CHING-LAN CHIANG MOTOR TORPEDO BOAT BASE, HAI-NAN TAO, CHINA
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04560A005100010004-8
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
7
Document Creation Date:
December 28, 2016
Document Release Date:
January 10, 2000
Sequence Number:
4
Case Number:
Publication Date:
December 1, 1965
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 414.06 KB |
Body:
Telease 2000/04/17: C ; P78
PHOTOGRAPHIC INTERPRETA1 REPO
CHING-LAN CHIANG MOTOR
TORPEDO BOAT BASE,
HAI-NAN TAO, CHINA
Approve elease 2000/04/ 7 : CIA-RDP78BO456OA00510
'~ SECRE
NPIC/R-463/65
DECEMBER 1965
GROUP I EXCLUDED FROM
AUTOMATIC DOWNGRADING
AND DECLASSIFICATION
Approved For Release 2000/04/17 : CIA-RDP78BO456OA005100010004-8
WARN INC
This document contains informat m affecting
the national defenses of the United States,
within the meaning of Title 8, sections
793 and 794, of the U.S. Code, as amended.
`ts transmission or revela ion .7f its contents
to (jr receipt by an unacthoriz-d person is
prohibited by law.
Approved For Release 2000/04/17 : CIA-RDP78BO456OA005100010004-8
Approved For I&Qe 2000/04/17$bP78B04560A00510001000
CHING-LAN CHIANG MOTOR TORPEDO BOAT BASE,
HAI-NAN TAO, CHINA
INTRODUCTION
This is one of a series of reports on Com-
munist Chinese naval facilities as observed on
aerial photography.
The Chin -Ian Chiang Motor Torpedo Base
is located on the north-
eastern coast of Hai-nan Tao (Island) between
Ching-Ian Chiang (Bay) and Pa-men Wan (Bay)
and 0.5 nautical miles southeast of Ching-lan-
shang-shih at 19-33N 110-49E (Figure 1). This
base (Figures 2 and 3) was first observed on
photography in - and comparative
Cling-Ian-
shang-shill FERRY
-CHING-LAN CHIANG
analysis reveals no major changes to facilities
or buildings as of~
DESCRIPTION
Facilities at the base (Figure 3) consist of
a transverser platform and launching cradle with
12 storage cradles at right angles to the platform.
a marine railway, a T-head pier and possible
pontoon extension, a quaycd area, and numerous
associated buildings. Two AAA Sites defend
the base.
MOTOR TORPEDO
BOAT BASE
NPIC N S 735
FIGURE 1. LOCATION OF CHING-LAN CHIANG MOTOR TORPEDO BOAT BASE, HAI-NAN TAG, CHINA.
Approved Foy lease 2000/04/tt IArRDP78BO4560A005100010004-8
Approved For Releasg ~/04/17: CIA- U4560A005100010004-8
Location Identification
1
4 4 P-6-Class PT
2 Small craft
6 1 Probable US
136 ft-class MSC (0)
2 P-6-class PT
Identification
1 Possible YP
2 P-6-class 1?T
7 2 P-6-class PT
2 u/i small craft
NPIC/R-463/65
1 Kronshtadt-class PC
1 P-6-class PT
2 Possible YP
1 u/i small craft
FIGURE 2. CHING-LAN CHIANG MO rOR TORPEDO BOAT BASE, HAI-NAN TAO, CHINA,
25X1 D
Approved For Release 20q y17 : CIA-RDPZ$?M OA005100010004-8
4 1]
POSSIBLE RADAR
ON ROOF
ApprovedUFor Release 2000/04/17 : Cl
O
1-7
/']2
WATER TOWER
jo / 121
113
lIBASKETBALL
COURTS
20
f
0
Compiled from Mission)
Road
Building
-W- Wall
-RDP78B060A00510001
17
/11
C7
1
Marine railway
120 x 10
2
Storage cradles (3)
120 x 80
3
Transverser platform
385 x 55
4
Storage cradles (9)
255 x 110
5
Quay
450
6
Modified 1-head pier
150 x 20
180 ft approach
7
Possible pontoon extension
105 x 25
8
Administration
280 x 60
Hip
9
Support(7)
100 x 25
(largest)
Varies
10
Vehicle maintenance
105 x 25
Gable
11
Vehicle maintenance
125 x 40
Flat
12
Probable support/storage (5)
90 x 25
(largest)
Varies
13
Possible recreation hall
110 x 55
Hip
14
Possible support
65 x 30
Hip
15
Possible support
80 x 30
Hip
16
Possible barracks (3)
150 x 20
Gable
17
Pnssihle storage t3)
Rn x 2n
(largest)
Hip
18
Possible barracks (2)
160 x 40
Gable
19
Possible support
110 x 100
(80 x 25 extension)
Varies
20
Administration
315 x 70
Hip
21
Possible storage
11O x 55
Gable
22
Possible storage
95 x 40
Gable
23
Messhall
75 x 45
(45 x 35 extension)
Gable
24
Possible support
35 x 35
Flat
25
Possible support
75 x 45
Gable
26
Possible support/storage
150 x 50
Gable
27
Possible support/storage
155 x 30
Gable
28
Possible support/storage
155 x 30
Gable
29
Probable storage
185 x 20
Gable
30
Possible barracks (2)
115 x 30
Gable
31
Possible barracks
125 x 20
Gable
32
Operations/support
85 x 20
Flat
33
Operations/support
115 x 35
Flat
34
Mounded structures (2)
15 ft entrances
Approved Frl~fr4~e1e 1~2 O/ J4 -~N~ M 4? 819 DDOaI~@p
The only changes noted during the 3-month structures (Item 34, Figure 2), and the camou-
Approved For Relea MWQ4M~ar (#- 7PA9449 ?}PP010QQ#Tk of the western AAA site. Table 1 lists
under construction in the southwestern sector, the vessels observed at the base on the missions
an improved road in the area of the mounded indicated.
E RET No Forei n Dissem
25X1 C 25X1 C
AMS. Series L-500, Sheet NE 49-2, 1st ed, Jul 56 (Unclassified)
REQUIREMENT
NSCID 72-6
NPIC PROJECT
11224/6
Approved For Release 2000/04/17 : CIA-RDP78BO456OA005100010004-8
Approved For Release 2000/04/17 : CIA-RDP78BO456OA005100010004-8
25X1C
Approved For Release 2000/04/17 : CIA-RDP78BO456OA005100010004-8