DARIEN (LU-TA) SHIPYARD LU-TA, CHINA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04560A004700010046-7
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
9
Document Creation Date: 
December 28, 2016
Document Release Date: 
February 23, 2004
Sequence Number: 
46
Case Number: 
Publication Date: 
May 1, 1965
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78B04560A004700010046-7.pdf459.26 KB
Body: 
N P I C/R-175/65 May 1965 DARIEN (LU-TA) SHIPYARD LU-TA, CHINA DECLASS REVIEW by NIMA/DOD Approved For Releas Approved For Release 2004/05/12 : CIA-RDP78BO456OA004700010046-7 WARNING This document contains information affecting the national defense of th,e United States, within the meaning of Title 18, sections 793 and 794, of the U.S. Code, as amended. Its transmission or revelation of its contents to or receipt by an unauthorized person is prohibited by law. Approved Fob- Release 2004/05/12 : CIA-~DP78B04560A004700010046-7 25X1 SECRET proved For Release 2004/05/12 : CIA- J DARIEN (LU-TA) SHIPYARD, LU-TA, CHINA 25X1A 25X1 D INTRODUCTION This is one of a series of reports on Chinese Communist Shipyards and Port Facilities ob- served on aerial photography. The Darien (Lu- ta) Shipyard is located on the northeast outskirts of Lu-ta, China, on the south- ern shore of Ta-lien Bay at 38-55-52N 121-38- 20E (Figure 1). Lu-ta is also known as Ta-lien and Darien. This shipyard is listed in the Bomb- ing Encyclopedia as Ta-lien Shipyard Port Ar- thur Darien DESCRIPTION The shipyard (Figure 2) is road- and rail- served, secured by a wall, and derives its elec- NPIC/R-175/65 trical power from a thermal electric powerplant located immediately south-southwest of the ship- yard. Facilities include 3 building ways, l build- ing area on a mole, 2 graving docks, 1 L-head pier, 9 piers, and 2 quayed areas for the fitting out of vessels. Vessels are moored to the piers in the NW section of the yard even though the en- tire area is quayed. Vessels are end launched from the 3 building ways and crane launched from the building area. Handling facilities include 4 tower hammerhead cranes and 6 tower jib cranes. Significant construction activity during the period of photographic coverage used for this study Iwas that of a G-class SSB submarine on building way B3. 25X1 SECRET 1 121 ?45~ 25X1 Apploved For Release 2004/05/12 : CIA-F DP781304560A004700010046-7 Approved For Release 200 EREcIA-RDP78B04560A004700010046-7 25X1 2 Storage 3 Forge/foundry 4 Forge/foundry 5 Forge/foundry 6 Storage 7 Probable machine shop 8 Storage 9 Storage 10 Storage 11 Maintenance/workshop 12 Maintenance/workshop 13 Maintenance/workshop 14 Maintenance/workshop 15 Storage 16 Maintenance/workshop 17 Maintenance/workshop 18 Steamplant 19 Probable fabrication 20 Storage 21 Fabrication 22 Storage 23 Probable mold loft 24 Fabrication and assembly 25 Probable machine shop 26 Probable machine shop 27 Storage 28 Storage 29 Storage 30 Fabrication 31 Machine shop 32 Probable fabrication 33 Possible mold loft 34 Fabrication 35 Machine shop 37 Probable forge/foundry 38 Possible structural design 39 Possible structural design 40 Possible structural design 41 Probable machine shop Al Open assembly A2 Open assembly A3 Open assembly A4 Open assembly BI Building area B2 Building way B3 Building way B4 Building way C1 Craneway C2 Craneway C3 Craneway C4 Craneway C5 Craneway C6 Craneway D1 Quayed Area D2 L-Head pier Approach D3 Fitting out and off-loading mole/pier D4 Fitting-out quay El Graving dock E2 Graving jock 25X1 SECRET Approved For Relea Dimensions (ft) 260 x 50 95 x 50 95 x 50 35 95 x 70 255 x 105 260 x 50 375 x 105 190 x 145 150 x 70 150 x 30 550 x 90 150 x 95 100 x 100 150 x 95 165 x 70 280 x 70 290 x 50 150 x 50 150 x 50 260 x 70 200 x 105 100 x 80 315 x 60 185 x 60 330 x 35 390 x 85 80 x 60 340 x 85 100 x 50 140x 30 150 x 50 430 x 70 215 x 125 60 x 50 105 x 95 600 x 45 140x 85 135 x 50 40 x 20 90 x 70 280 x 140 225 x 105 325 x 105 555 x 105 580 x 115 350 x 120 At least 850 x 25 1.020 x 35 1170 x 35 1,170 x 35- 870 x 25 375 x 40 210 x 75 15 ft wide 2 350 linear ft r280linear ft 560 x 105 450 x 80 NPIC/R-175/65 Gable Gable with monitor Gable with skylights Flat with monitor Gable Complex Gable over flat Multigable Multigable with skylights Multigable Multigable Gable with monitor Gable Flat Flat Flat and gable with skylights Multigable with monitor Multigable Flat with monitor Flat Flat Gable and flat Gable Flat with monitor Flat with monitor Flat and arch Arch Flat with monitor Multigable with skylights Gable Gable with monitor Flat 25X1 D 25X1 D 25X1 D 25X1 25X1 Approved For Release 2 NPIC/R-175/65 25X1 D 25X1 D 25X1 D 25X1 C stage of construction of construction a G-class SSB was observed at Lu-ta Port Facilities, immediately east of this shipyard. Vessels are listed in Table 2, which reflects a transition from predominately commercial to predominately naval activity dur- B1 B2 B3 B4 End of C4 Ends of C3 & C4 U/I hulls (2) Merchant U/I Merchant 70 x 20 550 x 80/ KKFKK/6 390 x 50/ KFK/4 End of C5 End of C6 D1 Lighters (2) Tug Tug Probable floating cranes (2) Lighter D3 Merchant 380 x 50/ Merchants (3) MFM/4 435 x 60/ Merchant KFMK/5 550 x 80/ Tugs (4) Probable floating crane U/I (2) KKFKK/6 70 x 20 U/I 40 x 10 U/C U/C U/C Fitting out Fitting out Fitting out ing the eriod. 25X1 D Photography 25X1 D = eveals minor changes in construction and 25X1 D razing and renovation of facilities. Photography I eveals the addition of one probable tower jib crane on craneway Cl. Photography reveals the removal of one tower hammerhead crane and the addition of one tower jib crane on craneway C3. U/C, Shed-covered security screens Merchant 390 x 50/ U/C KFK/4 Tug Floating Crane Merchants (2) 490 x 60/ Fitting out KKFK/5 Merchant 435 x 60/ Fitting out KFK/4 Probable tug Utility barge Tugs (2) Utility barges (2) Possible small tanker U/I (2) U/I (2) Merchant Gordyy-class ODD Probable floating cranes (2) Tug 295 x 50/ Off loading MFKM/4 435 x 65/ Fitting out KFK/4 550 x 80/ Fitting out KKFKK/6 25X1 Approved For Release 200410511?tekfpP78BO456OA004700010046-7 25X1 25X1 C 25X1 D 25X1 C 25X1 D 25X1 D MK-6-class LCM (8) Tugs (2) Small tanker 25X1 D Approved For Relea NPIC/R-175/65 Size (Ft)/ Size (Ft)/ Location Identification Configuration/ Status Identification Configuration/ Status Hatches Hatches D4 LST 345 x 55 Fitting out Probable tanker 345 x 55/ Fitting out Possible OPF 230 x 30 Repair U/I (3) Tug El Merchant 435 x 60/ Fitting out/ Merchant 435 x 60/ Fitting out repair U/I U/C or r e- U/I U/C or re- pair pair U/I U/C or re- U/I U/C or re- pair pair E2 Merchant 320 x 35/ U/C Possible OPF 230 x 30 Repair --/4 U/I hull 120 x 20 U/C U/I 120 x 20 U/C Al MK-6-class LCM U/C (8) B2 Shanghai-class U/C MK-6-class LCM U/C (2) Probable Shanghai- U/C Shanghai-class U/C class PTF PTF (7) MK-6-class LCM U/C Tugs (2) U/C (2) Tugs (2) U/C B3 Possible G-class U/C G-class SSB U/C SSB B4 Merchant 390 x 50/ U/C KFK/4 End of C3 Possible OPF 230 x 30 Repair Possible OPF 230 x 30 Repair U/I 120 x 20 U/C U/I (2) 190 x 20 Repair Lighter Ends of C3 Tug & C4 Kronshtadt-class Repair PC (2) U/I 165 x 25 Repair End of C5 U/I Utility barges (5) Lighter Floating crane U/I (2) U/I (2) D3 Merchants (2) 2, x 3. KFK/4 Fitting out 120 x 20/ MF 2 x , Off loading MFKM/4 435 x 60/ Fitting out KFMK/4 Floating cranes (3) Lighters (2) Utility barges (2) Merchants (2) 290 x 50/ MFM/4 Merchant 385 x 60/ KFK/4 25X1 D 25X1 D 25X1 Approved For Release 2004/05/12: CIA-RDP78BO456OA004700010046-7 SECRET 25X1 Approved For Release 200 560A004700010046-7 NPIC/R-175/65 25X1 C 25X1 D Probable MK-6- class LCM (9) D3 Merchant 550 x 75/ Fitting out Merchants (2) 435 x 65/ KKFKK/5 KFKK/5 Merchant 230 x 40/ Merchant 540 x 80/ Fitting out MF KFKK/5 Utility barges (3) U/I 170 x 20 U/I (3) 70 x 20 D4 Floating crane Merchants (3) 450 x 60/ Merchant 300 x 45/ Fitting out/ KKFK/5 MFM/4 repair Merchants (4) 435 x 60/ Fitting out/ Lighter KKFKK/5 repair El Merchant 435 x 60/ Fitting out Merchant 430 x 65/ Fitting out U/I KFMK/4 MMFM/4 E2 Possible OPF 230 x 30 Repair II Merchant 320 x 45 Repair U/I 120 x 20 U/C Size (Ft)/ Configuration/ Hatches U/C or repair U/I (2) Fitting out/ repair 25X1 D B2 Shanghai-class PTF (8) Tug B3 Shanghai-class PTF (3) Probable tugs (3) U/I hull Tug U/I hull Possible motor- ized crane boat U/C 70 x 25 U/C U/C 35 x 35 U/C 90 x 30 U/C Ends of W-class SS C3 & C4 End of C5 Tugs (2) Motorized crane 90 x 30 Shanghai-class PTF (4) Tug Shanghai-class PTF (5) Tugs (4) Merchant hull 95 x 35 U/C sections (2) (fwd) 120 x 35 (aft) MK-6-class LCM Fitting out (5) Lighter Tug U/I (2) Size (Ft)/ Configuration/ Hatches Motorized crane 90 x 25 Fitting out boats (2) Tugs (3) Lighter 25X1 Approved For Release 2004/05/g~eI,Qff P78BO4560A004700010046-7 Approved For Releas R J- 8BO456OA004700010046-7 NPIC/R-175/65 Size (Ft Configurati Hatches )/ on/ Siz Confi Ha e (Ft)/ guration/ tches (8) Prob cla able ss L MK-6 CM (10) Probable MK-6- Poss ible LCVP 60 x 15 Fitting out class LCM (2) (4) Small tanker Smal l tan ker 135 x 30/ Probable floating Moto rized crane 90 x 30 crane boa ts (3 ) Lighter Floa ting cranes (2) Utility barges (2) Ligh ter Motorized crane 90 x 3 boats (3) 0 Tug U/I ( 4) Probable small tanker 190 x 3 5/ Gord yy-c lass OD D (3 ) Floating cranes W-cl ass S S Repair (3) Shan ghai -class Fitting out U/I PT F (3) Utility barges (2) Floa ting dry 190 x 80 Tugs (6) Gordyy-class ODD doc Tugs k (3) (2) Floa ting crane Shanghai-class PTF Gordyy-class ODD Merchant 435 x 6 0/ Probable Utili ty ba rge KFK/4 repair Floating dry dock 190 x 8 0 Tug Lighter 410 x 60/ Repair U/I MFM/5 120 x 25 Repair U/I 90 x 20 Repair Smal l tan ker 135 x 35 Repair Approved For Release 2004/05/12 : CIA-RDP78BO456OA004700010046-7 SECRET Approved For Release 20941051L. ?: g"' T IP78O^4`60AO04700010046-7 MAPS DIA. US Air Target Chart, Series 200, Sheet 0381-10HL, 2d ed, Aug 63 (SECRET) ONI. Port Plan 21143, Jun 58 (SECRET) DIA. Town Plan 39872, Apr 64 (SECRET) Approved For Release 2004/05/12 Effff 78BO456OA004700010046-7 O