THE RED RIVER
21 02N-105 51E. SOUTHERN PORTION CONSISTS OF A ROAD-
BED UNDER CONSTRUCTION EXTENDING FROM THE HA NOI/THANH HOA
RAIL LINE AT 20 58N-105 50E (UTM WJ8781S8) GENERALLY EAST TO
UTM WJ930198; THEN NORTH, ADJACENT TO, AND PARALLELING AN
UNNUMBERED ROAD, TO A PROBABLE FERRY APPROACH UNDER CON-
STRUCTION ON THE SOUTH BANK OF THE RED RIVER AT 20 59N-105 53
(UTM WJ932217). TWO ADDITIONAL PROBABLE FERRY APPROACHES,
j --,25X1..,=
! Ste 61r-------
I
1
rP? c:
pi)
! ran"" ~----
WAXX-4 ~- -_
ItA?AP j
UTM WJ934208, EAST TO UTMS WJ935212 AAND WJ935211.
THE NORTHERN PORTION OF THE BY-PASS CONSISTS OF A ROADBED
EXTENDING SSE FROM THE HA NOI/HAI PHONG RAIL LINE AT 21 02N-
105 55E (UTM WJ959252) TO UTM WJ951222, THEN WEST TO UTM
WJ935221 ON THE NORTHERN BANK OF THE RED RIVER. A PROBABLE
FERRY APPROACH EXTENDS FROM THE ROADBED AT UTM WJ947219 TO
UTM WJ944216. A SECOND PROBABLE FERRY APPROACH EXTENDS FROM
THE ROADBED AT UTM WJ944219 TO UTM WJ943217. A THIRD PROBABLE
25X1 _-.
Approved For Release 2008/03/12 : CIA-RDP78BO4558AO01500010036-6
IN INITIAL STAGES OF CONSTRUCTION, EXTEND FROM THE ROADBED AT A~ 1-e cpr
Approved For Release 2008/03/12 : CIA-RDP78BO4558AO01500010036-6
?
?
FERRY APPROACH EXTENDS FROM THE ROADBED AT UTM WJ938219 TO
UTM WJ937219. THE FERRY APPROACHES APPEAR IN INITIAL STAGES
-OF CONSTRUCTION. NO TRACKAGE IS OBSERVED AND BOTH ROADBEDS
APPEAR IN EARLY TO MID STAGES OF CONSTRUCTION.
GP-1
C O N F I D E N T I A L
MAP REF: GEOGRAPHIC COORDS FROM USATC SERIES 200 SHEET 0616-20HL
UTM COORDS FROM AMS SERIES L7014 SHEETS 6150 I AND 6151 11,
S/C NOTE: ALSO PASSED PRITY SAIG INFO DIR VETN UDOR CLAR
CITE NPIC 9112.
Approved For Release 2008/03/12 : CIA-RDP78BO4558AO01500010036-6