SOUTHEAST ASIA ACTIVITY REPORT SELECTED TRANSPORTATION AND INFILTRATION COMPENDIUM

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04560A006200010008-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
22
Document Creation Date: 
December 28, 2016
Document Release Date: 
February 9, 2000
Sequence Number: 
8
Case Number: 
Publication Date: 
January 1, 1968
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78B04560A006200010008-2.pdf7.97 MB
Body: 
NO FOh t N'U6SEM V 0/06/30 : CIA-RDP78BO456OA006200010008-2 25X1C PHOTOGRAPHIC INTERI RETATIbr REPORT SOUTHEAST ASIA ACTIVITY REPORT SELECTED TRANSPORTATION AND INFILTRATION COMPENDIUM CHANGES IN NORTH VIETNAM ELECTRIC POWER FACILITIES GROUP 7 EXCLUDED FROM AUTOMATIC DOWNGRADING AND DECLASSIFICATION Approved For RlE1000/06/30: CIA-RDP78B NO FOREIGN DISSEM 25X1 C Approved For Release 2000/06/30 : CIA-RDP78BO456OA006200010008-2 This document contains information affecting the national defense of the United States, within the meaning of Title 18, sections 793 and 794, of the U.S. Code, as amended. Its transmission or revelation of its contents to or receipt by an unauthorized person is prohibited by law. Approved For Release 2000/06/30 : CIA-RDP78BO456OA006200010008-2 :UT TO :OPIES BUT TO ZOPIE .CUT TO COPIES 25X1 C Approved For Release 2000/06/30 : CIA-RDP78BO456OA006200010008-2 Approved For Release 2000/06/30 : CIA-RDP78BO456OA006200010008-2 N PIC/R-7/68 Approved For Release 2000/961JJ-:'CIA-RDP78B0456OA006200010008-2 NO FOREIGN DISSEM 25X1 C PREFACE This report is a summary of selected information on transportation and infiltration activity in southeast Asia as reported by NPIC during the period indicated on the cover. Those lines of communication and associ- ated facilities which support communist insurgency in Laos and South Vietnam are emphasized. Items are numbered and arranged according to location from north to south. Annotated maps of varying scales have been included to assist the reader in locating the items. Each large-scale map depicts all motorable roads photographically confirmed by NPIC unless otherwise in- dicated. Missions, mission dates, frames, and NPIC cable and briefing board references are listed after each item, as appropriate. Approved For Release 2000E 2MMT CIA-RDP78BO456OA006200010008-2 NO FOREIGN DISSEM 25X1 C N PIC/R-7/68 Approved For Release 2000/06/30 :U1 bP78B04560A006200010008-2 NO FOREIGN DISSEM 25X1 C Changes in North Vietnam Electric Power Facilities Significant changes have occurred in the electric power producing and transforming facilities of North Vietnam as a direct result of the expansion and increased effectiveness of airstrikes. Major 110 kv substations are now inoperative, thermal powerplants are being modified, and diesel electric powerplants have been recently constructed. The result is a virtual abandonment of the sophisticated electric power grid (EPG) as originally conceived and a concerted effort to maintain power production for local consumption. Four of the six major 110 kv substations are inoperative due to the destruction and/or removal of their transformers: Ha Noi Transformer 5X1A Substation Dong Anh (Figure 2); Ha Dong Transformer 5X1A Substation, (Figure 3); Hai Phong Transformer Substation, 2 X1A (Figure 4+); and Cam Pha Transformer Substation Mong 2 X1A Duong, (Figure 5). In addition, the control building has 2 X1A been partially dismantled at Nam Dinh Transformer Substation, 25X1A ear abandoned (compare llations a st i 6) All fi Fi pp ve n a . gure pages D1O thru D21, NPIC/R-1)+667 Southeast Asia Activity Report, Electric 2 X1C Power Facilities, North Vietnam, Oct 7, SECRET NO FOREIGN DISSEM EXCEPT The abandonment of the substations is probably a direct result of effective airstrikes against the powerplants and the resulting reduction in high voltage transmission capacity. The transformers removed from the substations could either be stored for the future reconstruction of the EPG or relocated at existing powerplants. Even those powerplants still in operation are undergoing major modifications to reduce the vulnerability of critical components and to maintain serviceability in spite of airstrikes. Transformers have been relocated in deep, reinforced holes outside the installation perimeter at the following: Uong Bi Thermal Electric Powerplant, (Figures 7 & 8); Bac Giang Thermal Electric Powerplant, (Figures 9 & 10); Thai Nguyen Thermal Electric Powerplant, (Figure 11); Thanh Hoa Thermal Electric Powerplant, (Figure 12); and Ban Thach Hydroelectric Powerplant, 25X1A 2 25X1A The powerplant waste disposal system is being modified to accommodate both fly ash (sludge) and gaseous materials in a single underground conduit, thereby eliminating the requirement for a main stack. This innovation was confirmed at Uong Bi where the flue extensions by-pass the destroyed stack and connect with a partially underground conduit terminating at the fly ash disposal area (Figure 8). 25X1A 25X1A Approved For Release 2000/06/30 : gftlgpP78B04560A006200010008-2 NO FOREIGN DISSEM 25X1 C N PIC/R-7/68 Approved For Release 20009 T CIA-RDP78BO456OA006200010008-2 NO FOREIGN DISSEM EXCEPT 25X1 C CHINA Dien Bien Ph u (FIGS. 9, 10, 14L n Lang N uyen (FIG. 5) (FIG. 13) I G. 2) (FIG. 3) ,.. Sorsg Pn6 ~FIG.4) ac Gi ng . 18) Thai Binh e1 Dinh (6dS. 7 (FIGS. 15 -17) GULF 0 F TONKIN TH A I L- A N I5 sTHE tMAL!HYD O PO ERPLANT Ef = bIE E.L POWERPLAi T ? r TIOhkaz ong Hoi h Linh SOUTH 'kP'IC M1273 VI?TNA Approved For Release 2000/ ~RE-PIA-RDP78B04560A006200010008-2 NO FOREIGN DISSEM 25X1 C NPIC/R-7/68 Approved For Release 20 T 60A006200010008-2 NO FOREIGN DISSEM 25X1 C 11jf A similar disposal system was probably constructed at the Viet Tr-i_ 25X1A Thermal Electric Powerplant, Although the stack remain; undamaged, a newly constructed conduit extends from the main flee near it,; entrance into the stack and follows the alignment of the previously existing fly ash disposal line (Figure l3). Construction of an underground conduit was begun at Thanh Hoa after airstrikes against that insta!_lation. leis conduit also appears to e:xtenbi from the flue system and by-pass the stack (Figure 12). Unlike those at Uong Bi and Viet Tri, it does not coincide with the previously existing fly ash disposal line. It may therefore have been intended to function only as a horizontal flue for the discharge at gaseous materiaas and not as a combined waste disposal line. Gaseous wastes and/or steam have been observed rising from two above- ground pipes at Bac Giang (Figure li). These pipes, extending from the area of the stack flues, may also be serving as horizontal flues. In an apparent attempt to offset the -cower lost from the inoperative thermal powerplants, the North Vietnamese have been constructing diesel- electric powerplants since early lyrd7 (see Section C, NPIC/R-146/67). Although these facilities are difficult to detect due to their compact nature, various combinations of identifiable features are present at (_,act (see Figure 18). Figures 15, 16 and 1'; demonstrate the relatively short time span required for construction. The photo below is included as en example of the diesel engines currently Jr use in North Vietnam. FIGURE 1. TYPICAL DIESEL ENGINE, NORTH VIETNAM Page 5 Approved For Release 2000/06 R.fITIA-RDP78B04560A006200010008-2 NO FOREIGN DISSEM 25X1 C Approved For Release 2000/06/30 : CSFAP78B04560A006200010008-i R -7 68 NO FOREIGN DISSEM 25X1 C I-IGURE 2. HA NOl TRANSFGRMFF' Sh RSTATION, f.)( 4NH NC~RT VIFTNAO Approved For Release 2000/06/30 , Iff~DP78B04560A006200010008-2 NO FORFlrra DISSEM 25X1 C NPIC.: R-7,68 Approved For Release 2000AWTCIA-RDP78BO456OA006200010008-2 NO FOREIGN DISSEM 25X1 C 25X1 D FIGURE 3. HA DONG TRANSFORMER SUBSTATION, NORTH VIETNAM ,'age 7 Approved For Release 2000/0$ERECIA-RDP78BO456OA006200010008-2 NO FOREIGN DISSEM 25X1 C 19~IC/R-i '68 Approved For Release 2000/06/30 '~ I DP78BO456OA006200010008-2 NO FOREIGN DISSEM 25X1 C KINIMPAIMMIM. FIGURE 42 A1 PRONG TRANSFORMER S(;FSTATI' ^1, NORTH VIETNAM Approved For Release 2000/06/3Ql'g kTRDP78B04560A006200010008-2 NO FOREIGN DISSEM 25X1 C NPICiR-7!68 Approved For Release 2000 CAbT CIA-RDP78BO456OA006200010008-2 NO FOREIGN DISSEM 25X1 C 'DESTROYED CONTROL BUILDING FIGURE 5. CA;5RHIRRAN.SFORMER SUBSTATION, MONG DUONG, NORTH VIETNAM Page 9 Approved For Release 2000/q QE:TCIA-RDP78BO456OA006200010008-2 NO FOREIGN DISSEM 25X1 C A''!''7 68 Approved For Release 2000/06/30 : 1I I)P78BO456OA006200010008-2 NO FOREIGN DISSEM 25X1 C 25X1 D 25X1 D rrr r'RAV'-c-(ipNFi. H )NG BI k -A, NORTH VIETNAM I %1 Approved For Release 2000/06/30 t)Fj9DP78BO456OA006200010008-2 25X1 C N PIC/R-7i/68 Approved For Release 2000 1NT CIA-RDP78BO456OA006200010008-2 NO FOREIGN DISSEM 25X1 C COMBINATION WASTE DISPOSAL CONDUIT 1001t TRANSFORMERS REMAIN 4+r[ TRANSFORMERS REMOVED (SEE FIG. 7) 25X1 D FIGURE 8. UONG BI THERMAL ELECTRIC POWERPLANT, NORTH VIETNAM Page 11 Approved For Release 2000/06W.[-CIA-RDP78BO456OA006200010008-2 NO FOREIGN DISSEM 25X1 C Approved For Release 2000/06/30 : . P78B04560A0062000100 c'2~R l 68 NO FO HHGN DISSEM 25X1 C 25X1 D 25X1 D n r FU TRAM' FOFMFr, f3AC G.A .AREA, NORTH VIETNAM Approved For Release 2000/06/30 PIDP78B04560A006200010008-2 ~~~ ~~RER ' GISSFM 25X1 C Approved For Release 2000/0 NO FOREIGN DISSEM " TRANSFORMER REMOVED v w-* TRANSFORMER REMAINS 25X1 D 35 KV LINES miiiiiii~ lmmm~ '4 '!C na i z. an Approved For Release 2000/06/305 [ lRDP78B04560A006200010008-2 NO FOREIGN DISSEM 25X1 C 00R??8010008-2 RELOCATED TRANSFORME Approved For Release 2000/0 NO FOREIGN DISSEM E CONDUIT UNDER CONSTRUCTION 25X1 D 06200010008-2 25X1 C Approved For Release 2000/06/?Q(1 '1-fk-RDP78B04560A006200010008-2 NO FOREIGN DIS)EM 25X1 C 25X1 D 25X1 D Approved For Release 2000/06/30 : CIA-RDP78BO456OA006200010008-2 SECRET FLYASH DISPOSAL AREA 25X1 C 'EPIC M-i2F6 SECRET Approved For Release 20b0/ 06b008-2 Approved For Release 2000/06/30 : CIA-RDP78B0446.0A006200010008-2 25X1 C 25X1 D FIGURE 74. BAC GIANG THERVAL ELECTRIC -OWERPLANT, NORTH VIET NAiMM 25X1 D 25X1 D ET~'-'iC L Wr_Pn_ Approved For Release 2000/06/30 25X1 C NPIC/R-7/68 Approved For ReSkiK2000/06/30 : CIA-RDP78BO456OA006200010008-2 NO FOREIGN DISSEM 25X1 C 25X1 D r 9 C nn - za NEW NPI 25X1 D l ? FIGURE 16. HAI PHONG DIESEL ELECTRIC POWERPLANT AUX 4 UNDER CONSTRUCTION (MID-STAGE), 25X1 D 25X1 DFIGURE 17. HAI PHONG DIESEL-ELECTRIC POWERPLANT AUX 4, NORTH VIETNAM Approved For RelegE( p0/06/30 : CIA-RDP78BO456OA006200010008-2 NO FOREIGN DISSEM 25X1 C Approved For Release 2000/06/30 : CIA-RDP78BQ4 gAO06200010008-2 NPic!R.r, NO FOREIGN DIS EM 25X1 C 25X1 D Approved For Release 2000/06/30 : CIA-RDP pB;p4f60AO06200010008-2 N~ `~'?F`-!;N ,:SAM 25X1C Approved For Release 2000/06/36E iTRDP78B04560A006200010008-2 NO FOREIGN DISSEM 25X1 C Approved For Release 2000/06/3,C-RDP78B04560A006200010008-2 NO FOREIGN DISSEM 25X1 C