(UNTITLED)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A000200030063-8
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
4
Document Creation Date: 
December 28, 2016
Document Release Date: 
August 9, 2002
Sequence Number: 
63
Case Number: 
Publication Date: 
January 12, 1970
Content Type: 
LIST
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A000200030063-8.pdf139.15 KB
Body: 
Approved Fpr Release 2002/08/28.: CIA-RDP78OW47A000200030063-8 E T _vT SCR i PTI ON 1 Stereo Comb, rator Fabrication IEG/F D Provide Coordinate Test Data 3 Digital input Tests Evaluate Digital Test Results n Submit Spare Parts List to TSSG/ESD 5 :iEG/PHD Provide Additional Test Data 6 Computer Driven Tests 7 PSG/AID test Data Output for Compatibility PSG/AID report results 10 TSSG/ESD contract Ifor the revised Spare Parts List 11 Final Assembly of Subsystem (less optics) 13 IEG/PHD review. and revise Operating Instruction 14 TSSG/ESD review and revise Maintenance Manual 15 IEG/PHD approve Operating Instruction Manual 16 TSSG/ESD approve Maintenance Manual Manual STATINTL 19 IEG/PHD review Operational Test Plan 20 TSSG/ESD review and revise Test Plane 21 IEG/PHD approve Operational Test Plan 22 TSSG/ESD approve Test Plan 23 IEG/PHD provide representative imagery .for pre-acceptance test 2)-v TSSG/ESD provide test targets and equipment 5 System completely checked out and ready .for,pre-acceptance test 26 Pre-acceptance test completed STATINTL STATINTL STATINTL STATINTL STATINTL STATINTL STATINTL STATINTL STATINTL STATINTL STATINTL STATINTL 27 Final design of Clean Room reviewed and approved by lFLogistics cite Preparation for TSSG/ESD review and revise Spare Parts List II submit draft of Operating and Maintenance Manuals to TSSG/DED Start final assembly submit draft of Test Plan to TSSG/DED Clean Room site completed Logistics checkout STATINTL STAT STATINTL STATINTL STATINTL Clean Room II 0 crew install cable trays, heavy wiring, etc. in Clean Room and Black Box checkout based on operation of instrument 31 Logistics provide GSA moving crew I Istarts installing the instrument in= Clean Room Approved For Release 2002/08/28 : CIA-RDP78BO4747A000200030063-8 II STATINTL STATINTL STATINTL Approved ForIlWease 2002/08/28 : CIA-RDP78BO4747AA000200030063-8 STATINTL 39 4l STATINTL 42 3 STATINTL 44 45 STATINTL46 47 STATINTL 49 A-1 A-2 Pl-E14 STATINTL of STATI NTL STATINTL STATINTL STATINTL STATINTL DESCRIPTION On-the-job Maintenance Training as instrument is installed submit dram of Programming Manual to, PHD train l G/PHD in instrument operation IEG/PHD to provide operational imagery for acceptance tests PSG/AID to have stereo and mono on-line programs ready to go PSG/AID to make maximum on-line time available from 5 August 1970 to 30 September 1970 to checkout and run acceptance tea .s on the instrument Installation complete and acceptance tests start iVPIC]acceptance tests complete Final Acceptance Test by IEG/PHD and TSSG/ESD to be completed by 10-30 submit final documentation to TSSG/DED As built drawings completed STAT. submit all reports, drawings,'ray traces; subcontractor reports, etc. 11TPIC - Contracts paykemaininp progress following dates: 30, 0 o payments , 90 days after installation Final Report on acceptance tests from IEG/PHD and TSSG/ESD to TSSG/DED Incentive Fee Awarded and contract completed Operational Tests and Training by IEG/PHD FY-70 funding provided to complete project Project out of funds if FY-70 funds is not provided 7IIsubmits monthly and technical reports to TSSG/DED. Copies provided o EG/PHD, TSSG/ESD an.d Logistics' TSSG/DED submits contract inspection reports to Contracts Administration rO complete correlation system and O r___1 to complete optical system tart acceptance tests on optics ic0 accepted O tics shipped 0 by Air Approved For Release 2002/08/28 : CIA-RDP78BO4747A000200030063-8 S run acceptance tests. STATINTL TATINTL TEG/ P1 D 7 L-, 3, 4,5,. 6, 13, 15, 19, 21, 23, 25, 26, 36, 37, 38, 41, 42, 43, 48 165 'LSD -a -in 4, 9 24 43 48 16 45 App ved For Release 2002/0 /28 : CIA-RDP78B 4747A000200030063-8 LOGISTICS PSG/AID TSSG/DED 27, 28, 29., 30, .31, 32, 33, 34, 41,-112, 43 7, 8, 39, 40 3, 4, .6, 11, 12, 18, 25, 26, 34, 41, 42, 43, 44, 46, 48, 49 Approved For Release 2002/08/28 : CIA-RDP78BO4747A000200030063-8 Approved For Release 2002/08/28 : CIA-RDP78BO4747A000200030063-8 Approved For Release 2002/08/28 : CIA-RDT 604747A000200030063-8