CONTRACT INSPECTION REPORT

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A000300040016-8
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
October 12, 2001
Sequence Number: 
16
Case Number: 
Publication Date: 
July 19, 1965
Content Type: 
FORM
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A000300040016-8.pdf103.31 KB
Body: 
C3 SECREj, fill CnNF I D NT I AL 1j, C] UNCLASSIFIED nnrov CONTRACT INSPECTION REPORT ENGINEERING SECTION/CB/PD/OL DATE 19 25A 1A INSPECTION REPORT NO. (If final, so state) ESTIMATED COMPLETION DATE 1 October 1965 Z~om Tube Magnifier Prototype THE CONTRACTOR IS ON SCHEDULE ^ YES PER CENT OF WORK COMPLETED PER CENT OF FUNDS EXPENDED - THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED FUNDS 0 YES ^ NO IF ANSWER IS "NO" ADVISE REC- OMMENDATION AND/OR ACTION OF SPONSORING OFFICE. ON REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD- DITIONAL FUNDS INVOLVED. [A.- HAS AN INTERIM REPORT, FINAL REPORT. PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING THE PERIOD?, ^ YES [M NO (If yes, give details on reverse side.) ^ YES NO HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? (If yes, indicate items, quantity, and cost on reverse side.) YES ^ NO IS THIS AN INCENTIVE CONTRACT IF YES. CHECK TYPE ^ COST [a PERFORMANCE ^ DELIVERY NOTE: USE REVERSE SIDE FOR COMMENTS. FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. 1. ^ OUTSTANDING 3. ^ ABOVE AVERAGE 5. 51 BELOW AVERAGE 7. ^ UNSATISFACTORY 2. EXCELLENT ... 4. ^ AVERAGE 6. ^ BARELY ADEQUATE ^ ~ IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE, INDICATE REASONS ON REVERSE SIDE. 10 CONTINUE AS PROGRAMMED ^ WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE ^ ^ OTHER (Specify) TERMINATE IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE, WHERE APPLICABLE. THE FOLLOWING: ITEM PROTOTYPES DRAWINGS AND SPECIFICATIONS PRODUCTION AND/OR OTHER END ITEMS RECD I DOES NOT APPLY DATE OF LAST CONTACT WITH CONTRACTOR i# July 1965k nt.torif9 trip FORM U S E 10-64 IRq ""7 PREVIOU E (DOES NOT RECD APPLY 25X1A, ^ UNCLASSIFIED CONFIDENTIAL ^ SECRET (12.36) Approved For Release 2001/11/19 : CIA-RDP78BO4747A000300040016-8 25X1A 25X1A ^ SECRET E CONFIDENTIAL Approved NRkRAe11?qpe PO'RT1/19 : CIA-RDPT ^ UNCLASSIFIED NTERIM ^ FINAL On 7 July 1965, a monitoring trip was made to _ to determine- wt-at improvements could be made to the present deaiWl to improve the field curvature situ tioaz and expand the actual. (xsabie field of view. was info cd thalt the monitor r eidered the tube mi-Lipifier to be basically unacceptable and instructed V-~clm to determine what they intended to do to rectify ti,-,c situation within the term of the present contract, We will see, on our part,, what changes we can p