PROGRESS REPORT VARIABLE MAGNIFICATION TRACING PROJECTOR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A000100150026-7
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
4
Document Creation Date: 
December 28, 2016
Document Release Date: 
March 1, 2000
Sequence Number: 
26
Case Number: 
Publication Date: 
February 15, 1963
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A000100150026-7.pdf160.2 KB
Body: 
Approved For Releias~e 2000/05/10 : CIA-RDP78BO4747A000100150026-7 B A U S C H & L O M B I N C O R P O R A T E D R 0 C H E S T E R 2, N E W Y 0 R K February 15, 1963 25X1A Post Office Box 3407 Main PO Washington 13, D. C. Attention: 25X1A Subject: Progress Report Variable Magnification Tracing Projector Dear Sir: We are enclosing the subject Progress Report covering the period 1 January 1963 to 1 February 1963. We are sending a carbon copy of this report directly to the Contracting Officer. 25X1A DCB Enc. rbduct Supervisor Analytical & Photogrammetric Instrument Sales co: Contracting Officer Approved For Release 2000/05/10 : CIA-RDP78BO4747A000100150026-7 Approved For Release 2000/05/10 : CIA-RDP78B04747A000100150026-7 Variable Magnification Tracing Projector U.S. Government Order 2MP34O48 Monthly Pro ress Report Covering 1 January 1963 to 1 February 1963 The following work was accomplished on the project during this reporting period. 1. The sub-contracted manufacturing by Liberty Tool & Die Co. was held up by their delayed receipt of the purchased parts, The three special lead screws from Saginaw were not delivered until the third week of January. Therefore, the entire fabrication and assembly has slipped to an anticipated delivery to B&L about the middle of February. 2. Parts and components will be anodized and painted at B&L prior to final assembly and calibration. It was determined that the desired outside color of Desert Tan would necessi- tate a special order from the paint vendor. The second choice, Photogrammetric Green, was therefore accepted as suitable by the customer, per phone discussion with R. Thomas. 3. Delivery is anticipated at the end of February 1963? 25X1A Research & Development BAUSCH & LOMB INCORPORATED Approved For Release 2000/05/10 : CIA-RDP78BO4747A000100150026-7 Approved For RJase 2000/05/10 : CIA-RDP78B0747AOOO1OO15OO26-7 Variable Magnification Tracing Projector U.S. Government Order 2MP340 .8 Monthly Progress Report Covering 1 December 1962 to 1 January 1963 ollcwing work was accomplished on the project during this reporting period, Approval was received from the Contracting Officer on 10 December 1962 .for the additional funds requested which include the two engineering changes reoox ended earlier. Approval was granted to use Liberty Tool & Die Company as a subcontractor, 2. A subcontract was let 10 December 1962 with Liberty Tool & Die. Company to manufacture the pro jeotor, according to the drawings and specifications provided. Delivery of the unpainted unit without optics and calibration is scheduled for i.January 1963. Customer representatiWea visited then plant 10 December 1962 and discussed the project and the operation of the instrument in detail. The color of DESRRP TAN ((spravkle finish.) was suggested as the outside paint coloring and will be considered insofar as possible. It was guested that the folding table size be changed to 1." by 31P O which has been done. 25X1A Research & Development BAUSCH & LOMB INCORPORATED Approved For Release 2000/05/10 : CIA-RDP78BO4747AO00100150026-7 Approved For Release 2000/05/10 : CIA-RDP78B0O4747A000100150026-7 Variable -Magnification Tracing Projector U.S. Government Order 2MP3I.Oi48 Monthly Progress Report Covering 1 November 1962 to 1 December 1962 The following work was accomplished on the project during,; the reporting period. The design of this instrument was completed 9 November 1962 and direct engineering labor charges were suspended from that date until further notice. The two mirrors that had been ordered earlier were delivered on 21 November 1962. Cost estimates and analysis were submitted to the customer 12 November 1962. All work on this project has been suspended pending approval by the customer. 25X1A Research & Development BAUSCH & LOMB INCORPORATED Approved For Release 2000/05/10 : CIA-RDP78BO4747A000100150026-7