HIGH PRECISION STEREO COMPARATOR PROGRAM

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A000200030067-4
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
August 9, 2002
Sequence Number: 
67
Case Number: 
Publication Date: 
September 18, 1969
Content Type: 
MFR
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A000200030067-4.pdf128.63 KB
Body: 
Approved For Release 2002/08/28 CIA-RDP78W47A000200030067-4 NPIC/TSSG/RED-1808-69 18 September 1969 ilIEMORA11DUM FOR THE RECORD SUBJECT: High Precision Stereo Comparator Program 1. A meeting of the Stereo Comparator Coordinating Group was held on 15 September 1969 in the 5S.-453 Conference Room. In attendance were representatives from: IEG/PHD, PSG/AID, PPBS, TSSG/RED, TSSG/SSD, TSSG/ESD, and TSSG/APSD._ 2. The following items were discussed at the meeting: a. The project monito n 9 and 25X1 A ndications 10 September to review the progress on the projec . are that the project is progressing just about on schedule. b TSSG/ESD was at thel plant from 8 to 25X1A 5X1 A 11 September 1969 taking on-the-job training in maintenance of the comparator . than .25 u. c. roject manager, visited . rore 4 to 14 August 1969 to moni or the progress on the o ntical subcontract. I (reports that the optics are still on schedule going through the slow tedious process of alignment and testing. They are taking extreme care with this phase of the work and three tests are made on all alignments. The image wander for the focus range ofver the objective lens has been tested and found to be less than .15 u the 3 mm. range. The specifications call for the wander to be less I still expects to have the optical system ready for acceptance tests by 15 December 1969. 25X1A 25X1A '25X1A 25X1A 25X1A 25X1A d. was to have the cor.relators ready for acceptance testing t ,d on 8 September. 1969. They have encounte d difficulties and requesed the lest be delayed until 6 October 1969 reports that they are 25X1A having trouble separating the signal from the noise plus having to replace four logic boards. e, eeds more time in interfacing the computer to the system 25X1A and has requested delay the computer programming until 25X 1 the 1st of November has about six weeks work, so this 2 5X1 should be completed by mid ecem er. This will allow adequate time to check it out prior to 15 February 1970 when the total system is assembled. Declass Review by NIMA/DOD Approved For Release 2002/08/28: CIARDP78B04747A0002000a0o67`4 ApproveddFFor Release 2002/08/28 : CIA-RDP78 747A000200030067-4 SUBU CT: high Precision Stereo Comparator Program 25X1A f discussed the recommended spare parts list with personnel rovided a list of long lead time items. 2 5X1A This includes glass platens (_ld months) ,Ioptical filters (6 months), French motors (6 months), etc=suggested that we try split funding the spare parts over several years. They also pointed out where we 25X1A might order items like the glass platens now, but not have to pay for them until a year or 18 months later. 25X1A g. =informed us that they are not exercisin their option to have maintenance people trained on theomputer and suggested that'NPIC might wish to take up is option without cost. h. Arrangements have been made and cover. orders taken care of to 25X1 train two NPIC people Ion programming the Computer . This training will take place e last two weeks of October. 25X1A i. =requested information on the black box that Logistics is building to control the air flow and temperature control for the 25X1A clean room stated that it will be completed by 1 October and it will be held a e contractors to inspect. It will 25X1A then be sent for checkout with their system. 25X1A to discuss math model and computer plans with AID, APSD, and PHD. 25X1A 3 of TSSG/SSD gave a briefing on the progress of the Clean Room and Site Preparation for the Stereo Comparator. GSA awarded a contract in mid September. The site should be ready in adequate time for the stereo comparator installation. 25X1A 4 talked about plans for testing and evaluating the stereo comparator after it is installed in 25X1A 5 out before- isit in October. for stereo programs worked 25X1A IP11G/AID says he hopes to have the data input format 6. also stated that we may have to have se arate tele- Computer. types for the Central Computer and. thel stated this would have to be decided in a hurry ecause it influence heat problem in the clean room. 25X1A 25X1A k. 11 visit NPIC either the week of 6 or 13 October 1969 Approved For Release 2002/08/28 :.CIA-RDP78B04747A000200030067-4 25X1A 25X1 25X1 25X1 25X1A 25X1 25X1A 25X1A