CONTRACT INSPECTION REPORT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A000100070017-2
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
16
Document Creation Date:
December 28, 2016
Document Release Date:
July 20, 2000
Sequence Number:
17
Case Number:
Publication Date:
November 3, 1964
Content Type:
FORM
File:
Attachment | Size |
---|---|
![]() | 653.5 KB |
Body:
Declass Review,
NIMA/DoD r,,;
~
4VIYIr(A~.i ~.~.
'^~? 25X1
CONTRACT INSPECTION REPORT
1
ENGINEERING SECTION~CB~PD~OL
INSPECTION REPORT N0. (If final, so state)
ESTIMATED COMPLETION DATE
NAME OF CONTRACTOR
25X1
TYPE OF COMMODITY OR 5ERVICE
em n vice
THE CONTRACTOR 15 ON SCHEDULE ~
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
~ HD
?
FUNDS .~ YES (, Ro IF ANSWER IS "NO" ADVISE REC?
vE$
OMMENOATION AND OR ACTION OF~SPONSORING OFFICE, ON
~
0~ 0
~
REVERSE HEREOF. IF KNOWN, INDICATE MAGNITUDE OF ADDi?
_
-
PER CENT OF WORK COMPLETED
TIONAL FUNDS INVOLVED.
HAS AN INTERIM REPORT. FINAL REPORT, PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
DURING THE PERIODi ? rES ~ Ro (If yes, give details on reverse side.)
Final Report received.
HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? ~ rE9 ? Ro
(If yes, indicate items, quantity, end cost on reverse aide.)
OVERALL PERFORMANCE OF CONTRACTOR
1. ^ OUTSTANDING 3. ? ABOVE AVERAGE 5. ~ BELOW AVERAGE ~~ ~ UNSATISFACTORY
2. a EXCELLENT 4. Q AVERAGE 8. ^ BARELY ADEQUATE
IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE. INDICATE REASONS ON
REVERSE SID.:.
RECOMMENDED ACTION
^ CONTINUE AS PROGRAMMED ^ WITHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
^ TERMINATE ~ OTHER (speclfy)Contract being settled.
IF TERMINATION IS RECOMMENDED OR IF THIS IS A F-I~NAL-REPORT ATTACH COMMENTS IN NARRATIVE FORM ON
CONThACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. i
THESE INCLUDE, WHERE APPLICABLE. THE FOLLOWING:
ITEM
RECD
DOES NOT
ITEM
RECD
DOES NOT',
APPLY
APPLY
PROTOTYPES
MANUALS
DRAWINGS AND SPECIFICATIONS
FINAL REPORT
PRODUCTION AND/OR OTHER
SPECIAL TOOLING
END ITEMS
OTHER GOVERNMENT PROPERTY
DATE OF LAST CO1vTACT WITH CONTRACTOR
DIVISION
25X1
P8cD S
INSPECTOR'S EXTENSION
3308
FORM
1 ~97 U$E SEC GROUP i
vJ P REV 1 0 U $ Excluded Irom automatic
8.64
EDITION (when Filled In) downgrodinp and
Approved For Release 2007/07/25: CIA-RDP78B04747A000100070017-2
Approved For Release 2007/07/25: CIA-RDP78B04747A000100070017-2
Approved For Release 2007/07/25: CIA-RDP78B04747A000100070017-2 _.,,._.,.
`'v'v i'ti it r L i ~ v a7 ~ }. V ~ { 1)1~'d ~ ~,_ ~j pry ~ `~"
E~v1iVLL;RIiVG SECTION~CB~PD~OL
IiO.~L}7'E: L;i1II'?7C2171rril~ .~EV1CG
IEST IfAATED COMPLETION DATE
'.THE
',~
CONTRACTOR IS ON SCHEDULE
YES
';PER CENT OF WORK COMPLETED
100ao
HAS AN INTERIM REPORT, FINAL REPORT. PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
DURING THE PERIOD7 ~ ves eo (If yes, give details on reverse side )
t__--J
HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED "(0 CONI'Vi ACTOR DURING THIS PERIOD7 ~ Yes
(If yes, indicate items, quantity, and cost on reverse side.)
b`yERALL N'rRFOR'f~.CNCE OF CONTRACTOR
AV~cRAGE ~? j ~ 6AR~LY ADEGUATE
IF GVERALL PERFORMANCE OF CONTRACTOR IS UfdS A~i ISFAC~i GRY OR BARELY ADEQUATE, INUICAIE REASONS ON
REVERSE SIDE.
.;ECOil,;ti'~ND'cD ACTION
:' Pft OTUTYPES
'~,: ;,Vi i NGS .. P:O SPECIFICATIONS
~~-~--.'?~-.;:ION AND/OR OTHER
_., ~ EhiS
.. ,~_ yr ..,;S~f CONTACT WITH CONTRACTOR
IF '(c ~1AINATION IS RECOMM19G NDED OR 1F THIS l5 A r~rvn~ ~~~~~?~ ..
CONTRAC7GR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERADLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED.
THES INCi,UDE. WHERE APPLICABLE, THE FGLL OIVING:
,,. ,c OF CONTRACTOR
CONTINUE AS PROGRAMMED
y'y 1'EkMINATE
INSPECTION REPCRT N0. (:f final, so state)
TFIE CONTRACTOR W ILLYROBABLY REMAIN WITHIN ALLOCATED
1=U':.DS f-l yES IJ NO IF ANSWER IS ?NO" ADVISE Ri;.C- k
Oh9M ENDATiON AND/OR ACTION -0F SPONSORING OFFICE, ON
REVERSE HEREOF. IF KNOWN, INDICATE MAGNITUDE OF ADDI-
141THHDLD PAYMENT PENDING
L-` SATISFACTORY PERFORt.!A NCE
OTHER (5pecify)COYl~ract beLng se~Ltleci.
- I 'DOES NOT`
REC D DOES NOTi I7Eh4 I RECD I n.
P.PPLY ` APTLY
I
I .,. ^!UALS I -~
j FINAL REPORT -~ %
SPECIAL TOOlI1vG j
I OTHER GUVER Nh9E NT PROP EiZTY f
INSPECTOR'S EXTENSION
;308
y ~ ?L~~,. ?VER.4GE 7, i ' UNSATISFACTORY %r
'lJ 4
ORM 7 ^1'7 ~ E c31:_~'~i~ ~ ..% GROUP 1
i Ezduded from outomafic
~' 64 Approved For Release 2007/07/25: CIA-RDP78B04747A000100070017-2
Approved For Release 2007/07/25 :CIA-RDP78B04747A000100070017-2
1. Contract ha.s peen c., ?.:?leted.
1'~;i:iTi 1S b2~ n~; C:ei1Vi=:'.~ Fu ~L ~Or StOr 2.~e .
1tGi;1 is usable for nart.i only.
Delivery of the item has been d.ela,ye~. ror many
months primarily bec~.~.zse el''orts v~ere being made
to make some practical use oz the unit.
Approved For Release 2007/07/25 :CIA-RDP78B04747A000100070017-2
Approved For Release 2007/07/25: CIA-RDP78B04747A000100070017-2
CONTRACT INSPECTII~REPORT
ENGINEERING SECTION~CB~PD~OL
DATE
.~ ~=
INSPECTION REPORT N0. (If final, so state
3.i?54~.~ ~~i~''s'I?S
ESTIMATED COMPLETION DATE
~`C~t~~~.>~'~r~
YES u NO
f
3. ^ EXCELLENT 5. ~ ACCEPTABLE 7. ^ UNSATISFACTORY
^ OUTSTANDING
. ^ SUPERIOR 4. ~ HIGHLY SATISFACTORY 8? ^ BARELY ADEQUATE
IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE, INDICATE REASONS ON
REVERSE SIDE.
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
FUNDS ~ YES rI No IF ANSWER IS "NO? ADVI-SE REC-
OMMENDAT-I.ON AND OR ACTION OF SPONSORING OFFICE. ON
REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF ADDI?
TIONAL FUNDS INVOLVED.
HAS AN INTERIM REPORT, FINAL REPORT, PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
DURING THE PERIOD? ~ YES ^ No (If yes, Qive details on reverse side.)
NO
HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? ~ YEs
(If yes, indicate items, quantity, and cost on reverse aide.)
^ CONTINUE AS PROGRAMMED
DOES NOT
APPLY
OTHER (Specify) li-,?';.T"`at"** ~`~~'~.
^ TERMINATE g
IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT ATTACH COMMENTS IN NARRATIVE FORM ON
CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED.
THESE INCLUDE, WHERE APPLICABLE, THE FOLLOWING:
PRODUCTION AND/OR OTHER
END ITEMS
WITHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
FORM
3-64
1897 USE SECRET GROUP 1
P R E V I O U S Excluded from automatic
Approved For Release 2007/07/25: CIA-RDP78B04747A000100070017-2
DOES NOT
APPLY
Approved For Release 2007/07/25 :CIA-RDP78B04747A000100070017-2
It h~,a bra
'tl"i~,GLeu' ~i7 ~Jri SRawr..c> ti. y~ ._,_ ___ _ ~~~
eft ~ Ll~iw f'tu'1h+~' '~ ~~' ~ ~
[l@
3
~.
9
~~~ ~i~~ ~t9C$itic~~. tip Bd3~ ~
v'x~ ~!7~#.T~t ~.~, ~~~ ,,?
25X1 the ~
this
tt~~t ~ t:L~ ~~ e;~ded sA
' ~g~~b3~ ~'cs9~ ~~
~2
,y
-25X1 1aI~R1a ~~e~- d~rec
~+c~n~ci~n~,~~.~~o~ Ioi#.a~ a-~.,3. ~ at ~~i~t ~i~l tea ~`'~ ~~~+
~~' 1r can~ract #~..~~ ~~ti~. ~-~ c~.4.~ ie~ar ~.?
Frame ~ ~~s^c~i ~~ s ~~ w~r~~ Y~a~ bin ,end cxa~
~~~~ ~~ ~~ ~.~ 25X1
~, ~ ~`~. `'A#f t2213.'~ 1~$$t~ 25X1
"
'~
deaS.~~.c~~ +o~x ~ .. ~
t ~'~ ~#' ~ ~~~ ~rit~ ~
~
p~
~~;~ went ~u
Ica ~p1~~ ~, _ ~ _.~ _ ... ~~,~.~ ~. ~~ ~~
Zt i~t ~:ysre~'c ~'
' Ct3d1'tC~ C~ ~L
~~ ~r1~~~ ~h~a~d 1~
~~ ~~~a
~~ ~' ~ .
Approved For Release 2007/07/25 :CIA-RDP78B04747A000100070017-2
SECKEI
_,
Approved For Release 2007/07/25: CIA-RDP78B04747A000100070017-2
CONTRACT I N~c;T I ON REPORT
ENGINEERING SECTION~CB~PD~OL
ESTIMATED COMPLETION DATE
'~'~hr~e r~r 1.:ti~:3
THE CONTRACTOR IS ON SCHEDULE ^
? YES NO
THE CONTRACTOR WILL COMPLETE TASK WITHIN ALLOTTED TIME
HAS GOVERNMENT?OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD?
(If yes, indicate items, quantity, and cost on reverse side.)
HAS AN INTERIM REPORT, FINAL REPORT. PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
DURING THE PERIOD? ^ YES ^ No (lf yes, give details on reverse side.)
OUTSTANDING 3. U EXCELLENT
? ~ SUPERIOR 4. ~ HIGHLY SATISFACTORY
CONTINUE AS PROGRAMMED
A~~l ~~
INSPECTION REPORT N0. (If final, so state
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
FUNDS ? YES ~ NO
ALL PHASES OF THE TECHNICAL PROGRESS ARE SATISFACTORY
YES ^ NO
g. ^ ACCEPTABLE 7. ^ UNSATISFACTORY
g, ^ BARELY ADEQUATE
IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE, INDICATE REASONS ON
REVERSE SIDE.
^ WITHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
? TERMINATE ~ OTHER (Specify)
IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT, CERTIFY~THAT ALL DELIVERABLE ITEMS
UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE. WHERE APPLICABLE, THE FOLLOWING:
fee node on reverse side
RECD DOES NOT RECD DOAPPLNOT
ITEM ITEM
APPLY
PRODUCTION AND/OR OTHER
END ITEMS
6 ~r~,~h ~.9~?3
FORM 1897 SECRET
1 ? 62 Exchded f^d,^^u^^d tic
Approved For Release 2007/07/25: CIA-RDP78B04747A000100070017-2
Approved For Release 2007/07/25 :CIA-RDP78B04747A000100070017-2
:~~....~
A~ a +~xlt c~~ the ~~. #.n~~~~tic~ F~brr~? ~.~+~~ ~~,~ ~aae~tz~u~en~L
~t~~ ~?e~ec~. ~~ recc~utia~-:~ for fi~t~. d?~go~~.ti~ eaxt~ ct~t.i~~.
~. zoe~ox~~ltur. tc~ the ~~si~t~t ~'o~ F~~ ~ttt4 ~~~f-~.I.opsn~~at c~~:~ed ~ :,rah ~_
Approved For Release 2007/07/25 :CIA-RDP78B04747A000100070017-2
pp
v
:
-
VI / VVVZ/Z/rIVVV IVVV/
VV 1 /-L
............ .....
.._....25X1
CONTRACT IN~~~T ION REPORT
'"""'`
~
r~
T
.
.
.
T0~
DATE
+~~ ((""
~I:~~..~~~ ~~i9
ENGINEERING SECTION~CB~PD~OL
ON REPORT N0. (If final, so state)
INSPEC
TI
*
~
dear"
ESTIMATED COMPLETION DATE
,q, rK `" Sa .~ `~~ 3
NAME OF CONTRACTOR
25X1
MMODITY.OR
SERVIC
TYPE OF
O
E
~ _
C
,g,. yy~..,.~(
+~x~
.~
.,
yy
n
aYi~w +~T,: ~~F,tr: '';Y ~4JU .S1C??J .4Ctr .
THE CONTRACTOR IS ON SCHEDULE
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
O
?
^
FUNDS ^ YES ? NO
N
YES
THE CONTRACTOR WILL COMPLETE TASK WITHIN ALLOTTED TIME
ALL PHASES OF THE TECHNICAL PROGRESS ARE SATISFACTORY
^ YES ? NO
? YES ^ NO
HA5 AN INTERIM REPORT, FINAL REPORT, PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
tails on reverse side.)
e
HE PERIOD? ~vES
, give d
DURING T
ye
s
^
NO (If
y
~
+~y
q~
,
}},~,,,
y.
4
HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIODt ~ VES ^ NO
(If yes, indicate items, quantity, and cost on reverse side.)
OVERALL PERFORMANCE OF CONTRACTOR
I ~ OUTSTANDING 3. ~ EXCELLENT 5. ? ACCEPTABLE 7. ~ UNSATISFACTORY
2? ^ SUPERIOR 4. ~ HIGHLY SATISFACTORY 6. ~ BARELY ADEQUATE
IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE, INDICATE REASONS ON
REVERSE SIDE.
RECOMMENDED ACTION
~. CONTINUE AS PROGRAMMED ~ WITHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
TERMINATE ~ OTHER (Specify)
IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT, CERTIFY-THAT ALL DELIVERABLE ITEMS
UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE, WHERE APPLICABLE, THE FOLLOWING:
ITEM
REC D
DOES NOT
ITEM
RECD
DOES NOT
APPLY
APPLY
PROTOTYPES
MANUALS
DRAWINGS AND SPECIFICATIONS
FINAL REPORT
PRODUCTION AND/OR OTHER
SPECIAL TOOLING
END ITEMS
OTHER GOVERNMENT PROPERTY
NTACT WITH CONTRACTOR
DATE OF LAST CO
f
LJ ~ I`, ~
DIVISION 25X1
Vii: jr~S
~~'
o
;
lts2 1897 SE
ro
ed For Release
Excluded from automatic
Approved For Release 2007/07/25: CIA-RDP78B04747A000100070017-2
2007/07/25
CIA
R
Approved For Release 2007/07/25: CIA-RDP78B04747A000100070017-2
~'
,,
T0: Inspection Branch~PD~OL
REPORT PERIOD:
Contractor
Address
Commadity~Serviee
Noo Of Prototypes
V
DATJ' 9 ~~ Z
CONTRACT
REPORT
Contract Completion Date
The Contract is on schedule: Yes ~ No
The Cantractar will remain within his allocated. funds:
An extension of time will be necessary: ~ Yes
All phases of the technical progress are sattfactory: ~ Yes
The overall performance of this Contractor is: ~ Satisfactory
NOTE: If unsatisfactory or subject to im~ ~ Subject to improvement
provement indicate reasons under
commentsa ~ Unsatisfactory
. Comments Q~ ~ ,~ by
Recommended Action:
Date of last visit to Contractor's Plant:
Inspected by:J
Division &:Extension
Approved For Release 2007/07/25: CIA-RDP78B04747A000100070017-2
Approved For Release 2007/07/25: CIA-RDP78B04747A000100070017-2
T0: Inspection i3ra;.a:ch/PD~OT~
REI~ORT 1?ERIOD :
~`
DATE
3 ~x 3.
CONTRACT
If final,,sa state
A.ddx?ess ~#
~~ ~ ~~
Co~nno~ity~Service ~' Classification ;;~,,.:.`...,;~~~,:,~~..
~'Vo. Of Prototypes
Contract Completion. Date a`~ ~.".
The Contract is an schedule: Yes ~ No
The f~antractor will. remain within his allocated funds: Yes No
An extension of time will be necessary: ?: Yes~wNo
A11 phases of t~.e technical progress are satifactory: ==~ Yes No
The overall performance of this Contractor is: Satisfactory
NO`1*E: If unsatisfactory ar subject to im- ~ Subject to improvement
provement indicate reasons under
camments.
Recommended Action:
Unsatisfactory
25X1
Date of last visit to Contractor's Plant:
Inspected by: ?-.~~i
Division & Extension
Exclud?d from automat5c
do~n~radia~ and
declz~svitlcation
Approved For Release 2007/07/25: CIA-RDP78B04747A000100070017-2
Approved For Release 2007/07/25: CIA-RDP78B04747A000100070017-2
T0: Inspection Bra,:~ch~PD~OL
REPORT PERIOD : ~? t~_.~.
DATE -
CONTt-TACT
REPORT
-~If final, so state
Contractor~~
Address
Commodity~Service saification
Noa Of Prototypes _ Contract Completion Date
The Contract is on schedule: YesT~ No
No
The Contractor will remain within his allocated funds: Yes
An extension of-time will be necessary: ;~ Yes No
p p Y ~ _~_ No
All bases of the technical rogress are salrifactor Yes-
The overall ,performance of this Contractor is:
NOTE: If unsatisfactory or subject to im-
provement indicate reasons under
comments
25X1
Recommended Action:
Date of last visit to Contractor's Plant:
Satisfactory
Subject to improvement
Unsatisfactory
Inspected by~
Division & Extension
Approved For Release 2007/07/25: CIA-RDP78B04747A000100070017-2
Approved For Release 2007/07/25: CIA-RDP78B04747A000100070017-2
~rr-'
TO: Inspection Br?a~a.ch~PD~OL DATE
REPORT PERIOD:
Contractor
Address
CONI'RA.CT # L
REPORT
If
as s i f i cat ion
Commodity~Service
final, so state
The Contractor will remain within his allocated funds: Yes ~ No
An extension of time will be necessary: ~ Yes No
All phases of the technical progress are satifactory: ~; Yes:- No
The overall performance of this Contractor is: ~ Satisfactory
No~ Of Prototypes Contract Completion Date
The Contract is on schedule: .Yes ~ No
NOTE: If unsat3,sfactory or subject to im-
provement indicate reasons under
comments
Subject to improvement
Unsatisfactory
Recommended Action:
Date of last visit to Contractor's Plant
Inspected by
Division & Extension
Approved For Release 2007/07/25: CIA-RDP78B04747A000100070017-2
Approved For Release 2007/07/25: CIA-RDP78B04747A000100070017-2
T0: Inspection $ranch~PD~OL
REPORT PERIOD : ~ ~~" `__
Contractor
Address-
DATR
CONTRACT #~
REPORT
If fi a1, so state
Comm.odity~Service ____ _ Classification
Noo Of Prototypes ;~, Contract Completion Date
The Contract is on schedule: ;~ Yes No
The Contractor will remain within his allocated funds: ~; Yes No
An extension of time will be necessary: Yes ~ No
All phases of the technical progress are satifactory: ~ Yes No
The overall ,performance of this Contractor is:
NOTE: If unsatisfactory or subject to im-
provement indicate reasons under
comments
Comments:
Recommended Action:
Satisfactory
Subject to improvement
Unsatisfactory
Date of last visit to Contractor's Plant:
Inspected b~
Division &:Extension
Approved For Release 2007/07/25: CIA-RDP78B04747A000100070017-2
25X1
Approved For Release 2007/07/25: CIA-RDP78B04747A000100070017-2
T0: Inspection Branch~PD~OL
REPORT PER IO]pF,{} ~ 19 62
Da.TJ ~ h 1962
CONTtZACT
REPORT
If final, so state
Address ~~ Axlgele~, C~slitcr~xia
-ga ~nhancearar~t
Coxnmodity~Service 13ivice Glassificatian I~IITCLRSS~`
Noo Of Prototypes 1 Contract Completion Date ~ 61
The Contract is on schedule: ;~ Yes No
The Contractor will remain within his allocated funds: ~ Yes N
An extension of time will be necessary: Yes ~ No
All phases of the technical progress are satifactory: ~ Yes No
The overall ,performance of this Contractor is: /z~ Satisfactory
NOTE: If unsatisfactory or subject to im- ~ Subject to improvement
provement indicate reasons under
commentsd ~ Unsatisfactory
Comments : NP~~ ~' subm9.tb re u~st for ahan a ~- soy xhiah'r91 in~reaes~ aontract~
~"'~ ~"unding ire. ~~va au~ovnt of an ehange emery un
Date of last visit to Contractor's Plant: 1~~3'7-DCC ~1
Division & Extension T~l3S ~
Inspected
Approved For Release 2007/07/25: CIA-RDP78B04747A000100070017-2
Approved For Release 2007/07/25 :CIA-RDP78B04747A000100070017-2
25th MONTHLY PROGRESS REPORT
Image Enhancement Program
Contrac~ (Task Order No. 1
1 December 1962 to 18 January 1963
During the period covered by this report work has- proceeded in
accordance with the program outlined in the previous monthly with the
following minor alteration: Phase A, the continuation of the laboratory
experimentation, -and Phase B, packaging for delivery have been com-
bined in order to effect more economy.
Just prior to disrnantling the laboratory setup in preparation for
cabinet installation, a number of tests were run which indicated sa-
tisfactory results with regard to the overall uniformity and fidelity of
the input and output scanning functions. The enclosed photographs are
prints which illustrate the performance which was achieved. Print A
is a photographic reproduction of the image which was scanned. Prints
B and C are reproductions of the original negative material from the
camera which photographed the output cathode ray tube. The enhance-
ment circuitry was adjusted to achieve area ,scan filtering effects which
are clearly evident in the photograph B. Print C was made without area
scan filtering and only electronic high pass filtering, In both prints
B and C the contrast of the smaller detail is increased wh11e the con-
trast of large detail is decreased.
Work is currently under way on mounting all of the equipment in
the console. It has ben found possible to mount the output cathode
ray tube immediately behind the front panel of the console in the area
formerly reserved exclusively for control. This has been achieved by
rearranging same of the electronics and will permit more ready access
Approved For Release 2007/07/25 :CIA-RDP78B04747A000100070017-2
Approved For Release 2007/07/25 :CIA-RDP78B04747A000100070017-2
and convenient operation. It is expected that the packaged equipment
will be in operation in early February thus permitting a resumption of
the evaluation experiments. Our schedule for in-plant acceptance of
the equipment to be delivered is 28 February 1963.
Approved For Release 2007/07/25 :CIA-RDP78B04747A000100070017-2