YEN-KUO HSIA HYDROELECTRIC POWER PLANT, CHINA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04560A001500010016-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
4
Document Creation Date: 
December 28, 2016
Document Release Date: 
December 8, 1999
Sequence Number: 
16
Case Number: 
Publication Date: 
June 1, 1963
Content Type: 
BRIEF
File: 
AttachmentSize
PDF icon CIA-RDP78B04560A001500010016-5.pdf213.68 KB
Body: 
Approved For Release 200N~/~~~ITE~IA-RDP78B04560A001500010016-5 N P I C/R-1335/63 June 1963 PHOTOGRAPHIC INTERPRETATION BRIEF YEN-KUO HSIA HYDROELECTRIC POWER PLANT, CHINA NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER Approved For Release 2001/08L,2~~~IA-RDP78B04560A001500010016- NO FOREIGN DISSEMDt15SEM GFOUP 1 Excluded Irom aulomotic downgrading and decleaallico~ion Approved For Release 2001/08/21 :CIA-RDP78B04560A001500010016-5 1Nf11tNINCi 'I'f:is document contains information affecting thy; national defense: of the i=nited States. wEthin the meaning of `Title 18, sections 7Si.'i and 794, of the U.S. Code, as amended. It, transmission or revelation of its contents to or receipt by an unauthorized person is prr,hihitted by law. Approved For Release 2001/08/21 :CIA-RDP78B04560A001500010016-5 Approved For Release 200Ad~~IE?~IA-RDP78B04560A001500010016-5 25X1A NATIONAL PHOTOGRAPH9C INTERPRETATION CENTER Title: Yen-'kuo Ilsia Hydroelectric .Power Plant, China 25X2 25X2 25X1 D 25X1 D Geo Coords: 36-O1N 103-15E NPIC Target No: 0383-30 COMDR Publication No: NPIC/R -1335/63 Date: The Yen-kuo I-lsia power plant and dam,15 change is evident in the construction status nm upstream from Lan-chow of the generator hall, and there are no indi- _ have undergone change since cations that any water is passing through the 'lhe extensive and power plant portion of the dam. It is probable elaborate high-level scaffolding, cofferdam, that no power is being generated. :Low-level access road with bridge, and cause- 1tEl~'EIt~NCEs way possibly for repairs to the tailrace aroa. of the spillway have largely disappeared. A reater than b d e g to 25X1 D volume of water estimate Documents: NPIC. 1t-1232/63, Apr 63 (S/No Foreign that of ~ is being discharged. Uisacm) New scaffolding has been erected along NPIC Project: J-141; ss the downstream face of the generator hall to provide access to the top of the dam. No Approved For Release 2001/0 SE~RE~IA-RDP78B04560A001500010016-5 NO FOREIGN DISSEM SECRET Approved For Release 20011408411E+~~ ~!~!-RDP78B04560A001500010016-5 Approved For Release 2001/0>~~E1EIA-RDP78B04560A001500010016-5 NO FOREIGN D15SEM