CABLE TO AIG NINE SEVEN SIX FROM NPIC WASH DC

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04558A001500010036-6
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
March 12, 2008
Sequence Number: 
36
Case Number: 
Publication Date: 
November 21, 1966
Content Type: 
CABLE
File: 
AttachmentSize
PDF icon CIA-RDP78B04558A001500010036-6.pdf83.63 KB
Body: 
Approved For Release 2008/03/12 : CIA-RDP78BO4558AO01500010036-6 P 212324Z NOV 66 FM NPIC WASH DC TO AIG NINE SEVEN SIX RUEKDA/DIA PRODCEN RUEKDA/NIC BT C O N F I D E N T I A L CITE NPIC 9112. OUT60440 9966 NOV 21 23 41 Z CONTINUING SCAN BY NPIC OF MISSION BLUE SPRINGS Q168 OF 4 NOVEMBER 1966 REVEALS A RAIL BY-PASS UNDER CONSTRUCTION AROUN THE HA NOI RAILROAD HIGHWAY BRIDGE OVER THE RED RIVER 21 02N-105 51E. SOUTHERN PORTION CONSISTS OF A ROAD- BED UNDER CONSTRUCTION EXTENDING FROM THE HA NOI/THANH HOA RAIL LINE AT 20 58N-105 50E (UTM WJ8781S8) GENERALLY EAST TO UTM WJ930198; THEN NORTH, ADJACENT TO, AND PARALLELING AN UNNUMBERED ROAD, TO A PROBABLE FERRY APPROACH UNDER CON- STRUCTION ON THE SOUTH BANK OF THE RED RIVER AT 20 59N-105 53 (UTM WJ932217). TWO ADDITIONAL PROBABLE FERRY APPROACHES, j --,25X1..,= ! Ste 61r------- I 1 rP? c: pi) ! ran"" ~---- WAXX-4 ~- -_ ItA?AP j UTM WJ934208, EAST TO UTMS WJ935212 AAND WJ935211. THE NORTHERN PORTION OF THE BY-PASS CONSISTS OF A ROADBED EXTENDING SSE FROM THE HA NOI/HAI PHONG RAIL LINE AT 21 02N- 105 55E (UTM WJ959252) TO UTM WJ951222, THEN WEST TO UTM WJ935221 ON THE NORTHERN BANK OF THE RED RIVER. A PROBABLE FERRY APPROACH EXTENDS FROM THE ROADBED AT UTM WJ947219 TO UTM WJ944216. A SECOND PROBABLE FERRY APPROACH EXTENDS FROM THE ROADBED AT UTM WJ944219 TO UTM WJ943217. A THIRD PROBABLE 25X1 _-. Approved For Release 2008/03/12 : CIA-RDP78BO4558AO01500010036-6 IN INITIAL STAGES OF CONSTRUCTION, EXTEND FROM THE ROADBED AT A~ 1-e cpr Approved For Release 2008/03/12 : CIA-RDP78BO4558AO01500010036-6 ? ? FERRY APPROACH EXTENDS FROM THE ROADBED AT UTM WJ938219 TO UTM WJ937219. THE FERRY APPROACHES APPEAR IN INITIAL STAGES -OF CONSTRUCTION. NO TRACKAGE IS OBSERVED AND BOTH ROADBEDS APPEAR IN EARLY TO MID STAGES OF CONSTRUCTION. GP-1 C O N F I D E N T I A L MAP REF: GEOGRAPHIC COORDS FROM USATC SERIES 200 SHEET 0616-20HL UTM COORDS FROM AMS SERIES L7014 SHEETS 6150 I AND 6151 11, S/C NOTE: ALSO PASSED PRITY SAIG INFO DIR VETN UDOR CLAR CITE NPIC 9112. Approved For Release 2008/03/12 : CIA-RDP78BO4558AO01500010036-6