RED MONTHLY REPORT (JULY 1971)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A000300020017-9
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
8
Document Creation Date: 
December 28, 2016
Document Release Date: 
April 17, 2003
Sequence Number: 
17
Case Number: 
Publication Date: 
August 5, 1971
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A000300020017-9.pdf421.26 KB
Body: 
Approved For Release 2003/05/15 : CIA-RDP78BO4747A000300020017-9 Approved For Release 2003/05/15 : CIA-RDP78BO4747A000300020017-9 Approved 25X1 5 August 19-71 Copy MEMORANDUM FOR: Chief, Technical Servic es Group, NPIC ATTENTION : Chief, Technical Operat ions Staff, TSG/NPIC SUBJECT : RED Monthly Report (Jul y 1971) Significant Items of Interest for July 1971: 1. Scan & Search PI Station - performed the acceptance tests on the optical system Tor tiu s ins rumens 2 5X1A during the first part of the month. The optics 25X1A w e s ipp the last week of July. This program is on schedule. 25X1 25X1A 25X1 2. Dr Color Reproduction Materials Program 2 5X1iA has succeeded in producing the first laboratory run of materials with three color layers. There was a little bleeding of the yellow dye, but this first effort was most encouraging. Tests indicate that the speed of this material is about the same as black-and-white dry silver. The material tested resolved the full 228 lines per millimeter of a high contrast target when reproduced using contact printing. 3. 10" by 10" Stereo Comparator - Preacceptance tests were per- 25X1A formed during July at the facility and the instrument failed to meet several optical spec ications. The contractor expects to have the deficiencies corrected so that tests can resume in early August. 4. High Precision Stereo Comparator - The installation of this instrument at NPIC has fallen several weeks behind schedule due to problems Logistics has encountered in controlling the temperature and humidity of the clean room site. Final alignment of the instrument cannot be accomplished until the environmental factors are brought under 25X1A control. as submitted a request for compensation for the costs they have incurred in standby waiting for the clean room to be brought within specifications. 25X1A S. Light Table -demonstrated fixes that could 25X1A be made o mee e DIA requirements for use of a table for mensur- 25X1 ation. The proposed modification appears to fill the IA requirement. 2 5X1 The demo st t4 ?4 e.-A b f 'ref, tar' l d "'. n ra on was rom AS an y person a aowngrainng and For Release 2003/91~f5 ::~4~A78B047.?AA000300020017-9 "~~ SECRET Approved For Release 2003/05/15 : CIA-RDP78B04747A000300020017-9 Approved For Re 25X1 25X1A 6. The UV Rear Pro a tion Viewing System Evaluation has been completed NPIC and contractor photo interpreters were used in ti u n. he project report will be available next month. 25X1 7. The filar eyepiece developed for the Zoom microscope is 25X1 currently undergoing operational suitability tests n EG. 25X1 A a. (ESD) performed the preaccepta t on a Contrast Doubler Image Viewer prototype at 25X1A This prototype unit will be delivered to NPIC during August for test and evaluation by ESD and the operational components. 25X1A 25X1A 25X1A 25X1A 25X1 D 9. emonstrated the improved vibration characteristics which could be obtained on the Light Table utilizing designed modifications to t e optical mount and bridge. A change-in-scope is contemplated in this contract to afford some further design changes. 10. Optical image Manipulation - The interactive OIM microscope has been delivered It is undergoing tests in t %,m TTr/ATR 11. Renewal of the 0 tical Sciences Support contract has been approved at a cost of from PY-71 funds. Effective dates of the contract are 1 April 197 March 1972. Tutorial sessions on co erence. m d n i metr Photometry, and lens design will be conducte for NPIC per- sonnel during the course o the contract. 25X1 25X1 25X1 13. Optical Power Spectrum Phase II - Status reports were given 25X1 to thel community representatives. Data was collected using the 2 5X1 Dupe Material tudy imagery. Results indicated the OPS technique agrees with P.I. judgments. iOP, SECRET SECRET ease 2003/05/6:CIA- 8047 A000300020017-9 Approved For Release 2003/05/15 : CIA-RDP78B04747A000300020017-9 Approved or , elease 2003/05/CIA8B047 A000300020017-9 25X1 25X1 25X1A 14. Personnel Visit NPIC for Program ev ew visited NPIC to discuss the color Equipment Investigation Program. While they were here, they discussed a special color matching problem 25X1A with DDP/TSD; they were also briefed on operational clearances in prep a n for the consultation task of the contract. 25X1 Based on the discussions a trip will be made in August 25X1 25X1 is. isited ATB to set up the test plan for the first test of unconventional films. The test plan will be submitted to ATB for approval during August. After approval, the tests will be started; measurements of speed, reso- lution, contrast control, and coating uniformity will be made on dry silver, diazo, free radical and other unconventional films. 16. Imagery Ex erimentation Support - The T$M contract with 2 5X1A 1-7 was complet 30 June. The last phase of the con- tract supported the Arms Control and Disarmament Agency's program to determine activated missile sites with reconnaissance photography. 25X1A 25X1A 25X1A 25X1A 17. completed a personal services contract on 30 June with the submission of data from an extensive stereo-vision testing po ram conducted under his supervi 'o he program is a follow-on to stereo test development program. A new contract request will be sub- mitted in mid-August. l8. 1has requested =supplemental funding and a no-cost, time-only extension to complete work on their program, "Training Needs Associated with Color Photography," 19. Diagnostic Computer RoutineL Partial delivery has been made on the programs and documentation manuals. A change-in-scope for the remaining programming effort has been proposed and is still under consideration. 20. Non-Computerized Information Handling Study] I - The contract has been negotiated and we are now awaiting clearance of the appropriate ersonnel. However, control of the pro- gram has been transferred to PSG; RED's role will be limited to providing consulting services relating to the technologies involved and contractual monitorship. 21. Stereo Scanning Utility Study personnel actively started the preparation phase o is s u y uran July. The work area assigned and equipped for this task is in APSDI former office). 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 TOP SECRET Approved For Release 2003/05115 : CIA-RDP78B04747A000300020017-9 Approved For Rel 25X1 ase 2003115W~P78B0477A000300020017-9 22. Wide-Field, High-Power Anamorphic Stereoviewerl After a lengthy period of inactivit on this project (due to uncer- tainty about costs to complete)I has been directed to proceed with the bench test of one complete optical path. In addition, they will start procurement of components needed for final fabrication subsequent to, and dependent upon, a successful bench test. 23. Image Comparison Microstereoscopel JPredelivery acceptance was delayed in order to make sev a minor last-minute fixes and adjustments. Current plans are that these fixes will be completed and the instrument will be delivered on 13 August to NPIC. 24. CRT Image uality Studyl This contract was effective as of 15 July. The first tasks (now underway) are procurement and assembly of test hardware and the detailed definition of the test programs. IEG personnel are actively involved in the latter. A detailed test program should be ready for NPIC approval about the middle of August. 25. Viewing stems UandbookI Delivery of Volume I is expected in early August and will be distributed shortly thereafter. Work on Volume II has commenced. 26. Target Indexing Device Implementation (In-douse) - The TID is undergoing T#E, acceptance is expected shortly. Modifications to the software will be made soon by the contractor. This corrective rogram is being delayed Wending annroval of a maintenance contract 28. Automated Coordinate Study has been slow due to the move Work on this project 25X1A Ifowever, the purchase and assembly o equipment neces- sary for the study is progressing. ET 25X1 25X 25X 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 A D Approved For Release 2003/05/15 : CIA-RDP78BO4747A000300020017-9 Approved IF 25X1 25X1A 25X1A 25X1A release 2003/05 PC 22. Meetings, Briefings, etc.: a. On 13 Julyl attended a coordination meeting at HADC on e e ro-rectifier being developed for the Air Force. b. I Idemonstrated the on-line computer capability of the new NPIC Contract Information Program to RED Branch Chiefs on 20 July and on 26 July. This system is currently u, y n er ace with the DDS&T Contract Information System. 25X1 25X1 25X1A C. demonstrated the progress achieved in the automatic pointing task of Contract to IEG/PHD, TSG/APSD, and TSG/RED.personnel. A signifa.c improve- ment in the edge pointing mode was noted. d. As a result of the briefing given by the AFSPPF, Westover AFB, to the Color Task Force on the production of black- and-white reproductions from original color acquisition film on 30 July, a meeting was held between the Air Force representative and the Exploratory Laboratory. Because of the mutual interest in this system, it is expected that a joint-in-house research effort will be initiated. 25X1A 25X1A 25X1 e. Personnel from TSD were shown the -If iprocessor. 25X1 The unit has a number of features desirable for the types of processing required by them, and they may be interested in purchasing one with some modifications. f. On 8-9 July kttended the Color Technology for Management course The course covered se -up, contro , and costs associated with color measurement for suppliers and users of colored materials. g. On 9 July total rev ew or tne v program work, as we as an overview of optical power spectrum results to date, was presented and to attending DDSLT personnel. TOP SECRET Approved For Release 2003/05115 : CIA-RDP78B04747A000300020017-9 B04747A000300020017-9 25X1 25X1 25X1 25X1 25X1 TOP SECRET 25X1 25X1A 25X1A Approved F conducted the following briefings: 1) On 8 July, the NPIC ou Chiefs were briefed on the proposed FY-72 Imagery Interpretation Re- search Program. The Acting Executive Director, NPIC, was briefed on 9 July, and the Executive Director, `NPIC will be briefed early in August. 2) On 19 July, representatives from the Clinical Division, Office of Medical Services, were briefed on the Center's Vision Testing Program. Follow-on meetings with IEG and Center management are tentatively scheduled for mid- August. 3) On 22 July, the Chief, DIA-8, and his staff were briefed on the Center's Vision Testing Program. DIA subsequently requested NPIC support in conducting a stereo-vision test with materials developed under the Imagery Inter- pretation Research Program. The o r m began 26 July under the supervision ofrt2ilim ATB/HFS summer intern. i. On 28 July, the EXRAND members were briefed on the PI and PG Training Program. DIA-8 staff and DIA analysts will be briefed at the Pentagon on 3 August. J. On 23 July, APSD personnel were briefed on the final results of the PI phase of the Emulsion Evaluation Program. Exten- sive series of briefings will be given Center and community management through 16 August. k. On 6 Jul-, Chief/ATBI visited to investigate their oss i ties as a potential o ow-on contract in the ontract area has an impressive capability which Includes 10 ^ photo- interpreters, a fully cleared vault area, dedicated computer, and considerable work in the image processing area, similar to that being done 23. Training: a. From 12-23 July, I lattended an intensive short cours in Design and A-1-zig of 'neering Experi- ments given[ I This training was very effective because it emphasized the application of statistical methods to practical problems. Several short-cut and small sample size statistical tests were presented. 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1 25X1' 25X1 25X1 TOP SECRE1" Approved For Release 2003/05/15 : CIA-RDP78B04747A000300020017-9 Approved For Release 200 P5 M P78BO4747A000300020017-9 qwwSE 25X1 25X1 25X1A 25X1A 25X1A attended the one-week course Advanced Color Measurement aspects o co orimetry, color difference calculation, and color specification in both classroom and laboratory sessions. This course tun der the direction described in detail many of the Deputy Chief Research & Engineering Division, TSG/NPIC 25X1A 25X1 10? SECRET Approved For Release 2003/05/15 : CIA-RDP78BO4747A000300020017-9