SOUTHEAST ASIA ACTIVITY REPORT SELECTED TRANSPORTATION AND INFILTRATION COMPEDIUM 25-31 AUGUST 1966
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04560A005600010006-1
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
22
Document Creation Date:
December 28, 2016
Document Release Date:
February 10, 2005
Sequence Number:
6
Case Number:
Publication Date:
September 1, 1966
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 2.97 MB |
Body:
,,,,C rftelease 2005/04/28 : CIA-RDP78B04560A005600010006-1
PHOTOGRAPHIC IN'li P ETAT~ tE "`T
25X1 C
SELECTED TRANSPORTATION
AND INFILTRATION
25-31 AUGUST 1966
Declass Review By NIMA/DOD
25X1 C
N P I C/ R-309/66
SEPTEMBER 1966
GROUP 1 EXCLUDED FROM
AUTOMATIC DOWNGRADING
AND DECLASSIFICATION
Approved For F I "[;E ' 8 : CIA-RDP78BO456OA005
Approved For Release 2005/04/28 : CIA-RDP78BO456OA005600010006-1
WARNING
This, document. contains information affecting
the rational defense of the United States,
within the meaning of Tittle 18, sections
793 and '794, of the U.S. Code, as amended.
Its t:_ransmission or revelation of its contents
to o receipt by an unauthorized person is
proh:ihited by law.
Approved For Release 2005/04/28 : CIA-RDP78BO456OA005600010006-1
Approved For Release 2005/04/28 : CIA-RDP78BO456OA005600010006-1
Next 1 Page(s) In Document Exempt
Approved For Release 2005/04/28 : CIA-RDP78BO456OA005600010006-1
Approved For Release 200(/@0i[1N-T41L78B04560A005600010006-1 R-309/66
25X1 C
PREFACE
This report is a summary of selected information on
transportation and infiltration activity in Southeast Asia,
primarily the Laotian Panhandle, as reported by NPIC
during the period indicated on the cover. For a compre-
hensive study of road development in this area prior to
1 April 1966 see NPIC R-110/66, Communist Road Net
Development in the Laotian Panhandle (CONFIDENTIAL/
25X1 C
Items are numbered and arranged according to location
from north to south. Annotated maps of varying scales
have been included to assist the reader in locating the items.
Each large-scale map depicts all motorable roads photo-
graphically confirmed by NPIC, unless otherwise indicated.
Missions, mission dates, frames, and NPIC cable and
briefing board references are listed after each item, as
appropriate.
25X1 C
Approved For Release 200t1 l D N- 78B04560A005600010006-1
Approved For Release 2Q
E Rf ffAeP78B04560A005600010006-1309 "66
1. Railroad Construction, Thanh Hoa/Vinh Rail Line, North Vietnam
2. Vehicular Cable Bridge Under Construction, Route 1A, North
Vietnam
3. Probable Water-to-rail Transshipment Point, Vinh/Dong Hoi
Rail Line, North Vietnam
Li. Truck Park, Route 15, North Vietnam
5. Road Activity, Route 108, North Vietnam
6. Telecommunication Poles, Route 1A, North Vietnam
Page 2
25X1 C
Approved For Release 2gA6Q jb ERip-1XTP78B0456OA005600010006-1
T H A
Muang Nakhon Sawan
Nakhon
Ratchasima
Mang Khon Kaen
L A N D
Nong Khai
"Warin \
Chamrap;
Lon
Xuyen - _
S; Sec
Vinh
Loi(
Lang Son
Thai Ng en
11A N01
ai Phong
Approved For
C H I N
INDOCHINA
National capital
-??~ International boundary
Railroad
Road
0 50 140 150 Miles
0 50 100 150 Kilometers
CONFIDENTIAL
Huang-liu* \,.
AREA'0Pe6V d" p`oPUI b7&;We 2005/0412to~ f-1NR f 1560A005600010006-1
25X1 C
25X1 C
25X1 C
920
MUONG NONG
- 16 OO 1
PROVISIONAL MILITARY LINE
OF DEMARCATION 1954
CHAVANE
165
SOUTH
VIETNAM
---- Communist roads in disuse
Other motorable roads
---- Oiher roadsAroved For Rele'
28 : CIA-R
CONFID
LAOTIAN PANHANDLE
25X1 C
NPIC L-5317 (8/66)
Page 5
Approved For Release 206 F P78BO456OA005600010006-1 n-.J ua i bb
25X1 C
1. Railroad Construction, Thanh Hoa/Vinh Rail Line, North Vietnam
A railroad by-pass is under construction around the damaged Thien .Link
Dong Railroad Siding on the Thanh Hoa/Vinh Rail Line.
The by-pass railbed extends east from the main line at UTM WG746804, then
south to rejoin the main line at UTM WG745798. A rail spur under construc-
tion extends east from the by-pass at UTM WG7468ol to the probable site of
a water-to-rail transshipment point on the southeast bank of the Huang
Giang (river) at UTM WG752802. Some ties, but no rails, have been laid on
the by-pass and the spur (Figure 1). An additional rail spur in the early
stage of construction extends northwest from the main line at UTM WG746808
to approximately UTM WG737813.
I
NPIC Mole Ulte 0244, s 2bOl2bZ, Aug
66
Approved For Release 2TIM
E Nlf1- P78B04560A005600010006-1
Niem
Nhasr %' L6c aTrarh
Trinh Kh et
nq Cao
Tri c Doan
Long .t/a6-__ r-
Lac Nham
Nhii,ni Then
9pnred'Fpr a ease
goS(:UY&r
'ROUTE I
5, ..horn Dai
;=nl Thircrng
an''q l o
ng Bahgj T ri
:.:
Approve
~au Yen
Pang inh
I D669 Xa ?
Kha L6i
Nna i.oo
Qu 'n Tri
-hua' Bdh
Thar r Cat
ong LTinh,'
i hu?ce r~ t_au Mao
Th$nh Ha 6F,
:..on Sam
ONFJ
- 86
Ir Knd Lc i DKing
I
1~anh Thap
YenCanh
83--
offing S,on
TIAL
NORTH;;
VIETNAM
cf ieu Thu?ohgv.
fang Lap D . rung
Sd'n Lu &ng
--82-
Lit Binh
in Mop Yen Bi h
,RAI!ROAD SPUR
rlt R FQNSTRUCjTI.ON
Thien L foal
Tho goa
~(wou Q7, I...;
T n *P~h on g
. ~, Phu
Nhan !Nhcrong
Yen Nong
L;&u T6 on
g Tue
ai
EN THAN
Jhai ~fi Due
45
kA ROAD BY-PASS.-AND SPU
NDER CONSITRUCTION
Loc Lo
The Trun
Ngnc Thep
o Hau` k
56 i DOnCg-_-~
X~an BApg
Thach% Tha
Mai Chic
vien D~
N* Do'l
+ .D ong en
n Linh `?Do""nl
Trinh Doai
,i.
oc Xa
Bai A6n
uang Min
R 309 f 6
Tru n g";
:.. Dong Ca
e
Hirt
se 200 /04r,lfj~~
Ph M n
van Nha"rn
r Ifi ,? RI ES L701
S lEEj6170,111_j?_
Kim C?'Ut3t ~ orhvwv,ey~ne?u
Xuan Ban
SCAL 1 50000
a am
u
Dong
~jE00456~A056dQ0 0006-i I
1 __._.. P'ae7
. Dong Qua n Y.
X1'
25X1 D
Approved
PROBABLE SITE OF M
TRANSSHIPMENT POINT
WIF
FIGURE 7. RAILROAD CONSTRUCTION, THANH HOA/VINH RAIL LINE, NORTH VIETNAM
Page 9
Approved For Release 200'.1Q1 lMXTZb78B04560A005600010006-1
25X1 C
25X1 C
Approved For Release 2060 ?ENTIJP78B04560A005600010006-1 R-309/66
25X1 C
2. Vehicular Cable Bridge Under Construction, Route 1A, North Vietnam
A vehicular cable bridge is under construction at the destroyed Ha
Tinh Highway Bridge West over the Song Chau Lam on 25X1A
Route 1A at 18-21N 105-52E (UTN[WF92130L+). The ca le anchorages are
uncovered and are probably inccmplete (Figure 2). A total of 27 vehicular
and railroad cable bridges has been identified or confirmed by NPIC to date.
3. Probable Water-to-rail Transshipment Point, Vinh/Dong Hoi Rail Line,
North Vietnam
A rail spur extends northeast from the Vinh/Dong Hoi Rail Line at
18-l7N 105-38E (UTM WF680214) to a probable water-to-rail transshipment
point at the confluence of the Rao No and the Ngan Sau'Giang (rivers) at
UTM WF685218. Track activity extends from the end of the spur to the river.
No river craft or open storage is observed in the area.
ai,iu a e uite , LYIU Z, Aug 66
Approved For Release let p,ZE AJDP78B04560A005600010006-1
NYss1,f Abri _
a Co /Abri
n Th'uy
rt\Uzu
Dn?
~~