CONTRACT INSPECTION REPORT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A000300060004-9
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
March 21, 2001
Sequence Number:
4
Case Number:
Publication Date:
June 3, 1965
Content Type:
FORM
File:
Attachment | Size |
---|---|
![]() | 79.02 KB |
Body:
25X1A
25X1A
^ SECRE
?
CONTRACT NO.
TASK NO.
CONTRACT INSPECTION REPORT
25X1 A
TO:
DATE
3 0 1965
ENGINEERING SECTION/CB/PD/OL
INSPECTION REPORT NO. (If final
so state)
,
ESTIMATED COMPLETION DATE
15 Jay 1965
NAME OF CONTRACTOR
TYPE OF COMMODITY OR SERVICE
#.,.d S! tsitk'~'j;r 2`A
THE CONTRACTOR IS ON SCHEDULE
THE CON ACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
^ YE
?
FUNDS tj YES ^ NO IF ANSWER IS "NO" ADVISE REC-
NO
S
OMMENDATION AND/OR ACTION OF SPONSORING OFFICE
ON
.
REVERSE HEREOF. IF KNOWN, INDICATE MAGNITUDE OF AD-
PER CENT OF WORK COMPLETED
DITIONAL FUNDS INVOLVED.
PER CENT OF FUNDS EXPENDED - ^4>`"i
HAS AN INTERIM REPORT. FINAL REPORT. PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
DURING THE PERIOD?, ^ YES [M NO (If yes, give details on reverse side.)
HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? ^ YES Ej NO
(If yes, indicate items, quantity, and cost on reverse side.)
INCENTIVES
IS THIS AN INCENTIVE CONTRACT ^ YESj! K] No
NOTE:
IF YES, CHECK TYPE
USE REVERSE SIDE FOR COMMENTS.
^ COST ^ PERFORMANCE ^ DELIVERY
FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION.
OVERALL PERFORMANCE OF CONTRACTOR
1 ^ OUTSTANDING 3. a ABOVE AVERAGE 5. ^ BELOW AVERAGE 7. ^ UNSATISFACTORY
2. ^ EXCELLENT 4. ^ AVERAGE 6. ^ BARELY ADEQUATE
IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE, INDICATE REASONS ON
REVERSE SIDE.
RECOMMENDED ACTION
rwi
CONTINUE AS PROGRAMMED ^ WITHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
^ TERMINATE ^ OTHER (Specify)
IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE
FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN
RECEIVED. THESE INCLUDE. WHERE APPLICABLE, THE FOLLOWING:
ITEM
RECD
DOES NOT
ITEM
REC'D
DOES NOT
APPLY
APPLY
PROTOTYPES
MANUALS
DRAWINGS AND SPECIFICATIONS
FINAL REPORT
PRODUCTION AND/OR OTHER
SPECIAL TOOLING
END ITEMS
OTHER GOVERNMENT PROPERTY
DATE OF LAST CONT 'C 30Y CONTRACTOR
SIGNATURE OF INSPECTOR
DIVISION
yam
INSPECTOR'S EXTENSION
SIGNATURE OF APPROVER
3O8
FORM USE
10.64 1897 PREVIOUS
EDITION
Ap
^ UNC LASS I F I ED ] CONFIDENTIAL
^ SECRET
nqq~
ro"
lm @iSI?e i1(04)690!6~PAWP78B04747A000300060004-9
NCLASSIFIED
^ SECRET
[ CONFIDENTIAL ^ UNCLASSIFIED
Approve j RXj%e 001/04/02: Cl
~4-RDP18B04 M47A000300^060004-9 FINAL
have bsi delivered but tau k
ram owe of the three film pwk
4th. A prototype da*t all hse boom
the thii-Ad t this ao tradt i be mete.
am* A" b ao *ieae the lam regort.
cmxormtl,v being madif d. US= ao4i c t
a to b* c*"W. A , sc :
iaeciporated an we or the tb;t s pssict u it;n
25X1
^ UNCLASSIFIED
Q CONFIDENTIAL
^ SECRET
Ap roved For Release 2001/04/02 : CIA-RDP78BO4747A000300060004-9