PRELIMINARY MAINTENANCE PLAN HIGH PRECISION STEREOCOMPARATOR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A000200030068-3
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 28, 2016
Document Release Date: 
August 9, 2002
Sequence Number: 
68
Case Number: 
Publication Date: 
September 1, 1969
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A000200030068-3.pdf141.64 KB
Body: 
Approved For ,4ease 2002/OL4:ITDP78B04740200030068-3 HIGH PRECISION STEREOCOMPARATOR 1.1 The OHPS scheduled to be installed during the last quarter of FY 70 will require emergency maintenance during the test and evaluation phase and preventive and emergency maintenance during its operational life. 2.1 The EPB/ESD/TSSG shall be responsible for providing in-house 6r obtaining contractual preventive and emergency maintenance during the instrument's operational life. Emergency maintenance, including spare parts required during the test and evaluation phase at NPIC, shall be the responsibility of the R&D contractor. M Maintenance of software shall be the responsibility of AID/PSG @kdept for standard. test or diagnostic routines used for equipment main- tenance purposes which will be the responsibility of EPB/ESD/TSSG. 2.3 Maintenance will include periodic checks for accuracy for machine 6alibration purposes. Special targets and diagnostic programs may require development under a separate contract. 2.1+ Maintenance of the HPS Clean Room.to predetermined levels shall be the responsibility of LB/SSD. Clean room environmental monitoring data shall be made available to ESD for maintenance problem analysis when necessary. 2.5 First echelon maintenance levels will be determined jointly by EPB and the operating division. 3.1 Spare parts required for preventive and emergency maintenance during the machine's operational life will be procured under contract. Procurement action will be initiated by ESD. 3.2 Spare parts storage space will be required. at the Stereocom- parator location. Three 36" X 18" double-door cabinets should be adequate for this purpose. Declass Review by NIMA/DOD Approved For Release 2oe~ A-RDP78B04747A000200030 @k?a { hn, .,!cniatt~ s ~ t,~,gr,,.rad~n; ant 25X1A 25X1A Approved Felease 2002/Qy$1El' FDP78B047000200030068-3 4. SPECIAL TOOLS 4.1 Special tools and test equipment required for maintenance purposes will be determined during the course of the development con- tract. Contractor recommendations will be reviewed by ESD. 4.2 Special tools and test equipment not included in the develop- ment contract will be procured by ESD to become part of the ESD tool and test equipment inventory. 5. MAINTENANCE DATA 5.1 Maintenance manuals and engineering data required for preven- tive and emergency maintenance and calibration shall be provided under the terms of the development contract. Manuals and engineering data will be reviewed by ESD personnel for adequacy during the development contract period of performance. 6. TRAINING 25X1A 6.1 Maintenance training for lead technicians will be acquired during periodic visits to the contractor facility during the develop- ment phase. Additional training will be acquired, during the test and evaluation phase at the Center. 6.2 Maintenance training on the omputer will be 25X1 required for two electronic specialists. Training will consist of three weeks (estimated) of instruction at a ocation and preferably 2 5X1, 11 1 two separate sessions. 6.3 Special training on the optical subsystem will be required for one optical technician, two to three weeks in February 1971970, working with personnel during optics installation and check-out I I Familiar- 25X1A ization?with procedures, including degree of difficulty, will aid decision on amount of contractual maintenance support required. 7. FUNDING 7.1 Funding (FY 70) will be required for spare parts for the Stereocomparator. Budgeting (forecasting and requisition initiation) provisions are the responsibility of ESD. 7.2 Funding (FY 70) will be required for any special tools required for maintenance and, calibration of the machine. Budgeting (forecasting and requisition initiation) provisions are the responsibility of ESD. 7.3 Funding (FY 70) for training on thel Computer 25X1 will be required. Requirements will be determined by EPB E D and TB/SSD. SECRET Approved For Release 2002/08/28 : galA-RDP78B04747A000200030068-3 Approved F aUelease 2000,8w128` ETA-RDP78BO47daAOOO2OOO3OO68-3 7.11 Funding (F 71) for contract maintenance support may be required. Budgeting provisions (forecasting and requisition initiation) are the responsibility of ESD. 8. MANPOWER 8.1 The manpower requirement for preventive and emergency main- tenance and calibration is estimated at one man-year on-a continuing basis. SECRET ILLEGIB 25X1A Approved For Release 2002/08/28 : CL/ -RDP78B04747AO00200030068-3