(UNTITLED)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A000200030063-8
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
4
Document Creation Date:
December 28, 2016
Document Release Date:
August 9, 2002
Sequence Number:
63
Case Number:
Publication Date:
January 12, 1970
Content Type:
LIST
File:
Attachment | Size |
---|---|
![]() | 139.15 KB |
Body:
Approved Fpr Release 2002/08/28.: CIA-RDP78OW47A000200030063-8
E T _vT SCR i PTI ON
1 Stereo Comb, rator Fabrication
IEG/F D Provide Coordinate Test Data
3 Digital input Tests
Evaluate Digital Test Results
n Submit Spare Parts List to TSSG/ESD
5 :iEG/PHD Provide Additional Test Data
6 Computer Driven Tests
7 PSG/AID test
Data Output for Compatibility
PSG/AID report results
10 TSSG/ESD contract
Ifor the revised Spare Parts List
11 Final Assembly of Subsystem (less optics)
13 IEG/PHD review. and revise Operating Instruction
14 TSSG/ESD review and revise Maintenance Manual
15 IEG/PHD approve Operating Instruction Manual
16 TSSG/ESD approve Maintenance Manual
Manual STATINTL
19 IEG/PHD review Operational Test Plan
20 TSSG/ESD review and revise Test Plane
21 IEG/PHD approve Operational Test Plan
22 TSSG/ESD approve Test Plan
23 IEG/PHD provide representative imagery .for pre-acceptance test
2)-v TSSG/ESD provide test targets and equipment
5 System completely checked out and ready .for,pre-acceptance test
26 Pre-acceptance test completed
STATINTL
STATINTL
STATINTL
STATINTL
STATINTL
STATINTL
STATINTL
STATINTL
STATINTL
STATINTL
STATINTL
STATINTL
27 Final design of Clean Room reviewed and approved by lFLogistics
cite Preparation for
TSSG/ESD review and revise Spare Parts List
II
submit draft of Operating and Maintenance Manuals to TSSG/DED
Start final assembly
submit draft of Test Plan to TSSG/DED
Clean Room site completed
Logistics checkout
STATINTL
STAT
STATINTL
STATINTL
STATINTL
Clean Room
II
0
crew install cable trays, heavy wiring, etc. in
Clean Room and Black Box checkout based on operation of instrument
31 Logistics provide GSA moving crew
I Istarts installing the instrument in= Clean Room
Approved For Release 2002/08/28 : CIA-RDP78BO4747A000200030063-8
II
STATINTL
STATINTL
STATINTL
Approved ForIlWease 2002/08/28 : CIA-RDP78BO4747AA000200030063-8
STATINTL
39
4l
STATINTL 42
3
STATINTL 44
45
STATINTL46
47
STATINTL
49
A-1
A-2
Pl-E14
STATINTL
of
STATI NTL
STATINTL
STATINTL
STATINTL
STATINTL
DESCRIPTION
On-the-job Maintenance Training as instrument is installed
submit dram of Programming Manual to, PHD
train l G/PHD in instrument operation
IEG/PHD to provide operational imagery for acceptance tests
PSG/AID to have stereo and mono on-line programs ready to go
PSG/AID to make maximum on-line time available from 5 August 1970
to 30 September 1970 to checkout and run acceptance tea .s on the instrument
Installation complete and acceptance tests start
iVPIC]acceptance tests complete
Final Acceptance Test by IEG/PHD and TSSG/ESD to be completed by 10-30
submit final documentation to TSSG/DED
As built drawings completed
STAT.
submit all reports, drawings,'ray traces; subcontractor reports, etc.
11TPIC - Contracts paykemaininp progress
following dates: 30, 0 o payments
, 90 days after installation
Final Report on acceptance tests from IEG/PHD and TSSG/ESD to TSSG/DED
Incentive Fee Awarded and contract completed
Operational Tests and Training by IEG/PHD
FY-70 funding provided to complete project
Project out of funds if FY-70 funds is not provided
7IIsubmits monthly and technical reports to TSSG/DED. Copies provided
o EG/PHD, TSSG/ESD an.d Logistics'
TSSG/DED submits contract inspection reports to Contracts Administration
rO complete correlation system and
O
r___1
to complete optical system
tart acceptance tests on optics
ic0 accepted
O tics shipped
0
by Air
Approved For Release 2002/08/28 : CIA-RDP78BO4747A000200030063-8
S
run acceptance tests.
STATINTL
TATINTL
TEG/ P1 D
7
L-, 3, 4,5,.
6, 13, 15, 19,
21, 23, 25,
26, 36, 37, 38,
41, 42, 43, 48
165 'LSD
-a -in
4, 9
24
43
48
16
45
App
ved For Release 2002/0 /28 : CIA-RDP78B 4747A000200030063-8
LOGISTICS PSG/AID TSSG/DED
27, 28, 29., 30,
.31, 32, 33, 34,
41,-112, 43
7, 8, 39,
40
3, 4, .6, 11,
12, 18, 25,
26, 34, 41,
42, 43, 44,
46, 48, 49
Approved For Release 2002/08/28 : CIA-RDP78BO4747A000200030063-8
Approved For Release 2002/08/28 : CIA-RDP78BO4747A000200030063-8
Approved For Release 2002/08/28 : CIA-RDT 604747A000200030063-8