SOUTHEAST ASIA ACTIVITY REPORT SELECTED TRANSPORTATION AND INFILTRATION COMPENDIUM NORTH VIETNAM/CHINA ROAD NETWORK UNDER CONSTRUCTION
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04560A006200010021-7
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
18
Document Creation Date:
December 28, 2016
Document Release Date:
February 10, 2000
Sequence Number:
21
Case Number:
Publication Date:
February 1, 1968
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 6.54 MB |
Body:
Appppr
elease 2000/06/30: CIA-RDP78B04560A006200010021-7
NO FOREIGN [5ISSEM
25X1., . ,,
SOUTHEAST ASIA
ACTIVITY REPORT
SELECTED TRANSPORTATION
AND INFILTRATION
COMPENDIUM
NORTH VIETNAM/CHINA
ROAD NETWORK UNDER CONSTRUCTION
Approved For Relea5? "6/30: CIA-RDP78BO456OA006
NO FOREIGN DISSEM 25X1 C
N P I C/ R-23/ 68
FEBRUARY 1968
GROUP 1 EXCLUDED FROM
AUTOMATIC DOWNGRADING
AND DECLASSIFICATION
Approved For Release 2000/06/30 : CIA-RDP78BO456OA006200010021-7
This document contains information affecting
the national defense of the United States,
within the meaning of Title 18, sections
793 and 794, of the U.S. Code, as amended.
Its transmission or revelation of its contents
to or receipt by an unauthorized person is
prohibited by law.
Approved For Release 2000/06/30 : CIA-RDP78BO456OA006200010021-7
Approved For Release 2000/06/3S:E RUDP78BO456OA006200010021-7 NPIC/R-23/68
PREFACE
This report is a summary of selected information
on transportation and infiltration activity in southeast
Asia as reported by NPIC during the period indicated
on the cover. Those lines of communication and associ-
ated facilities which support communist insurgency in
Laos and South Vietnam are emphasized.
Items are numbered and arranged according to location
from north to south. Annotated maps of varying scales
have been included to assist the reader in locating the
items. Each large-scale map depicts all motorable roads
photographically confirmed by NPIC unless otherwise in-
dicated.
Missions, mission dates, frames, and NPIC cable
and briefing board references are listed after each item,
as appropriate.
Approved For Release 2000/06/30 : Cl
NO FOREIGN DISSEM
TB04560A006200010021-7
25X1 C
2X1D
Approved For Release 2000/06/30 : CIA-RD.9f @RgP60A006200010021-7
NO FOREIGN DISSEM 25X1 C
North Vietnam/China Road Network Under Construction
Construction is nearing completion on the North Vietnam/China Road
Network which will connect the road and rail systems in southern China
with the Hon Gai/Hai Phong area of North Vietnam. Final grading of North
Vietnam Route 415 has been extended to the China border since
and continuous road construction is now discernible in China to the 25X1D
limit of photographic coverage (see maps and photos on pages 3, 4, and 5).
Although segments of Route 415 remain limited to a single-lane capability,
the entire network of newly constructed roads in North Vietnam is
serviceable from the China border to the junction with Route 18, 6 nm
west of Hon Gal
Nine bridges have been completed along that segment of Route 13B
included in the network since its construction status was reported last
- (compare Figure 4 with Figure 12, Summary No. 62). All road
segments under construction at that time have also been completed (compare
Figure 6 with Figure 16, Summary No. 62). Althou h a new POL drum storage
area was identified on photography of Fi ure
construction support facilities along this route appear 5), most of the 25X1D
abandoned.
South from Route 13B, the network utilizes newly constructed segments
of Routes 184, 183 and 1805, and the new Route 1830. All of this road
construction -- including bridges -- has been recently completed. The
alignment is presented on page 9 and Figures 7 through 14 depict selected
segments of the new roads.
A further expansion of the network is currently underway and will
provide an east-west alternate to Route 18 into the Ha Noi area. The
previously existing serviceable segments of Route 183 between the junction
with Route 184 (Figure 11) and 21-06-0 106-35-Mare being widened and
improved with connecting segments under construction. Intermittent road
construction continues west from Route 183, paralleling Route 18, to
21-08-.M l06-29-M 25X1 D 25X1 D
25X1 D 25X1 D
Approved For Release 2000/06/30: ClAqRW"04560A006200010021-7
NO FOREIGN DISSEM 25X1 C
RECORD
COPY NO.
PUB. DATE
LOCATION
MASTER
DATE RECEIVED
LOCATION
COPY
Approves g$?r,Re1ease i2GOO/06/30: CIA-RD
560A006:
1
0016'021-7
MAXIMUM
CUT TO 2 5
DATE 7 - 7 0
I I
CCUT TO OPIES
DATE
COPIES DESTROYED
COPIES
COPIES 10
CUT TO
DATE w 2
DATE
74
CUT TO
COPIES
MASTER
DATE
DATE
COPIES 0
7-
NUMBER OF COPIES
DATE
NUMBER OF COPIES
DATE
RECEIVED OR ISSUED
S'D BAL
I
RECEIVED OR ISSUED
RECD ISS'D
BAL
MO.
DAY YR.
RECD
S
MO.
DAY
YR.
Unit
t
i
68
51
51
2
s
.
D
S
t
ry Al P t L
ve or a ease 2000/
6/30 CIA-
DP7
8 04
60A 06
000100212ZX1 C .Z4-444
TITLE
NPIC
r.~ /Z-'Q wp_ lg68
N
--
DATE
NUMBER OF COPIES
DATE
RECEIVED OR ISSUED
NUMBER OF COPIES
M O .
D A Y
Y R .
F t D
I55 D
B
RECEIVED OR ISSUED
Approved For Releas
AL
MO.
-
DAY
YR
.
~O6266099~
RECD
I S S D
SAL
25X1 C
Approved For Relea
e 20
0/06/
0 :
-
-
ITLE NPI
R-2 /68 Feh_ 1QcS
Approved For Release 2000/06/30 : CIA-RDP78BO456OA006200010021-7
LANG SON
KUAU Nt I WUKK U, C.
ADDITIONAL CONSTRUCTION
BRIDGE C C loFcTd 15c8lJLease 2000/06/30 : CIA-RDP78B
25X1 D
ACIC SERIES (JOG) 1501 AIR
SHEETS NF 48-12 & NF 48-16
2ND EDITION 1967. EDITION 1 1965
0A006200010021-7 SCALE 1:250,000
SECRET
Approved For Relea(j@MIB19SE 25X1 C
A
FIGURE 1. NORTH VIETNAM/CHINA ROAD NETWORK UNDER CONSTRUCTION
FIGURE 2. NORTH VIETNAM/CHINA ROAD NETWORK UNDER CONSTRUCTION
SECRET
Approved For Release 20 fMfM: -- 25X1 C
Approved For Release 2000/06/30 : CIA-RDP78B04560A006200010021-7
on=
NOR
RVIETNAM
gffwmgm~
i rig ~~YT~S~n~S:=
Approved For Release 2000/06/30: CIA-RDP78B(9'4'6'6bAO062
kdv
SECRET
Approved For ReleasdNhWdf 3W 725X1 C
Approved For Release 2000/06/30 : CIA-P~ff c4560A006200010021-7
Approved For Release 2000/06/30 : CIA5RDPYU04560A006200010021-7
NO FOREIGN DISSEM 25X1 C
ROUTE 13B
Approved For Release 2000/06/30 : CIASEI T304560A006200010021-7
NO FOREIGN DISSEM 25X1 C
Approved For Release 2000/06/30 : C&OH8B04560A006200010021-7 NPIC/R-23/68
NO FOREIGN DISSEM 25X1 C
SERVICEABLE
CABLE BRIDGE
PERMANENT BRIDGE
'APPROACHES U/CI
m,.
Page 8
Approved For Release 2000/06/30 : CI&1304560A006200010021-7
NO FOREIGN DISSEM 25X1 C
0: CIA=RDP78B04560A006 2000:1:0021-7
CAMOUFLAGED BRIDGE
(FIG. 10)
PROBABLE CONSTRUCTION
FACILITIES (FIG. 12)
ROUTE 18
BRI[St;E ~~:~
:r Release 20
Approved For Release 2000/06/30 : CIA-RDP78BO456OA006200010021-7
lim
SECRET
SECRET
RTH VIETNAM CHINA ROAD NETWORK UNDER CONSTRUCTION
Approved For Release 2000/06/30 : CIA-RDP78BO456OA006200010021-7
....LC Ill T
R9804560A006200010021-7 'N 23/68
Approved For Release 2000/06/30 : CIA
NO FOREIGN DISSEM 25X1 C
ROUTE
ACTIVE FORD
7 mw
CAMOUFLAGED BRIDGE
rt#Mp vRT
(CONSTRUCTED
FIGURE 11. NORTH VIETNAM, CHINA ROAD NETWORK UNDER CONSTRUCTION
FIGURE 70. NORTH VIETNAM/CHINA ROAD NETWORK UNDER CONSTRUCTION
Approved For Release 2000/06/30 : c - R 8B04560A006200010021-7
NO FOREIGN DISSEM 25X1 C
Approved For Release 2000/06/30 : c j, P178B04560A006200010021-7
NO FOREIGN DISSEM 25X1 C
F!t;(~l?r_ 1-~ `V!)R IH VI- HAM CHliv~? QA) ~?it "LURK f
Approved For Release 2000/06/30 : CIA-FWP
T04560A006200010021-7
N ; FORE!Gt-i C ISSEM 25X1 C
Approved For Release 2000/06/30 : 5 i F8B04560A006200010021-7 NI( k 23/68
NO FOREIGN DISSEM 25X1 C
ROUTE 1
momm
NPIC M1'
FIGURE 74. NORTH VIETNAM/CHINA ROAD NETWORK UNDER CONSTRUCTION
Kane 13
Approved For Release 2000/06/30 : CI&[R6REETB04560A006200010021-7
NO FOREIGN DISSEM 25X1 C
Approved For Release 2000/06/30: C@MQ r8B04560A006200010021-7
NO FOREIGN DISSEM 25X1 C
Approved For Release 2000/06/30 : C tRtJ6B04560A006200010021-7