NOTICE: In the event of a lapse in funding of the Federal government after 14 March 2025, CIA will be unable to process any public request submissions until the government re-opens.

NPIC PROJECT(Sanitized) HIGH PRECISION STEREO COMPARATOR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A000200030109-7
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 28, 2016
Document Release Date: 
August 12, 2002
Sequence Number: 
109
Case Number: 
Publication Date: 
November 30, 1967
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A000200030109-7.pdf236.55 KB
Body: 
THROUGH Approved For Release 20o1 IA-RDP781%14747A000200030109-7 rector, Nstt0flal Photogri ief, Support Staff, NPIC High Precision Stereo Comparator NPIC Project /D-1161-67 November 1967 phic InterpretationCenter gard o the vioration an were held withl ntal control actor to brat on info 0 and agreed to have t ion site. Based upon this infoimS- tion isolation system andMdeigflOd the main frame uppo for the Or. Based upon this system the calculated weight estimate for the instrUmflt was 22,000 lbs. The proposed one foot high vibration isolators allowed adequate overhead clearance in the proposed site. 2. On 31 October ksitd NPIC and received a copy of the new vibration tests that weio ierf od in the proposed site. The new tests indicated that vibrations I were more severe than orig- inally reported in April 1967. This new information forced Ito redesign the isolation mounts and main fres* support. (This re- lates to drawings and calculations only). Preliminary indications are that it will increase the weight of the instrument 6000 lbs to approximately 2$,000 lbs and increase the height of the instrument I foot. Cf SS Consultant f monitor on a yj5it to the High Precision Stereo condition exist ng Let, on vember 1067 to discuss site preparation plans roJ a 3. I again visited In subsequent meeting at NPIC on 21 November 19671 1inormed representa- tives from the Logistics Branch of the Support Staff, he Technical Develop- ammt Staff, and the Technical intelligence Division that many problems would result if the proposed instrument is to be installed in its intended site on2255xXi1A are: A rtheendfloor The more significant problems mentioned 25X1A 20 25X1 25X1 25X1A 25X1A 25X1A 25X1 25X1A 25X1A 25X1 25X1 25X1 25X1 25X1A 25X1 25X1A 25X1A 25X1A 25X1A 25X1A 25X1A 25X1A 25X1A 25X1A Declass Review by NIMA/DOD Approved For Release 2002/08/28 : CIA-RDP78604747A000200030109-7 SECRET ORCUP 1 WW1 two aptemalic dasyngraIrtg 25X1 25X1A 25X1A 25X1A Approved For Release ECBEICIA-RDP781304747A000200030109-7 we NPIC Project a. estimated we be pushine the V. Ste f the in r loading depth of the required reinforced floo with the increased height of the vlbra on mounts (total of approximately 3 feet) head elearance marginal. ite preparstion would take considerehl longer- months to complete. Instead of just block- work nre$ from the rest of the clean room, is that the entire TID instrument clean Ins to be closed down during this period. strongly recommended that a site be selected on the first this instrument and its attendant controlled en- tal ehanberkilt submit a trip report and his recommends- NPIC/SS on or about November 1967. S. This information is forwerded at this time for two reuon5: (1) to u regarding the site problem, and (2) to inform you that the revived ien of the vibration mounts and mein frame could (but probably will not) t in a cost overrun on this contract. 6. With regards to the first item, the sits preparation, there currently only appear to be two alternatives--(l) to find an alternate site on the first floor (whether OT not this is desirable is essentially between the Support Staff end TID); and (2) make an attempt at completely redesigning the instrument to fit the 2nd floor paraweters. This option would most likely require TID's eceepting 9090 VOillOtiOn in specifications, would decrease the probability of success and could prove expensive. TDS will continue to obtain data, look for other alternatives, and keep you informed. 7. With respect to the second tt051, the present redesign will, of course, money but the contract is currently in an underrun status (i.e., they will funds)cost returli therefore, while an overrun could result,it is not probable. 25X1 can handle it within the contract but a Contractor*, word is no We have asked for it is writing. He may or may not be willing real a,s.bi!aUco. If to that extent. (23,000 for the 25X1A Dist io 1 - NPIC/P Ovig - Adayessee vl Newss _ oiciAns 3 - NPIC/A/TII/DS NPICrrn Approved For Release 2002/08/28 : CIA-RDP78604747A000200030109-7 SECRET ? - CENTER I: 'TING SLIP Approved For Release 70n9ing1T8 : CIA RDr7 1304747Auuuzu00301 DATE 30 November 67 FROM TD S TO INITIALS DATE DIR DEP/DIR EXEC/DIR TECH ADV SPECIAL ASST CH/SS ASST FOR P&M ASST FOR OPS ASST FOR PA ASST FOR TD CH/CSD CH/IPD CH/PD CH/PSD CH/TID CH/IAS/DDI CH/DIA/XX-4 CH/DIA/AP-I P CH/SPAD S/CI LO/NSA IP FM 30 (2-67) - DESTROY PREVIOUS EDITIONS REMARKS 9-7 8 : CIA-RDP78604747A000200030109-7