NPIC PROJECT(Sanitized), HIGH PRECISION STEREO COMPARATOR
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A000200030105-1
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
3
Document Creation Date:
December 28, 2016
Document Release Date:
August 12, 2002
Sequence Number:
105
Case Number:
Publication Date:
November 30, 1967
Content Type:
MF
File:
Attachment | Size |
---|---|
CIA-RDP78B04747A000200030105-1.pdf | 233.4 KB |
Body:
Approved F. pr Release Q OCRET CIA-RDP]IW0417A000200030105-1
/T1 B/D-1161/67
MEM?ANI?ii FCR:
' D(XJGHt
Director, National Photographic interpretation Center
Chief, Support Staff, NPIC
25X1
BPIC Project)
l
H: h Precision Stereo Ct npexator
25X1A
25X1A
25X1A
t+t IC /SS Consultant 251
on 17 and 18 April 1967, 4 -4 -25X1 A
s
'
3terec~
xt
i
.s
io
3n regard to th+e High Pree
25X1 A
e ation an ony condition existing 25X1 A
stings were held with .Project Manager, 25X1 0
envirro enter L con ro.L c us s u v3 25X1 A
ub-contractor presents the then
.- f--- 25X1
1 ,
vibration isolators allowed adequate overhead c earart
site.
site.
currently avaa. ,amLe vier ToAvu _.??? in the 25X1 A
0 in June 1960 and. agreed to have additimal ra 0
made 25X1 A
proposed, installation site. Based upon this information
reccrtend.ed a vibration isolation system a designed t e ma n ame 25X1A
25X1 A
support for the comparator. Based upon this system the calculated weight
in the proposed
tests indicated that vibratio
the new vibration tests tha
2. On 31 October 1967
28,E lbs and increase the height or the instrument 1
d NPIC and received a copy of 25X1 A
he proposed site. The new
were more severe than orig. 25X1 A
Lion forced 25X1 A
p
n
e
ina repor
to redesign the isolation mounts and main frame support. T s 25X1 A
recta a to drawings and calculations only). Preliminary indications are
that it will increase the weight of the instrument 6000 be to approximately
ril 1967
A
d i
t
Ion 20 25X1 A
monitcsr on a v
d the Technical Deve Opanen STAXr 25X1 A
area
Declass Review by NIMA/DOD
no emoer L)Q Tu %--a4:41o? m.+.v 1'.m-.V--U----- c- repre 811tar~
informed
subsequent meeting at NPIC on 21 November 1967
Orrt Staff' he Teehe re eveltp- 25X1 A
tivee from the Logistics Branch of the Supp r
ment staff, and the Technical intelligence Division that mart' problems would
n*A a to be installed in its intended site on
result if the pr
the second f`l?r The more significant problems mentioned 25X1 A
25X1A
Approved For Release 20 TIA-RDP78B047 #000200030105-1
Approved For Release 2002/08/28: CIA-RDP7iiB04747A000200030105-1
25X1
SUBJECT: NPIC Project
NPIC/SS
- NPIC/TID
The new estimated weight of th
a. Ibs) would be pushing the floor loading limit for the
second floor.
b. The depth of the required reinforced flooring
coupled with the increased height of the vibration:
isolation mounts (total of approximately 3 feet) sakes
the overhead clearance marginal.
c. The site preparation would take considerably longer--
about 6 to 9 v paths to complete. Instead of just block-
ing the work area from the rest of the clean room,
25X1 A II feels. that the entire TIt7 instrument clean
room would have to be closed down during this period.
25X1 A strongly recommended that a site be selected on the firs
r this instrument and its attendant controlled en-
or
25X1 A fl+~25X1 A vironmen a wl 11 submit a trip report and his recommend _ cramourl __j
25X1A
accepting sow .. _ --
success and could prove expensive. '')S will continue to obtain data, look for
other alternatives, and keep you informed.
turns to NPIC/5S an or a u November 3967.
5, This information is forwarded at this time for two reasons: (1) to
alert you regarding the site problem, and (2) to inform you that the required
redesign of the vibration mounts and main frame could (but probably will not)
result in a cost overrun on this contract.
6. With regards to the first item, the site preparation, there currently
only appear to be two alternatives-(3) to find an alternate site on the first
floor (whether or not this is desirable is essentially between the Support Staff
and TID); and (2) make an attempt at completely redesigning the instrument to
fit the 2nd floor parameters. This option would most likely require TID's
__,..9 -3_ *Us ,sesnhoh414 tv ?af
25X1A
Oarig 1
7. With respect to the second item, the present redesign will, of course,
money but the contract is currently in an undo xn status (i.e., they will
s not probable..
t i
l
ld
o
re
funds the fore; while an overrun cou
. t s word lento
they can handle it within the contract but a Ccnirac Col
.. _ x.._.
a m
or may not be willing
H
ay
e
in
that extent.
recision Stereo Comparator
NPICIP&M
- IC/A:/TD
3 - NPIC/A/TD/DS
Approved For Release 2002/08/28 CIA-RDP78BO4747A000200030105-1
Approved % wt Release 2002/08/28: CIA-RDPM6W7A000200030105-1
25X1A
2/$7,9z6 k.Law
/?,c q5 u I
-r-aw S 7'c fit- sT,9CC
25X1
Approved for Release 2002/08/28 CIA-RDP78B04747A000200030105-1-