OAK-PART 1 MISSION 1009-1 6-9 AUGUST 1964
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04560A002500010014-6
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
35
Document Creation Date:
December 28, 2016
Document Release Date:
August 9, 2002
Sequence Number:
14
Case Number:
Publication Date:
August 1, 1964
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP78B04560A002500010014-6.pdf | 1.78 MB |
Body:
Approved For Release 2002/ V : ~18B04560A002500010014-6 OF
NP IC/R-785/64 TCS-7800/64
August 1964 Copy
OAK-PART I
MISSION 1009-1
6-9 AUGUST 1964
NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER
Approved Form%g 6
32 Pages
8B 0456OA002500010014-6
25X1
E GROUP 1 1
: lud ed 1- o~loma~~~
~~ pp CCFFA~p~rr
Approved jor ReleaseT2@U2/0>3123`:'C~Fi4- 010014-6 25X1
25X1
MISSION 1009-1, 6-9 AUGUST 1964
TABLE OF CONTENTS
PREFACE
TRACK OF MISSION
HIGHLIGHTS
MISSILES
AIR FACILITIES
NUCLEAR ENERGY
NAVAL ACTIVITY/PORTS
BIOLOGICAL/CHEMICAL WARFARE
ELECTRONICS/COMMUNICATIONS
OTHER ACTIVITY
ATTACHMENTS
25X1
Approved For Release 2002/08/23 : CIA-F9
TOP SECRET
Approved F
br ReleaJJQRO2//819`.`CIA4
25X1
25X1
OAK-PART I
MISSION 1009-1
PREFACE
THIS IS THE FIRST OF AN ESTIMATED TWO DAILY OAK REPORTS BASED
ON MISSION 1009-1 AND DEALING WITH THE HIGHEST-PRIORITY INTELLIGENCE
ITEMS APPEARING IN THE COMOR TARGET LIST. THIS REPORT, COVERING
THE OAK REPORTING PERIOD 0800 TO 1500, 13 AUGUST 1964, PRESENTS
INFORMATION ONLY ON THOSE COMOR TARGETS OBSERVED ON THE PHOTOGRAPHY.
TARGETS ARE ARRANGED IN THE OAK BY SUBJECT AND WITHIN EACH SUBJECT
BY.COMOR TARGET NUMBER. TARGETS OF OPPORTUNITY OBSERVED DURING
THE OAK REPORTING PERIOD ARE LISTED NUMERICALLY UNDER THE
APPROPRIATE SUBJECT AFTER THE LISTING OF COMOR TARGETS.
LOCATIONS OF TARGETS IN THIS REPORT ARE INDICATED BY THE COUNTRY
CODE PRECEDING THE COORDINATES.
SELECTED PHOTOGRAPHIC REFERENCES FOR EACH TARGET OBSERVED AND
REPORTED FOLLOW THE DESCRIPTION OF THE TARGET. PASS NUMBERS ARE
SUFFIXED WITH EITHER AN A FOR ASCENDING (SOUTH-TO-NORTH) OR
D FOR DESCENDING (NORTH-TO-SOUTH) FRAMES ARE INDICATED BY THE
LETTERS FR, THE LETTER F PRECEDING FRAME NUMBERS INDICATES THE
FORWARD CAMERA, AND THE LETTER A INDICATES THE AFT CAMERA,
UNIVERSAL REFERENCE GRID IX-Y)-COORDINATES ARE GIVEN IN PARENTHESIS
AFTER THE FRAME TO WHICH THEY APPLY. THIS GRID IS IDENTIFIED AS
UNIVERSAL GRID NO 11 FEB 64. SYMBOLS INDICATING CONDITIONS WHICH
AFFECT THE APPEARANCE OF THE TARGET ON THE PHOTOGRAPHY ARE AS
FOLLOWS - C (CLEAR}, H (HAZEL, HC (HEAVY CLOUD COVER),
SC (SCATTERED CLOUD COVER), SO (SEMIDARKNESS), 0 (OBLIQUITY),
S(SNOW), PQ (POOR IMAGE QUALITY).
OAK RECIPIENTS ARE CAUTIONED THAT THE INITIAL SCAN OF.THE
PHOTOGRAPHY FROM :MISSION 1009-1 IS BEING ACCOMPLISHED IN A SHORT
TIME AND OFTEN WITHOUT THE AID OF PRECISE ANALYTICAL AND MENSURAL
EQUIPMENT COMMONLY EMPLOYED IN DETAILED PHOTOGRAPHIC ANALYSIS.
CONSEQUENTLY, ALTHOUGH THE INFORMATION PRESENTED HEREIN IS
ESSENTIALLY ACCURATE, FUTURE, DETAILED ANALYSIS MAY SOMEWHAT ALTER
PORTIONS OF THE INFORMATION.
25X1
Approved For Release 2002/08/23 : CIA-R P78BO456OA002500010014-6
TOP SECRET
Approved For Release 2002/08/23 : CIA-RDP78BO456OA002500010014-6
Next 2 Page(s) In Document Exempt
Approved For Release 2002/08/23 : CIA-RDP78BO456OA002500010014-6
Approved For Release 2002/08/23 : CIA-RDP78BO456OA002500010014-6
Highlights
Approved For Release 2002/08/23 : CIA-RDP78BO456OA002500010014-6
Approved For Rye
lease 20/089 8FATR
PP78BO456OA0025
HIGHLIGHTS
25X1
25X1
1. OLOVYANNAYA ICBM COMPLEX
NEW ACTIVITY AT THE OLOVYANNAYA ICBM COMPLEX REVEALS WHAT APPEARS TO
BE A NEW CONCEPT OF SILO DEPLOYMENT. THIS ACTIVITY..IS LOCATED NNE
OF.LA.UNCH AREA C AND CONSISTS OF AT LEAST ONE CONFIRMED SINGLE
SILO UNDER CONSTRUCTION AND FIVE PROBABLE SINGLE SILOS UNDER
CONSTRUCTION. THESE SILOS ARE ARRANGED IN A CIRCLE APPROXIMATELY
6 NM IN DIAMETER AND SPACED, ON THE AVERAGE, APPROXIMATELY 3 NM
APART. LOCATED AT THE CENTER (51-05N 116-04E) OF THE CIRCLE IS
WHAT APPEARS TO BE A SUPPORT/CONTROL FACILITY.. THE COMPLEX WILL BE
REPORTED IN DETAIL IN OAK PART II.
2. BOLSHAYA KAMENKA IRBM LAUNCH SITE
NO CHANGE HAS BEEN NOTED IN THE CONSTRUCTION STATUS OF THE ONE-
POSITION HARD IRBM LAUNCH AREA
WHEN IT WAS FIRST OBSERVED.
MOST UF THE CENTER IS OBSCURED BY CLOUDS. NO APPARENT CHANGE IS
NOTED AT THOSE LAUNCH AREAS WHICH ARE DISCERNIBLE.
3. KAPUSTIN YAR/VLADIMIROVKA MISSILE TEST CENTER
ALL OF THE LAUNCH POSITIONS ARE NOW PARTIALLY ENCLOSED BY REVETMENT
WALLS. TWO DARK CIRCULAR OBJECTS AT ONE OF THE POSITIONS ARE
SIMILAR TO A PAIR SEEN AT THE SARY-SHAGAN ANTIMISSILE TEST CENTER.
4.. TALLINN AMM1/SAM LAUNCH COMPLEX
5. CHEREPOVETS SUSPECT AIM/SAM LAUNCH.COMPLEX
ONLY MINOR CHANGES IN CONSTRUCTION ARE VISIBLE THROUGH SCATTERED-Tu-
HEAVY CLOUDS, CLOUD SHADOW, AND HAZE.
25X1
TOP SECRET
Approved For Release 2002/08/23 : CIA-RDP78BO456OA002500010014-6
Approved Foil
Release 264/081Ac8 TR
6. NORILSK AIRFIELD
25X1
010014- 125X1
N PIC/R-785/64
NORILSK AIRFIELD AND NORILSK ?NW AIRFIELD ARE NOT OBSERVED DUE
TO SCATTERED CLOUDS AND OBLIQUITY. HOWEVER, A NEW AIRFIELD WITH
? AN APPROXIMATELY 6,000 X 150 FOOT NE/SW RUNWAY-IS UNDER CONSTRUCTION
16 NM WEST OF NORILSK.
STATUS OF COMDR TARGET READOUT
FORTY-NINE ACTIVE COMOR TARGETS WERE OBSERVED IN THE CURRENT
REPORTING PERIOD AND ARE CONTAINED IN THIS REPORT.
25X1
Approved For Release 2002/08/23 : CIA-R P78BO456OA002500010014-6
TOP SECRET
Approved For Release 2002/08/23 : CIA-RDP78BO456OA002500010014-6
Missiles
Approved For Release 2002/08/23 : CIA-RDP78BO456OA002500010014-6
Approved For
Release 2802/089~gtATR
MISSILES
LAUNCH AREA G (SITE 6), THE COMPLEX SUPPORT FACILITY,
AND PART OF THE SITE SUPPORT FACILITY AT LAUNCH
AREA J (SITE 9) CAN BE IDENTIFIED BUT NOT INTERPRETED
DUE TO POOR QUALITY PHOTOGRAPHY,. HAZE, AND CLOUDS.
NO ABM ACTIVITY .WAS OBSERVE[ IN THE CLOUD-FREE
PORTIONS OF THE WESTERN HALF OF THE 50-NM RADIUS
SEARCH AREA. THE EASTERN PORTION WAS NOT COVERED.
VERKHNYAYA SALDA ICBM COMPLEX UR 5802N 06023E
NO.SIGNIFICANT CHANGE IN LAUNCH AREAS B (SITE I),
C ISITE.3), D (SITE 4), G (SITE 8), :I (SITE 1O),
THE COMPLEX SUPPORT FACILITY,.RAIL-TO-ROAD TRANSFER
NO ABM ACTIVITY NOTED WITHIN THE 50-NM RADIUS SEARCH
AREA, WHICH IS 80 PERCENT CLOUD COVERED.
YOSHKAR-OLA ICBM COMPLEX UR 5634N 04803E
COMPLEX WAS COVERED BY FAIR QUALITY STEREO
PHn.TnGRAPHY_. NO SIGNIFICANT CHANGES
WERE OBSERVED AT THE AI
LAUNCH AREAS A (SITE ), C (SITE 3),
D (SITE 4),: E (SITE 5),: AND F (SITE 6), OR AT THE
PROBABLE COMMUNICATIONS ASSOCIATED-FACILITY NORTH
OF THE TRANSFER POINT AND SUPPORT-TYPE FACILITY
BETWEEN LAUNCH AREAS C AND D.
25X1
25X1
25X1
Approved For Release 2002/08/23 : CIA-Fl
TOP SECRET
Approved For
Release 2Q2/081s cC TR
NO ABM ACTIVITY WAS OBSERVED IN THE CLOUD-FREE
PORTIONS OF THE EASTERN TWO-THIRDS OF THE 50-NM
RADIUS SEARCH AREA, THE WESTERN THIRD WAS NOT
COVERED.
ITATKA IGBMCOMPLEX UR 5650N 08536E
SIGNIFICANT CHANGE IN LAUNCH AREA A (SITE 1)
AND LAUNCH AREA B
LAUNCH AREA C
ISIT!'E 31
THE COMPLEX SUPPORT FACILITYy- RAIL-TO-ROAD TRANSFER
POINT, AND THE UNIDENTIFIED ACTIVITY EAST OF THE
COMPLEX SUPPORT FACILITY ARE CLOUD COVERED.
NO ABM ACTIVITY NOTED IN CLOUD-FREE AREAS WITHIN
A 50-NM RADIUS. APPROXIMATELY 80 PERCENT OF AREA
CLOUD COVERED.
NOVOSIBIRSK,ICBM COMPLEX UR 5516N 08257E
LAUNCH AREA 0 (SITE 4) IS IDENTIFIED ONLY. REST OF
COMPLEX IS CLOUD COVERED.
NO ABM ACTIVITY NOTED IN EASTERN HALF OF SEARCH
AREA, WHICH IS 60 PERCENT CLOUD COVERED.
VELSK AREA RAIL LINE UR 6105N 04206E
NO SSM :ACTIVITY .IN VISIBLE PORTION OF 50-NM RADIUS
SEARCH AREA. AREA 95 PERCENT CLOUD COVERED.
25X1
25X1
25X1
Approved For Release 2002/08/23 : CIA-IJDP78BO456OA002500010014-6
TOP SECRET
25X1
25X1A
25X1 D
25X1A
25X1 D
25X1A
25X1 D
25X1A
25X1 D
25X1A
Approved F r Release 2902/O8f23`: R
NO HARDENED SSM ACTIVITY NOTED IN THE 25-NM RADIUS
SEARCH AREA.
SLAVSK MRBM LAUNCH SITE 2 UR 550ON 02129E
NO HARDENED SSM ACTIVITY NOTED IN 25-NM RADIUS
SEARCH AREA.
AREA CANNOT BE NEGATED DUE TO SCATTERED-CLOUDS.
NO HARDENED SSM ACTIVITY NOTED IN 25-NM RADIUS
SEARCH AREA.
NO HARDENED SSM ACTIVITY NOTED IN 25-NM RADIUS
SEARCH AREA.
NO NEW SSM ACTIVITY. OBSERVED IN CLOUD-FREE PORTIONS
OF 25-NM RADIUS SEARCH AREA.
25X1
25X1
25X1
I
Approved For Release 2002/08/23 : CIA-Fi
TOP SECRET
Approved Fq'
r Release 200108If `ilk-RE
AREA CANNOT BE NEGATED DUE TO 85 PERCENT CLOUD COVER.
VORU MRBM LAUNCH SITE 2 UR 5749N 02650E
NO NEW SSM ACTIVITY OBSERVED IN 25-NM SEARCH AREA.
AREA CANNOT BE NEGATED DUE TO HEAVY CLOUDS AND HAZE
WHICH COVER APPROXIMATELY 85 PERCENT OF THE AREA.
NEMAN MRBM LAUNCH SITE UR 5501N 02211E
NO HARDENED SSM ACTIVITY NOTED IN THE 25-NM RADIUS
SEARCH AREA.
AREA CANNOT BE NEGATED DUE TO SCATTERED CLOUDS.
SKRUNDA IRBM.LAUNCH SITE UR 5635N 02149E
NO APPARENT CHANGE
IECAVA MRBM LAUNCH SITE Uk 5633N 02420E
VAINODE IRBM LAUNCH SITE UR 5628N 02150E
CONSTRUCTION OF.THE LAUNCH SITE APPEARS COMPLETE.
BUILDING-LIKE STRUCTURES APPEAR OVER THE SILO
25X1
25X1
25X1
Approved For Release 2002/08/23 : CIA- DP78BO456OA002500010014-6
TOP SECRET
Approved Fo4
Release 2U /08/23'-C:1K R P78BO456OA00250 010014 25X1 MISSION 1009-1, 6-9 AUGUST 1964 25X1
N P I C/R-785/64
POSITIONS, POSSIBLY AS A MEASURE
COMMUNICATIONS AREA
APPEAR TO BE STILL N.
POSTAVY MRBM LAUNCH SITE 2 UR 5506N 02700E
IDENTIFICATION ONLY.
BOLSHAYA KAMENKA IRBM LAUNCH SITE UR 5145N 04541E
NO APPARENT CHANGE IN LAUNCH SITE SUPPORT
FACILITY BOTH REMAIN
INCOMPLETE. NO CONSTRUCTION EQUIPMENT OR VEHICULAR
ACTIVITY DISCERNIBLE IN. LAUNCH AREA.. THE NEW ROAD
UNDER CONSTRUCTION BETWEEN.. THE. LAUNCH AREA AND THE
THE. POLCHANINOVKA-BOLSHAYA KAMENKA HIGHWAY HAS
NOT BEEN EXTENDED, BUT HAS BEEN IMPROVED
I
KAPUSTIN YAR/VLADIMIROVKA MSL..TEST -CTR UR 4835N 04545E
THE MAJOR PORTION OF THE KAPUSTIN YAR/VLAD MIROVKA
MISSILE TEST CENTER IS OBSCURED BY CLOUDS. THE
FOLLOWING SSM FACILITIES AND ELECTRONICS SITES ARE
DISCERNIBLE, THOUGH FOR THE MOST PART NOT
INTERPRETABLE.
TROOP TRAINING AREA - ID ONLY.
PROBABLE MISSILE ND CHECKOUT AREA - I D
ONLY.
LAUNCH AREA ...1C-- ID ONLY.
LAUNCH AREA 2C'--.ID ONLY.
25X1
Approved For Release 2002/08/23 : CIA- DP78B04560A002500010014-6
TOP SECRET
Approved F
br Releas1QU2/Af2J F&Iiq-
ZAGORSK ROCKET TEST FACILITY UR 5627N 03812E
NO APPARENT CHANGE
IN CLOUD-FREE AREAr.
OBSERVED.
NG RAIL CARS
KRASNOYARSK EXPLOSIVES PLANT ZLOBINO UR 5602N 09303E
IDENTIFICATION ONLY.
KALININGRAD SUSP NAVAL MISSILE STORAGE UR 545ON 02028E
IDENTIFICATION ONLY. AREA IS 75 PERCENT CLOUD
COVERED.
25X1
25X1
SOVETSKAYA GAVAN NVL BASE EA SHIPYARD 263 UR 4858N 14017E
SOUTH SHORE OF SOVETSKAYA GAVAN --::6 LARGE AND
APPROXIMATELY 10 SMALL BUILDINGS AND 4 PIERS.
A LARGE PRODUCTION-TYPE BUILDING LOCATED 0.5 NM
WEST MAY BE ASSOCIATED.
I
Approved For Release 2002/08/23 : C14
25X1
TOP SECRET
or Release T2QR/0?f3`-:'Eho(-l4DP78B04560A00250
VESSELS -- ONE CL 3 DD, .4 DE WEST OF TORPEDO DEPOT,
ONE-DD, 2 DE, 2 PC-NEAR THE PT BASE, 2.W/R-CLASS 5S,
ONE. PROBABLE MV-CLASS SS AT THE SUBMARINE BASE,
ONE DE AT THE SEAPLANE STATION, ONE PROBABLE W/R-CLASS
SS AND 3 DE AT THE SHIPYARD, AND 3 DE ANCHORED
IN THE HARBOR.
TALLINN AMM/SAM LAUNCH COMPLEX UR 5924N 02419E
CONSTRUCTION HHAS CONTINUED-AT HE LAUNCH COMPLEX
REVETMENT WALLS
HAVE BEEN CONSTRUCTED AT FIVE LAUNCH POSITIONS.
ALL OF THE LAUNCH POSITIONS ARE NOW PARTIALLY
ENCLOSED BY REVETMENT WALLS. A DARK, CIRCULAR
OBJECT APPROXIMATELY IN DIAMETER IS OBSERVED
ON 25 OF THE LAUNCH NS ON THE END OF THE
POSITION NEAREST THE .UNIDENTIFIED FACILITY. AT ONE
OF THE LAUNCH POSITIONS THERE ARE 2 DARK CIRCULAR
OBJECTS PLACED AT EACH END OF THE PAD AND
APPROXIMATELY 155 FT APART. A SIMILAR PAIR OF
OBJECTS APPROXIMATELY 150 FT APART WERE IDENTIFIED
ATSARY-SHAGAN ANTIMISSILE TEST CENTER LAUNCH
COMPLEX At SITE 3: PAD 5
25X1
P010014 1 V- 25X1
NPIC/R-785/64
A PARALLEL TRACE IS NOW OBSERVED ALONG THE NORTH
FENCE LINE AND IS PROBABLY A SECOND SECURITY FENCE
UNDER CONSTRUCTION.
THE EASTERNMOST AND WESTERNMOST HEXAGONAL SITES AND
PORTIONS OF THE OTHER THREE. SITES ARE VISIBLE WITH
INTERPRETATION LIMITED BY.SCATTERED-TO-HEAVY CLOUDS,
CLOUD SHADOW, AND HAZE. THE SOUTHERN BORDER OF THE
CENTRALLY LOCATED SITE HAS BEEN BROADENED
25X1
I
Approved For Release 2002/08/23 : CIA-R P78BO456OA002500010014-6
TOP SECRET
~~~~ cc~~((~~~pF~T7-
Approved Fo Release T2~0'2/O8123` Q 1- 0010014-6 25X1
25X1
MISSION 1009-1, 6-9 AUGUST 1964
ON IIPHOTOGRAPHY EXTENDS SOUTH APPROXIMATELY 1,000
FT FROM.THE SW CORNER OF THE WESTERNMOST SITE. THE
SOUTHERN PORTION OF THE SECURED COMPLEX IS CLOUD
COVERED. NO APPARENT CHANGE IS OBSERVED IN A
SUPPORT AREA LOCATED APPROXIMATELY ONE NM WEST OF THE
HEXAGONAL SITES. A NORTH-SOUTH ROAD LOCATED
APPROXIMATELY 1,000 FT WEST OF THE SUPPORT AREA
APPEARS TO HAVE BEEN WIDENED SINCE JULY.
NO MISSILES, MISSILE-RELATED EQUIPMENT, ELECTRONICS,
OR COMMUNICATIONS FACILITIES WERE OBSERVED.
SEGMENTS OF THE HEXAGONAL SITES AND SECURITY.
FENCING WERE VISIBLE ON PHOTOGRAPHY
WITH SNOW CONDITION
25X1
Approved For Release 2002/08/23 : CIA- P78BO456OA002500010014-6
TOP SECRET
Approved For Release 2002/08/23 : CIA-RDP78BO456OA002500010014-6
Air
Facilities
Approved For Release 2002/08/23 : CIA-RDP78BO456OA002500010014-6
Tnp CF pF
Approved Fo Release 26H2/08~23CCh4T P78B04560A0025 0010014-6 25X1
5X1
MISSION 1009-1, 6-9 AUGUST 1964
AIR FACILITIES
AIRCRAFT -- 2 .BEAR AND 2 PROBABLE BISON IN LOADING
AREA, 10 BEAR ON SSW.PARKING APRON, 7 BEAR AND 4
BEAR/BISON ON CENTER HARDSTANDS,7 BEAR ON MAIN
PARKING APRON, 4 BEAR ON HARDSTAND ACROSS FROM MAIN
PARKING APRON, 7 BEAR ON NNE HARDSTANDS, ONE BEAR ON
GRASS AT NNE END OF FIELD, AND ONE MEDIUM STRAIGHT-
WING ON ALERT APRON AT NORTH END OF FIELD.
AIRCRAFT -- 33 BISON ON MAIN PARKING APRON, ONE
BISON IN MAINTENANCE AREA, 2 MEDIUM STRAIGHT-WING
AND 27 SWEPT-WING FIGHTERS ON NORTH PARKING APRON,
ONE BADGER ON MAIN PARKING APRON,,ONE BADGER,
3 PROBABLE CAB, ONE LIGHT TRANSPORT, AND ONE SMALL
STRAIGHT-WING ON SOUTH PARKING APRON, 2 UNIDENTIFIED
SWEPT-WING ON SOUTHWEST PARKING APRONt AND ONE
POSSIBLE HOOK HELICOPTER IN LOADING STAND AREA.
SCATTERED CLOUDS AND HAZE PRECLUDE FURTHER
INTERPRETATION.
AIRCRAFT -- 10 BADGER AND 3 PROBABLE LIGHT TRANSPORT.
NORILSK AIRFIELD AND NORILSK: NW AIRFIELD ARE NOT
OBSERVED BECAUSE OF SCATTERED CLOUDS AND OBLIQUITY.
25X1
1
Approved For Release 2002/08/23 : CIA-R P78BO456OA002500010014-6
TOP SECRET
Approved
~~pp ~~R~T 25X1
~or Releast`3002l A 00010014- 25X1
MISSION 1009-1. 6-9 AUGUST 1964
A NEW AIRFIELD IS UNDER CONSTRUCTION AT 69-18N
087-23E, 16 NM WEST OF NORILSK. EARLY CONSTRUCTION
CONSISTING OF A CONSTRUCTION BASE ALONG THE RAILROAD
AT 69-22N 087-22E, A ROAD LEADING TO THE AREA OF
CONSTRUCTION, AND UILDINGS AT THE. NEW AIRFIELD
SITE WERE EVIDENT THE NEW
AIRFIELD HAS AN APR[!P~ROXMAItLT 01101010 A FT NEISW
RUNWAY UNDER CONSTRUCTION. SURFACE AND SERVICEABILITY
UNDETERMINED DUE TO CONSTRUCTION.
NO AIRCRAFT OBSERVED.
KALININGRAD/PROVEREN AIRFIELD UR 5446N 02025E
NO APPARENT CHANGE
AIRCRAFT -- 8 PROBABLE BADGER, 25 PROBABLE BLINDER,
2 POSSIBLE BLINDER, ONE MEDIUM STRAIGHT-WING, AND
ONE UNIDENTIFIED SMALL AIRCRAFT OBSERVED IN CLOUD-FREE
PORTIONS.
BELAYA TSERKOV AIRFIELD UR 4947N 03001E
AIRCRAFT -- 5 BEAR ON HARDSTANDS AT NE END :OF FIELD,
ONE PROBABLE BULL:ON GRASS AT NE END OF FIELD,
62 BADGER ON HAROSTANDS AND GRASS ALONG EDGE OF
LOOP TAXIWAY, AND 5 BADGER ON MAIN PARKING APRON.
SCATTERED CLOUDS COVER SUPPORT FACILITIES.
ZHITOMIR/SKOMOROKHI AIRFIELD UR 5010N 02844E
AIRCRAFT 2 BADGER AND ONE PROBABLE BULL IN
MAINTENANCE AREA. PARKING AREA LARGELY OBSCURED BY
HEAVY CLOUDS.
25X1
Approved For Release 2002/08/23 : CIA- DP78BO456OA002500010014-6
TOP SECRET
Approved IF
or Releas1902/cV cR9Ik
OSTRDV VRANGELYA/SOMNITELNAYA AIRFIELD UR 7057N 17936W
AIRFIELD LOCATED ON SOUTH COAST OF OSTROV VRANGELYA
NEAR NE SHORE OF BUKHTA SOMNITELNAYA.
11,000 X 350 FT ENE/WSW GRADED EARTH RUNWAY,
SERVICEABLE.
KAZAN AIRFRAME PLANT'GORBUNOV 22 UR 5552N 04907E
AIRCRAFT -- 21 BLINDER, 7 BADGER, 2 PROBABLE CAB,
AND ONE MEDIUM STRAIGHT-WING.
NO APPARENT CHANGE: IN PLANT FACILITIES.
25X1
25X1
25X1
1
Approved For Release 2002/08/23 : CIA-RPP78BO456OA002500010014-6
TOP SECRET
Approved For Release 2002/08/23 : CIA-RDP78BO456OA002500010014-6
Nuclear
Energy
Approved For Release 2002/08/23 : CIA-RDP78BO456OA002500010014-6
Approved For Release 2002/08/23 : CIA-RDP78BO456OA002500010014-6
Next 2 Page(s) In Document Exempt
Approved For Release 2002/08/23 : CIA-RDP78BO456OA002500010014-6
Approved For Release 2002/08/23 : CIA-RDP78BO456OA002500010014-6
Naval
Activity/
Ports
Approved For Release 2002/08/23 : CIA-RDP78BO456OA002500010014-6
Approved For
elease Z06Z/084k4. k-P,
25X1
25X1
NAVAL ACTIVITY/PORTS
TALLINN NAVAL BASE C SHPYD MORSKOY ZAVOD UR 5927N 02444E
IDENTIFICATION ONLY.
RIGA NAVAL BASE UR 5703N 02402E
ONE PROBABLE W/R-CLASS SS, ONE AUXILIARY, AND SEVERAL
UNIDENTIFIED SMALL VESSELS.
GDYNIA NAVAL BASE OKSYWIE PO 5432N 01833E
NO SUBMARINE BUILDING OR LOGISTIC FACILITIES OBSERVED.
VESSELS -- ONE 400 FT DD, ONE 350 FT DD, AND ONE
250 FT SS.
NIKOLAYEV SHIPYARD NOSENKO 444 UR 4657N 03159E
FOUR UNIDENTIFIED VESSELS IN BASIN. POOR QUALITY
PHOTOGRAPHY PRECLUDES FURTHER INTERPRETATION OF SHIPS
ON BUILDING WAYS.
NO APPARENT CHANGE IN FACILITIES
NO SHORE-BASED SUBMARINE FACILITIES OBSERVED.
25X1
2
Approved For Release 2002/08/23 : CIA-R P78BO456OA002500010014-6
TOP SECRET
Approved For Release 2002/08/23 : CIA-RDP78BO456OA002500010014-6
Biological/
Chemical
Warfare
Approved For Release 2002/08/23 : CIA-RDP78BO456OA002500010014-6
Approved For Release 2002/08/23 : CIA-RDP78BO456OA002500010014-6
Approved For Release 2002/08/23 : CIA-RDP78BO456OA002500010014-6
Approved For Release 2002/08/23 : CIA-RDP78BO456OA002500010014-6
Electronics/
Communications
Approved For Release 2002/08/23 : CIA-RDP78BO456OA002500010014-6
Approved F
br Release 2b2/09/~" R -
25X1
0010014 25X1
N PIC/R-785 64
ELECTRONICS/COMMUNICATIONS
DUSHAMBE SUSPECT ELECTRONIC TRACKING FAC UR 3832N 06847E
NO ELECTRONIC TRACKING FACILITY IDENTIFIED WITHIN
A 25-NM RADIUS OF DUSHAMBE.
NO APPARENT CHANGE IN THE TWO ADJACENT PLUS-SHAPED
INTERFEROMETERS
HOWEVER, GROUND
INTERFEROMETERS INDICATE THE SITE IS STILL UNDER
CONSTRUCTION.
25X1
Approved For Release 2002/08/23 : CIA-FF
TOP SECRET
Approved For Release 2002/08/23 : CIA-RDP78B04560A002500010014-6
Other
Activity
Approved For Release 2002/08/23 : CIA-RDP78B04560A002500010014-6
Approved For Release 2002/08/23 : CIA-RDP78BO456OA002500010014-6
Next 1 Page(s) In Document Exempt
Approved For Release 2002/08/23 : CIA-RDP78BO456OA002500010014-6
Approved For Release 2002/08/23 : CIA-RDP78BO456OA002500010014-6
Attachments
Approved For Release 2002/08/23 : CIA-RDP78BO456OA002500010014-6
Approved For
Release 70W108/Y3 W -h
25X1
25X1
25X1
25X1
Approved For Release 2002/08/23: CIA-RDP78B04560A002500010014-6
TOP SECRET
Approved F4
NEWLY CONSTRUCTED
REVETMENT WALLSI
2 DARK OBJECT5
PPROXIMATELY DIAMETER
ON PAD I11111111111111111
iA 7 _
NEWLY CONSTRUCTED
REVETMENT WALLA
Approved For Release 2002/08/23 : CIA- DP78BO456OA002500010014-6
TOP SECRET
r Release 2U82f08/9:q R
25X1
125X1
25X1
25X1
Approved For Release 2002/08/23 : CIA-RDP78BO456OA002500010014-6
Next 3 Page(s) In Document Exempt
Approved For Release 2002/08/23 : CIA-RDP78BO456OA002500010014-6
Approved For Release 2002/08x19?Cl~- T PT8B04560A002500010014-6
Approved For Release 2002/08/23 : CIA-RDP78B04560A002500010014-6
TOP SECRET