CONTRACT INSPECTION REPORT

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A000300030016-9
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
October 24, 2001
Sequence Number: 
16
Case Number: 
Publication Date: 
May 8, 1965
Content Type: 
CONT
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A000300030016-9.pdf77.73 KB
Body: 
^ SECR Tr9_I____ CON RA T - TAS:ON 0. CONTRACT INSPECTION REPORT 25X1 TO: DATE a x" 1%5 ENGINEERING SECTION/CB/PD/OL INSPECTION REPORT NO. (If final, so state) ESTIMATED COMPLETION DATE am 1%s NAME OF CONTRACTOR TYPE OF COMMODITY OR SERVICE Auto V `r Tjj% c estor THE CONTRACTOR IS ON SCHEDULE THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED FUNDS ^ YES ND IF ANSWER IS "NO" ADVISE REC? ^ Y ES NO OMMENDATION AND OR ACTION OF SPONSORING OFFICE. ON REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD- PER CENT OF WORK COMPLETED ? DITIONAL FUNDS INVOLVED. PER CENT OF FUNDS EXPENDED HAS AN INTERIM REPORT, FINAL REPORT, PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING THE PERIOD?, 11 YES El No (If yes, give details on reverse side.) HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? ^ YES El No (If yes, indicate items, quantity, and cost on reverse side.) INCENTIVES IS THIS AN INCENTIVE CONTRACT ^ YES fJ No NOTE: IF YES, CHECK TYPE USE REVERSE SIDE FOR COMMENTS. D COST ^ PERFORMANCE ^ DELIVERY FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. OVERALL PERFORMANCE OF CONTRACTOR 1. ^ OUTSTANDING 3. 1:1 ABOVE AVERAGE S. ^ BELOW AVERAGE 7. 1:1 UNSATISFACTORY 2. ^ EXCELLENT 4. El AVERAGE 6. ^ BARELY ADEQUATE IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE, INDICATE REASONS ON REVERSE SIDE. RECOMMENDED ACTION CONTINUE AS PROGRAMMED ^ WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE ^ TERMINATE ^ OTHER (Specify) IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE, WHERE APPLICABLE. THE FOLLOWING: ITEM REC D DOES NOT ITEM REC'D DOES NOT APPLY APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER SPECIAL TOOLING END ITEMS OTHER GOVERNMENT PROPERTY DATE OF LAST CONTACT WITH CONTRACTOR Zi a 1965 SIGNATURE OF INSPECTOR DIVISION TIMIS INSPECTOR'S EXTENSION SIGNATURE OF APPROVER FORM 1897 P EVIOUS O PRE 1Q?64 EDITION [] UNC LASS I F I ED Q CONFIDENTIAL . [] SECRET (12.36) Qpc.Ia RRavi w, b&.(NM7T?9GO 00300030016-9 ^ SECRET D CONFIDENTIAL ^ UNCLASSIFIED Approved For Release 2001/11/07 CIA-RbP 8BO4747A000300030016-9 NARRATIVE REPORT [ INTERIM ^ FINAL Czs i ate two 'ebb Id .e. A rftWI ion and a Ong lnm*aSe of teI _ is 25X1 A cortxactor as cuxi;. hi8 vd t there [I UNCLASSIFIED ^ CONFIDENTIAL ^ SECRET Approved For Release 2001/11/07 : CIA-RDP78BO4747A000300030016-9