A RECOMMENDATION FOR THE LOCATION OF THE(Sanitized) DUAL STEREO COMPARATOR(Sanitized)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A000200030016-0
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
4
Document Creation Date: 
December 28, 2016
Document Release Date: 
August 9, 2002
Sequence Number: 
16
Case Number: 
Publication Date: 
December 5, 1967
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A000200030016-0.pdf307.76 KB
Body: 
Approved For Release 28: CIA-RDP78BQ4747A000200030016-0 low T I I I FOR I Chief, Support Staff A Recommendation for the Location of th ual Stereo Comparator) 25X1 25X1 25X1A 1 A meeting was held December 4 to discuss the cons and in o ndations for the location of the al romp rator. hose in attendance were 25X1A 2. I Iopened the meeting by stating that a decision had to be reached as to whether the dual comparator could or could not be located in the old clean lab of TID on the second floor, if not why not and which alternate location in the building would meet the site requirements for the instailatton. This opening statement 2 5X1A was based on the latest information available from the Company and our consultant engineer regarding the instrument as 25X1A to site (dimension), total weight, vibrations contained in he length of time for site preparations, operational down time 1-5 --the remaining portion of the TID operation during the construction, construction of site preparations on the second floor* and the low weight capacity of the elevators 25X1 A which prohibits the raising of excessive weights to upper floor levels. 25X1A 3. d a rumor that more than one instrument 25X1A may be installed as originated by himself on the probability that DIA may wish to procure such an instrument to be housed in the building, and that he could not foresee NPIC procuring more than one instrument for their own use within the next four to five years. 25X1A 4, of TID, stated that they ha attending this meeting and that Declass Review by NIMA/DOD who represented Chief 25X1A rior to 25X1 A ,t was h 1s es that the instrument Approved For Release 2002/AW7 CIA'- T 138 ` 4747A~00200030016-0 d Wngrau A 25X1A 25X1A 25X1A 25X1A 25X1A 25X1A 25X1A 25X1A Approved For Release 20 98/21: CIA-RDP78094747A000200030016-0 e ~' ? he 941st f oor I I due to the heavy 25X1 A e on well 28,000 lbs.) of the instrument, which, according to made the floor loading capacity on the second floor marginal t teal that it would be desirous at the first floor level to prepare a site for part or all of the remaining snsrat on equipment presently housed in the TICS area, second floor. 3. discussed at great lengths the difficulties that would be encountered in a site preparation for this instrument on the second floor. Again, the weight factor was a major problem. A vibration tqst was recently conducted in this area and the results turned over or analysis. Their findings have dictated that a tree foot high false floor would be required to support the equipment. Since the height of the second floor (from slab to slab) is 11 feet? 3 inches, and that lights and other utilities would be required in the ceiling, the unobstructed room height for the equipment, and personnel, would be approximately 7 feet. This does not lend itself to the most desirable human factor conditions. Another reason for not placing this equipment on the second floor would be that approximately 400 square feet of floor space would be lost to operational use in that this amount of spare is required to house air handler and environmental equipment necessary for the operation of the instrument (This equipment will still be required on the first floor location, but in this area it can be locatedi the cost of a site preparation on the second floor Off the record he stated this is an a aassuwp on that a rst e~o r oa ion could probably save the Center y a substantial reduction in the size, deli. and fabrication of vibration dampers and in the actual site preparation. This statement was based on his belief that the existing floor slab could be breached and piling be driven in the packed clay underneath the first floor slab to be used as footing for the pads Of the instrument. This would Isolate the equipment from any building Vibration. Prior to verifying this statement new vibration tests will have to be conducted on the first floor. 7 An open discussion concerning the Center's epear 25X1A of the4reining portion of the old TIC) clean room during construction phase (estimated five months or more) revealed that NPIC cannot afford to be without the services of the mensuration equipment for any period of time, therefore this statement alone should negate Approved For Release 2002/088p?RDP78B04747A000200030016-0 000030016-0 Approved For Release`Lc /28 : CI A-RDP78 7~: t on the 5~~t~,l~ rhos installan of this equip ing li r i 9cea The guestiOf was asked, why were we so long resent et" the second floor would p -e- that this i a problei! contract instrument design: The first pnase l $} " 1968. 25X1 A for omplettatr the first part of January must be t4,nn for this Piece of equipment rder dues is stated that th e+ loaa so at the earliest possible date (several weeks) t an overrun ta d m so=esl up be cached withou that the final design- may h per cent of the P t 70 secide t e In addition he State hose of our are engaged in the design p due inability to successfully instant.. is lost the services of some locate a site for this 4nstTUMentl a services may be quireed l will be lost[ phase a esnt depending on the 25X1 A r for some redaastgn P instrument is a very r{uiloc&tt on chosenr He further stated that this design 25X1 A parameters complex instruasent~and that to change the be would -%--- a result of this meeting, the following reca enda As 9 , were sd+e resent that e. It was the una a .u-ca4~rsensus of those a for the dual uos r+e3rator. tend that the tars pri+~ ~.. ,,.sat # ern tests of was rand floor Were spade SLT.1alyzed in theeefInalno - effort with a mmini w.- ;.~,....,. Bent bf support env'~r nmenta duct work, and a &inisn~a dollar of deaeoliti,on, rerouting isruption to the operSti+ s of word no value, TID ifta during site still preparations* aff on the first b. It was recd enddd that consideration preparing space adjacent to the dual comp equipment of floor and nova Part or all of theasteddsmove iwould chances the TID to that location. This sugg affording a cleaner and forPiC by Mensuration catabilities for equipment operation, secondly,_.. co_ut stable environment more e for the expans+io of the - -_-- a sp c lirasently Is --- all conditions necessary Approved For Release 2002/08/28: Cif IB04747A000200030016-0 SE, Approved fpr Release 200 /0 /28-:T-CIA-RDP78B0+4 47A000200030016-0 10. For those reasons stated herein, I an orse the recosuendstions contained in paragraphs 9 a and b above, 25X1A Orig $ 1 - Addressee 3 - NPI LB BSS/LB/SS/NPI I(5 December 67) Approved For Release 2002/08/28 : CIA-RDP78B04747A000200030016-0 IS SECRET