CONTRACT 705, TASK ORDER 3
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A000100150005-0
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
March 1, 2000
Sequence Number:
5
Case Number:
Publication Date:
October 16, 1964
Content Type:
LETTER
File:
Attachment | Size |
---|---|
![]() | 97.73 KB |
Body:
GopyA iprBveldo Release 2000/05/10 : CIA-RDP78B04747A000100110005-O
October 16, 1964
Subjects Contract 7O5, Task Order 3
Gentlemen s
The Variable Magnification Tracing Projector delivered under the
subject contract is currently undergoing evaluation testing.
Your technical representatives have indicated, satisfaction with
the instrument particularly with the resultant solution to the
illumination 'Problem.
A final tabulation of actual expenditures versus contract funds
is as follower
CONTRACT FUNDS ACTUAL EXPENDITURES
Engineering Material
;ngineeering Labor
Engineering Overhead
Manufacturing Material
manufacturing Labor
Manufacturing Overhead
Subcontract
General Research
G&A
Fee
25X1A
TOTAL
In an effort to complete the contract without additional delay and
since it is difficult to forecast total expenditures at the very
end of a contract, additional funding was not requested at the time
accumulated expenditures roachad allocated funds. Since the total
cost is now known we are able to submit a realistic request.
Actual expenditures 25X1A
Contract Funds
Overrun
Approved For Rel?ase 2000/05/10 : CIA-RDP78B04747A000100150005-0
Approved For Release 2000/05/10 : CIA-RDP78BO4747A000100150005-0
October 16, 1964.
Your consideration and approval of this additional funding is
requested. If additional information is required, please
contact me at Locust 2-3000, tension 2I.2.
25X1A
oat Kan K.
Photograinmetric Contracts Section
e. GSA 1
fww,
40 ~ 401a
'Z 117
Approved,,For Release 2000/05/10 :CIA-RDP78B04747A000100150005-0