SOUTHEAST ASIA ACTIVITY REPORT SELECTED TRANSPORTATION AND INFILTRATION COMPENDIUM NORTH VIETNAM/CHINA ROAD NETWORK UNDER CONSTRUCTION

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04560A006200010021-7
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
18
Document Creation Date: 
December 28, 2016
Document Release Date: 
February 10, 2000
Sequence Number: 
21
Case Number: 
Publication Date: 
February 1, 1968
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78B04560A006200010021-7.pdf6.54 MB
Body: 
Appppr elease 2000/06/30: CIA-RDP78B04560A006200010021-7 NO FOREIGN [5ISSEM 25X1., . ,, SOUTHEAST ASIA ACTIVITY REPORT SELECTED TRANSPORTATION AND INFILTRATION COMPENDIUM NORTH VIETNAM/CHINA ROAD NETWORK UNDER CONSTRUCTION Approved For Relea5? "6/30: CIA-RDP78BO456OA006 NO FOREIGN DISSEM 25X1 C N P I C/ R-23/ 68 FEBRUARY 1968 GROUP 1 EXCLUDED FROM AUTOMATIC DOWNGRADING AND DECLASSIFICATION Approved For Release 2000/06/30 : CIA-RDP78BO456OA006200010021-7 This document contains information affecting the national defense of the United States, within the meaning of Title 18, sections 793 and 794, of the U.S. Code, as amended. Its transmission or revelation of its contents to or receipt by an unauthorized person is prohibited by law. Approved For Release 2000/06/30 : CIA-RDP78BO456OA006200010021-7 Approved For Release 2000/06/3S:E RUDP78BO456OA006200010021-7 NPIC/R-23/68 PREFACE This report is a summary of selected information on transportation and infiltration activity in southeast Asia as reported by NPIC during the period indicated on the cover. Those lines of communication and associ- ated facilities which support communist insurgency in Laos and South Vietnam are emphasized. Items are numbered and arranged according to location from north to south. Annotated maps of varying scales have been included to assist the reader in locating the items. Each large-scale map depicts all motorable roads photographically confirmed by NPIC unless otherwise in- dicated. Missions, mission dates, frames, and NPIC cable and briefing board references are listed after each item, as appropriate. Approved For Release 2000/06/30 : Cl NO FOREIGN DISSEM TB04560A006200010021-7 25X1 C 2X1D Approved For Release 2000/06/30 : CIA-RD.9f @RgP60A006200010021-7 NO FOREIGN DISSEM 25X1 C North Vietnam/China Road Network Under Construction Construction is nearing completion on the North Vietnam/China Road Network which will connect the road and rail systems in southern China with the Hon Gai/Hai Phong area of North Vietnam. Final grading of North Vietnam Route 415 has been extended to the China border since and continuous road construction is now discernible in China to the 25X1D limit of photographic coverage (see maps and photos on pages 3, 4, and 5). Although segments of Route 415 remain limited to a single-lane capability, the entire network of newly constructed roads in North Vietnam is serviceable from the China border to the junction with Route 18, 6 nm west of Hon Gal Nine bridges have been completed along that segment of Route 13B included in the network since its construction status was reported last - (compare Figure 4 with Figure 12, Summary No. 62). All road segments under construction at that time have also been completed (compare Figure 6 with Figure 16, Summary No. 62). Althou h a new POL drum storage area was identified on photography of Fi ure construction support facilities along this route appear 5), most of the 25X1D abandoned. South from Route 13B, the network utilizes newly constructed segments of Routes 184, 183 and 1805, and the new Route 1830. All of this road construction -- including bridges -- has been recently completed. The alignment is presented on page 9 and Figures 7 through 14 depict selected segments of the new roads. A further expansion of the network is currently underway and will provide an east-west alternate to Route 18 into the Ha Noi area. The previously existing serviceable segments of Route 183 between the junction with Route 184 (Figure 11) and 21-06-0 106-35-Mare being widened and improved with connecting segments under construction. Intermittent road construction continues west from Route 183, paralleling Route 18, to 21-08-.M l06-29-M 25X1 D 25X1 D 25X1 D 25X1 D Approved For Release 2000/06/30: ClAqRW"04560A006200010021-7 NO FOREIGN DISSEM 25X1 C RECORD COPY NO. PUB. DATE LOCATION MASTER DATE RECEIVED LOCATION COPY Approves g$?r,Re1ease i2GOO/06/30: CIA-RD 560A006: 1 0016'021-7 MAXIMUM CUT TO 2 5 DATE 7 - 7 0 I I CCUT TO OPIES DATE COPIES DESTROYED COPIES COPIES 10 CUT TO DATE w 2 DATE 74 CUT TO COPIES MASTER DATE DATE COPIES 0 7- NUMBER OF COPIES DATE NUMBER OF COPIES DATE RECEIVED OR ISSUED S'D BAL I RECEIVED OR ISSUED RECD ISS'D BAL MO. DAY YR. RECD S MO. DAY YR. Unit t i 68 51 51 2 s . D S t ry Al P t L ve or a ease 2000/ 6/30 CIA- DP7 8 04 60A 06 000100212ZX1 C .Z4-444 TITLE NPIC r.~ /Z-'Q wp_ lg68 N -- DATE NUMBER OF COPIES DATE RECEIVED OR ISSUED NUMBER OF COPIES M O . D A Y Y R . F t D I55 D B RECEIVED OR ISSUED Approved For Releas AL MO. - DAY YR . ~O6266099~ RECD I S S D SAL 25X1 C Approved For Relea e 20 0/06/ 0 : - - ITLE NPI R-2 /68 Feh_ 1QcS Approved For Release 2000/06/30 : CIA-RDP78BO456OA006200010021-7 LANG SON KUAU Nt I WUKK U, C. ADDITIONAL CONSTRUCTION BRIDGE C C loFcTd 15c8lJLease 2000/06/30 : CIA-RDP78B 25X1 D ACIC SERIES (JOG) 1501 AIR SHEETS NF 48-12 & NF 48-16 2ND EDITION 1967. EDITION 1 1965 0A006200010021-7 SCALE 1:250,000 SECRET Approved For Relea(j@MIB19SE 25X1 C A FIGURE 1. NORTH VIETNAM/CHINA ROAD NETWORK UNDER CONSTRUCTION FIGURE 2. NORTH VIETNAM/CHINA ROAD NETWORK UNDER CONSTRUCTION SECRET Approved For Release 20 fMfM: -- 25X1 C Approved For Release 2000/06/30 : CIA-RDP78B04560A006200010021-7 on= NOR RVIETNAM gffwmgm~ i rig ~~YT~S~n~S:= Approved For Release 2000/06/30: CIA-RDP78B(9'4'6'6bAO062 kdv SECRET Approved For ReleasdNhWdf 3W 725X1 C Approved For Release 2000/06/30 : CIA-P~ff c4560A006200010021-7 Approved For Release 2000/06/30 : CIA5RDPYU04560A006200010021-7 NO FOREIGN DISSEM 25X1 C ROUTE 13B Approved For Release 2000/06/30 : CIASEI T304560A006200010021-7 NO FOREIGN DISSEM 25X1 C Approved For Release 2000/06/30 : C&OH8B04560A006200010021-7 NPIC/R-23/68 NO FOREIGN DISSEM 25X1 C SERVICEABLE CABLE BRIDGE PERMANENT BRIDGE 'APPROACHES U/CI m,. Page 8 Approved For Release 2000/06/30 : CI&1304560A006200010021-7 NO FOREIGN DISSEM 25X1 C 0: CIA=RDP78B04560A006 2000:1:0021-7 CAMOUFLAGED BRIDGE (FIG. 10) PROBABLE CONSTRUCTION FACILITIES (FIG. 12) ROUTE 18 BRI[St;E ~~:~ :r Release 20 Approved For Release 2000/06/30 : CIA-RDP78BO456OA006200010021-7 lim SECRET SECRET RTH VIETNAM CHINA ROAD NETWORK UNDER CONSTRUCTION Approved For Release 2000/06/30 : CIA-RDP78BO456OA006200010021-7 ....LC Ill T R9804560A006200010021-7 'N 23/68 Approved For Release 2000/06/30 : CIA NO FOREIGN DISSEM 25X1 C ROUTE ACTIVE FORD 7 mw CAMOUFLAGED BRIDGE rt#Mp vRT (CONSTRUCTED FIGURE 11. NORTH VIETNAM, CHINA ROAD NETWORK UNDER CONSTRUCTION FIGURE 70. NORTH VIETNAM/CHINA ROAD NETWORK UNDER CONSTRUCTION Approved For Release 2000/06/30 : c - R 8B04560A006200010021-7 NO FOREIGN DISSEM 25X1 C Approved For Release 2000/06/30 : c j, P178B04560A006200010021-7 NO FOREIGN DISSEM 25X1 C F!t;(~l?r_ 1-~ `V!)R IH VI- HAM CHliv~? QA) ~?it "LURK f Approved For Release 2000/06/30 : CIA-FWP T04560A006200010021-7 N ; FORE!Gt-i C ISSEM 25X1 C Approved For Release 2000/06/30 : 5 i F8B04560A006200010021-7 NI( k 23/68 NO FOREIGN DISSEM 25X1 C ROUTE 1 momm NPIC M1' FIGURE 74. NORTH VIETNAM/CHINA ROAD NETWORK UNDER CONSTRUCTION Kane 13 Approved For Release 2000/06/30 : CI&[R6REETB04560A006200010021-7 NO FOREIGN DISSEM 25X1 C Approved For Release 2000/06/30: C@MQ r8B04560A006200010021-7 NO FOREIGN DISSEM 25X1 C Approved For Release 2000/06/30 : C tRtJ6B04560A006200010021-7