CONTRACT INSPECTION REPORT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A000100120022-4
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
19
Document Creation Date:
December 28, 2016
Document Release Date:
March 1, 2000
Sequence Number:
22
Case Number:
Publication Date:
April 9, 1964
Content Type:
FORM
File:
Attachment | Size |
---|---|
![]() | 1021.1 KB |
Body:
SECRET
(When Filled In)
rye 2000/05/10
CONTRACT I NSPECT i-mn' REPORT
TO:
ENGINEERING SECTION/CB/PD/OL
GOC!!TFf'bP78BQ44~4
62 3
DATE
") Anrl-I
A000100120022-4
INSPECTION REPORT NO. (If final, so state)
F 1 peport
ESTIMATED COMPLETION DATE
C
TYPE OF COMMODITY OR SERVICE
THE CONTRACTOR IS ON SCHEDULE
YES
^ NO
PER CENT OF WORK COMPLETED
ALLOCATED
CONTRACTOR WILL OPROBAAB n
ANSWER IS NO"ADVISE RECD
FUNDS [3 YES Q
OMMENDATION AND/OR ACTION OF SPONSORING OFFICE. ON
REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF ADDI-
TIONAL FUNDS INVOLVED.
HAS AN INTERIM REPORT. FINAL REPORT. PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
NO (If yes, give details on reverse side.)
DURING THE PERIOD? a vE S ^
BB EENcOStlonRreverrse CONTRACTOR OR DURING THIS PERIOD?
DELVED TO HAS GOVERNMENT-OWNED PROPERtTY
tid
(If yes, indicate items, 9PO
0
^ NO
rue S+Ie
OVERALL rtrr~R~ 7. ^ UNSATISFACTORY
5. ^ ACCEPTABLE
I, ^ OUTSTANDING 3. ^ EXCELLENT
LY SATISFACTORY 6. ^ BARELY ADEQUATE
? HIGH
4. 2. ^ SUPERIOR
F OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE, INDICATE REASONS ON
^ TERMINATE IF HIS IS FINAL EPORT IF TERMINATIOEANDMCERTDIFYRTHATTALL DELIVERABLERITEMS UNDER HTHEMCONTRACT HAVE BEEN RECEIVED.
CONTRACTOR'S PERFORMANCE oe,~rewl_E. THE FOLLOWING.
STATOTHR
RECOMMENDED ACTION
0
WITHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
m OTHER (Specify)
^ CONTINUE AS PROGRAMMED
DRAWINGS AND SPECIFICATIONS
PRODUCTION AND/OR OTHER
END ITEMS
DATE OF LAST CONTACT WITH CONTRACTOR
_hpproved For Releas
FORM 1897 PUSE
REVIOUS
3.64 vv ED ITION
DOES NOT
APPLY
MANUALS
r==
25X1A
OTHER GOVERNMENT PROPERTY
SECRET
(When Filled in)
25X1A
Approved For Release 2000/05/10 : CIA-RDP78B04747A000100120022-4
STATOTHR
STATOTHR
The MTA15 ces sor has been shipped to
at at Government expense, It is beth held
in storage, It will be GIT as a test vehicle on a forthcoming Proces
h Program in a (WE ci n rot encl
Services of
epresentat a
ring Representative a end t
been c feted and a
963, it was tern a ed that the
to include the "Ace :2ator" and
amt of $3,848.Os These ter
of actOry :" have been accepted.
By Staff Study of - 14 Januwf 1964* it gals rec ,ate that the
1TA/5 be accepted and that a conference be array d by Station 954 to
ne hate acceptance a f'inai er itratct settlemnt, This action is
it n g re 1te or a final audit of acct to at
STATOTHR
Approved For ReWse 2000/05/10 : CIA-RDP78B04Z47A000100120022-4
SECRET
(When Filled In)
0/05/10 :
Relea s
A
d F
E
W-RTDP78B0 47A 0t11~f0120022-4
CONTRA~
NSPE
R
POR
0
242-63
TO:
9
DA
ENGINEERING SECTION/CB/PD/OL
INSPECT inal, so state)
ESTIMATED COMPLETION DATE
NAME OF CONTRACTOR
STATOTHR
TYPE 0
THE CONTRACTOR IS ON SCHEDULE
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
^ YES NO
FUNDS ^ YES NO
THE CONTRACTOR WILL COMPLETE TASK WITHIN ALLOTTED TIME
ALL PHASES OF THE TECHNICAL PROGRESS ARE SATISFACTORY
12 YES NO
@ YES ^ NO
HAS AN INTERIM REPORT. FINAL REPORT, PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
DURING THE PERIOD? E YES n NO (If yes, give details on reverse side.)
HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? EJ YES NO
(If yes, indicate items, quantity, and coat on reverse side.)
OVERALL PERFORMANCE OF CONTRACTOR
I? ^ OUTSTANDING 3. ^ EXCELLENT 5. ACCEPTABLE 7. ^ UNSATISFACTORY
2. ^ SUPERIOR 4. HIGHLY SATISFACTORY 6. BARELY ADEQUATE
IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE, INDICATE REASONS ON
REVERSE SIDE.
RECOMMENDED ACTION
? CONTINUE AS PROGRAMMED ^ WITHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
F1 TERMINATE OTHER (Specify)
IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT ATTACH COMMENTS IN NARRATIVE FORM ON
CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED.
THESE INCLUDE, WHERE APPLICABLE. THE FOLLOWING:
'ITEM
RECD
DOES NOT
ITEM
RECD
DOES NOT
APPLY
APPLY
PROTOTYPES
MANUALS
DRAWINGS AND SPECIFICATIONS
FINAL REPORT
PRODUCTION AND/OR OTHER
SPECIAL TOOLING
END ITEMS
OTHER GOVERNMENT PROPERTY
DATE OF LAST CONTACT WITH CONTRACTOR
4 November 1963
S
DIVISION
POS
1
SIGNATURE OF APPROVER
3308 5 1 A
)nnnlnr
A
r, v.
I Excluded from automatic
(When Filled In) downgrading and
declassification
Approved Fq Release 2000/05/10 : CIA-RDP'7,*04747A000100120022-4
Prototype HTA/5 processor was delivered to March AFB, California, on
30 September for acceptance tests and extensive additional tests imposed
by SAC. Tests are being conducted by 15th Rec. Tech. Squad. under Lt Col
William Richards. STATOTHR
One epresentative and one Manufacturing
Representative were in attendance for the first 20 days for installation
and checkout. The Engineer Representative has been retained and is
expected to remain there for an additional period not to exceed a total
of 45 days which will end on or about 22 November. All contractor service
(by these two men) has been at Government expense.
The contractor has been quite cooperative and has put forth a good
effort to keep the machine operating during the test period. However,
the processor has exhibited excessive breakdowns due to a variety of
causes. Consistent effort has been applied to correct each breakdown as
it occurs. Most problems bava been alleviated. One, however, has re-
curred many times and thus far has defied solution. This has been the
frequent but inconsistent out-out of various solution pumps which seem
to be overloaded, causing them to overheat and blow the motor fuses.
It has been assumed that the pump overheating is due to low 'voltage supply
and heavier fuses have been used to keep the pump motors running at
somewhat higher temperatures than recommended by the pump manufacturer,
but supposedly within specifications. This attempt to keep the system
in reliable operation has also failed. Because of these frequent break-
downs or partial stoppage of the system, it has been virtually impossible
to conduct a systematic and meaningful test program. At no time has the
machine run more than 9 hours consecutively without at least one partial
breakdown.
STATOTHR The roject monitor will Bpi accept the machine for final payment
until provides acceptable reliability in the operating components.
During the week of 17 November, the monitor will endeavor to define
the cause and initiate positive corrective action. This may, however,
involve addtional contract funds.
The last previous inspection was on 3 and 4 November at which time
the machine failed to exhibit sufficient reliability to justify acceptance.
Previous contract actions have been initiated to provide services
of the two contractor personnel at $6,500.00; extension of services at
$2,500.00; payment for extra materials required for installation at
March AFB in the amount of $656.00; and payment for new work on accumu-
lator and film spools at $23,848.00.
Approved For Release 2000/05/10 : CIA-RDP78BO4747A000100120022-4
Approved For Release 2000/05/10 : CIA-RDP78B04747A000100120022-4
- nneb. a`I, October 1.:>;a ?YY?LtBi=. tnis :;oai id or; oil iitl k3 ue'a';;i~, t: service unit 3YfC3.3u3%i.l%t z3u
CYou J Y "..' quioA f,Aa6corni3CtS. eta ?er~ t$l't u1 to
between tre hose
~L -laf - obs ~}~ tdii-;sdi 1. 1. t,~i:iA 1c; cti~Yf E~ ?? -
qui& k discolinbe,-t to take c:4:re ci: this. We installed feet
3 adr_.r Ort is 'il. cart. ji is will- ie us to to ct.e;cr out tt.}e air
aligned. 1_'7e i astaiied tti? slal%.le sl.:lice,r ~ iii. nuiGoer 0i i unlii'ioatAoii ta;;ti
coy.. 01-11, J_ , . root?;3 of e "ad to individually rir,t OVA 4:.,e
ri Fe; "F'.G. ll13Ei 01 ti iB.
Approved For Release 2000/05/10 : CIA-RDP78BO4747A000100120022-4
Approved For Release 2000/05/10 : CIA-RDP78BO4747A000100120022-4
' OcI;O" er .3, 1. ( 3
u C>' {3'[! .~_ t! L(.ttl.Ilx F 1a l? o71 ~F,`a Lzii. ig i`~ E1137J it 1CVc~. n ..,,,ire gutters
in t} e
_3.`d:ecc :.tJC7~ 1Bt~ ilk. e'73rlrsr; t t3i;a~efvat
e(3
1
?
: .4
;Yi
s 61:`:3
:.1 ?. i&.+ sou t3 ,,
,4x
:Gae 4if ~i'14~ Sgt, iu vl 1 St e 30 01 tP=cw y A Se
ti -f)iifl f_~i ti ~fl 47../ .~ nes --ZOfLl
Approved For Release 2000/05/10 : CIA-RDP78BO4747A000100120022-4
Approved For Release 2000/05/10 : CIA-RDP78BQ4747A000100120022-4
a "3 I'3.ei ii d roc -`--!U3 j OL avi%i3 J row r`da
~
s.a ei aS1C, tr1(3i OUT, rt.Ll 11?+ V. ~'ajotewk3 "< 2 4LL ?_^
3= 'o the individual Ur1i?G?'. i s GC?i3 clWTo_t.i 3teJ-y T-~.' it
Ct Sino Ya(JF.i 0i tiic tags i 3d E3een of tht iti tr
Z
rs vv~Za1r h f... w~SM o: word.4 116 in the root :.cap AU 11 u* ur biYice
i LL1 I ~G. in-13 :ectiofi uoLxi x uk and 8d-ui'I.6ed, to gGt 0-6 ro0iii Cleca.11eu Us1t.-
=. rc: .;RC .;Canc; to *rile U a OV1.01 CCoitdinOix had rF;,u-8ted-
iat ; of > tar s n t ours u~iist n,~ d;e~u~v I u.ailxg 11 , would )e aoit ti:: ~der-
;',chine. I did not finish this and will continue it Monu1a ~ .
to rewire the relay which made contact; co the drjbox a 's,lower. 2 , s
11 !rt 9 e-alfl. been hooit.Cu up a1te t? a maci:.t1Y1e wa taken apart and wall ie Ver +F'. 2;s Cx id.
out
-c c. nd of film switc..i so that .t :s:? 1i o t rate. This w a6
e5 .. y Y
q,[ F n '.~J n ad to done Ydone here. An airs an ;'ttit3 sent 1. t3 lions on f,2?TiE3Ue to
acid c iet; ri c-U oa aies. iveit ic. r ob nor myself' cou ci c3 noe . urc
,. ;o, t o.: t.;c ?ia,r. They brought the !lost, down h re at about ! o' uluc
w-t toga lats to ire ta1l it.
Approved For Release 2000/05/10 : CIA-RDP78BO4747A000100120022-4
Approved For Release 2000/05/10 : CIA-RDP78EW4747A000100120022-4
Approved For Release 2000/05/10 : CIA-RDP78BO4747A000100120022-4
Approved For Release 2000/05/10 : CIA-RDP78BO4747A000100120022-4
4 October i s 19u3.
in at 11 o'clock today and works t: until 4 e~' cla:k witf_ one. of the
r e t -y .ts hooking up .;xil the drain hooves. we h Aa some trouble since ?,ce to not
_,,: elbows to go into the drain:. At 4 o'clock the rest of the crew came
,? we vorkea ur:tii little after 1 ; o'clock tonight. a iiled all tany,:3 with.
water ::brad fixed almost all bearingo, because the, back plates were leaking. We
iy d a few leaks in they service: unit:. 'I'he water hose which the Air Force
i a u tea on the "chin Lint?t two times wrrvich caused quite a s e ,s and a
-L- aj
1 o foj? I - iinnot tai vta d ct water tiara it t else. . #J.ot of the wiring
4
;o k aid had to bb dried
Approved For Release 2000/05/10 : CIA-RDP78BO4747A000100120022-4
Approved For Release 2000/05/10 : CIA-RDP78BO4747A000100120022-4
Tuesday, October 0, 1;f33?
t `or Secorlf1 gal"key yi~t=aC S171Gt` l r ZEi tIc J_a t3~J iE.r3:Y1
l s f.e
_ "red exoz .,~ iecked. out
P
first t~:ing tomorrow.
c5s:s, Will beor1-
, ~ t `t v rs
it. Be aust of this we have a fine s -ray hitting the fil aft-r it
.kI
il:d_~~t~._ .F f.` =I 3_-t?gl.;p C e3li3?'~ @7$tE,rr-aI'K1Ik y U34T. 3.`i er~p C tL cart Goa Jf
Y(.