NPIC PROJECT(Sanitized), HIGH PRECISION STEREO COMPARATOR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A000200030105-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 28, 2016
Document Release Date: 
August 12, 2002
Sequence Number: 
105
Case Number: 
Publication Date: 
November 30, 1967
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A000200030105-1.pdf233.4 KB
Body: 
Approved F. pr Release Q OCRET CIA-RDP]IW0417A000200030105-1 /T1 B/D-1161/67 MEM?ANI?ii FCR: ' D(XJGHt Director, National Photographic interpretation Center Chief, Support Staff, NPIC 25X1 BPIC Project) l H: h Precision Stereo Ct npexator 25X1A 25X1A 25X1A t+t IC /SS Consultant 251 on 17 and 18 April 1967, 4 -4 -25X1 A s ' 3terec~ xt i .s io 3n regard to th+e High Pree 25X1 A e ation an ony condition existing 25X1 A stings were held with .Project Manager, 25X1 0 envirro enter L con ro.L c us s u v3 25X1 A ub-contractor presents the then .- f--- 25X1 1 , vibration isolators allowed adequate overhead c earart site. site. currently avaa. ,amLe vier ToAvu _.??? in the 25X1 A 0 in June 1960 and. agreed to have additimal ra 0 made 25X1 A proposed, installation site. Based upon this information reccrtend.ed a vibration isolation system a designed t e ma n ame 25X1A 25X1 A support for the comparator. Based upon this system the calculated weight in the proposed tests indicated that vibratio the new vibration tests tha 2. On 31 October 1967 28,E lbs and increase the height or the instrument 1 d NPIC and received a copy of 25X1 A he proposed site. The new were more severe than orig. 25X1 A Lion forced 25X1 A p n e ina repor to redesign the isolation mounts and main frame support. T s 25X1 A recta a to drawings and calculations only). Preliminary indications are that it will increase the weight of the instrument 6000 be to approximately ril 1967 A d i t Ion 20 25X1 A monitcsr on a v d the Technical Deve Opanen STAXr 25X1 A area Declass Review by NIMA/DOD no emoer L)Q Tu %--a4:41o? m.+.v 1'.m-.V--U----- c- repre 811tar~ informed subsequent meeting at NPIC on 21 November 1967 Orrt Staff' he Teehe re eveltp- 25X1 A tivee from the Logistics Branch of the Supp r ment staff, and the Technical intelligence Division that mart' problems would n*A a to be installed in its intended site on result if the pr the second f`l?r The more significant problems mentioned 25X1 A 25X1A Approved For Release 20 TIA-RDP78B047 #000200030105-1 Approved For Release 2002/08/28: CIA-RDP7iiB04747A000200030105-1 25X1 SUBJECT: NPIC Project NPIC/SS - NPIC/TID The new estimated weight of th a. Ibs) would be pushing the floor loading limit for the second floor. b. The depth of the required reinforced flooring coupled with the increased height of the vibration: isolation mounts (total of approximately 3 feet) sakes the overhead clearance marginal. c. The site preparation would take considerably longer-- about 6 to 9 v paths to complete. Instead of just block- ing the work area from the rest of the clean room, 25X1 A II feels. that the entire TIt7 instrument clean room would have to be closed down during this period. 25X1 A strongly recommended that a site be selected on the firs r this instrument and its attendant controlled en- or 25X1 A fl+~25X1 A vironmen a wl 11 submit a trip report and his recommend _ cramourl __j 25X1A accepting sow .. _ -- success and could prove expensive. '')S will continue to obtain data, look for other alternatives, and keep you informed. turns to NPIC/5S an or a u November 3967. 5, This information is forwarded at this time for two reasons: (1) to alert you regarding the site problem, and (2) to inform you that the required redesign of the vibration mounts and main frame could (but probably will not) result in a cost overrun on this contract. 6. With regards to the first item, the site preparation, there currently only appear to be two alternatives-(3) to find an alternate site on the first floor (whether or not this is desirable is essentially between the Support Staff and TID); and (2) make an attempt at completely redesigning the instrument to fit the 2nd floor parameters. This option would most likely require TID's __,..9 -3_ *Us ,sesnhoh414 tv ?af 25X1A Oarig 1 7. With respect to the second item, the present redesign will, of course, money but the contract is currently in an undo xn status (i.e., they will s not probable.. t i l ld o re funds the fore; while an overrun cou . t s word lento they can handle it within the contract but a Ccnirac Col .. _ x.._. a m or may not be willing H ay e in that extent. recision Stereo Comparator NPICIP&M - IC/A:/TD 3 - NPIC/A/TD/DS Approved For Release 2002/08/28 CIA-RDP78BO4747A000200030105-1 Approved % wt Release 2002/08/28: CIA-RDPM6W7A000200030105-1 25X1A 2/$7,9z6 k.Law /?,c q5 u I -r-aw S 7'c fit- sT,9CC 25X1 Approved for Release 2002/08/28 CIA-RDP78B04747A000200030105-1-