MONTHLY REPORT - RECTIFIER PROJECT, T.O. 2
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A000600080011-6
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
7
Document Creation Date:
December 28, 2016
Document Release Date:
February 8, 2002
Sequence Number:
11
Case Number:
Publication Date:
March 4, 1960
Content Type:
LETTER
File:
Attachment | Size |
---|---|
![]() | 300.08 KB |
Body:
STATINTL
Approved Forngelease 2002/06/17 : CIA-RDP78130470006000800 1-6
4 March 1960
P. 0. Box
Washington 4, D. C.
Subject: Monthly Report - Rectifier Project, T. 0. 2
Enclosures: (1) Report of Technical Progress
(2) Estimated Cost Status
(3) Work Schedule and Progress Chart
(4) Phase Diagrams for Reader, Printer and Control Console
The above Hated enclosures represent the state of progress of the subject
project as of 1 March 1960. You will note on Enclosure (3) that the over-
all work effort progressed as scheduled during the mouth of February.
An information copy of this report is being submitted directly to the
Contracting Officer.
Very truly yours, STATINTL
/pb
Declass Review by NIMA/DOD
Approved For Release 2002/06/17 : CIA-RDP78BO4747A000600080011-6
STATINTL Previous mention was made of the possibility that the
lnductosyn might be substituted for the film index transducer. ina decision was
reached to select this alternate and the Inductosyn is presently scheduled for delivery
? 0 about the middle of March.
STATINTL The problem in procurement of the
reporting has been satisfactorily resolved.
Since assignment of a new engineer to the video and sweep circuit, redesign
of the latter has been completed and it has been bread-boarded and tested using the
engineering model circuitry. The schedule for completion of this effort, as amend-
ed by the last report, appears to be practical. STATINTL
Approved FoR (ease 2002/06/17: CIA-RDP78B0474'000600080011-6
PHOTOGRAPHIC RECTIFIER
Report of Technical Progress
STATINTL
F/2 lens discussed at last
A firm quotation has been received from
and an order will he placed next. week. However, since delivery of
these lenses will be a minimum of (4) four months, it may be necessary to'complcte
the first rectifier unit using the
In this event,
STATINTL
F/2 lens suggested previously.
these units would be replaced upon receipt of the
STATINTL
One of our vendors failed to produce a satisfactory transformer. It was
deemed desireable to cancel this order completely in lieu of a new design at. some
added cost. This design has been completed and is presently undergoing tests. An
additional problem still to be solved in this area is to determine whether the new de--
cign can be applied in the relay control system.
The automatic dodging circuitry represents the only major function remaining
to be designed. Preliminary investigation indicates that a magnetic memory will
provide the best storage for dodging data on retrace. No insurmountable problems
are visualized in this area.
During the month of March it is anticipated that assembly of the reader will be
completed and testing will commencte, The printer should be nearing completion
around the middle of April. Progress on the control console is expected to advance
more rapidly during the next few weeks as a result of the application of extra effort
to this unit. All purchased parts for the first control console should be on order by
the end of March.
STATINTL
System Manager
Enclosure (1)
Approved For Release 2002/06/17 : CIA-RDP78B04747A000600080011-6
ASSEMBLY
Structure
C.R.T. Housing
C.R.T. Elect Parts
Track Assembly - X Drive
Lead Screw
P.M.T. Drive
Platen and Index Assembly
Transducer
P. M.
Valve - Pneu. and Vac.
Doors
X Deflection Amp
Y Deflection Amp
Focus Current Regulator
I KV. (for P. M. )
20 KV.
Optisyn Pre - Amp
PRE DESIGN
Complete
Complete
Complete
Complete
Complete
Complete
Complete
In Work
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
1' HA E2106`l1~} -DP78B
UU
Approved For Release R O47447A000600080011-6
3/'l/O}0
DESIGN COMPLETE RELEASED
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Schein. Complete
11 Layout Start
Schem. Complete
II Layout Start
Complete
Complete
Complete
Complete
PURCHASED
PARTS FABRICATION ASSEMBLY TEST AND REMARKS
Complete Complete One Complete In Work
Complete Complete One Complete One Complete
One Complete One Complete One Complete
One Complete One Complete One Complete In Work
I
One Complete One Complete In Wor ak
Complete One Complete One Complete In Work
One Complete One Incomplete One Complete In Work Reticles and Align. Sys not complete
Complete
Complete
Complete
Complete Complete One Complete
Complete All Ordered
8 Ordered In Work
Complete 2 Complete
All Ordered
Complete 2 Complete One Complete
Complete Complete One Complete One Complete
Complete . One Complete Complete One Complete
Complete One Complete Complete One Complete
Complete Ordered Complete In Work
Approved For Release 2002/06/17 : CIA-RDP78B04747A000600080011-6
Enclosure (4)
1/3
Approved For Release 2002/06/17 : CIA-RDP78BO4747A000600080011-6 t
PURCHASED
ASSEMBLY
PRE DESIGN
DESIGN STATUS
RELEASED
PARTS
FABRICATION ASSEMB
LY
TEST AND REMARKS
Structure
Complete
Complete
Complete
Complete
In Work
Crt. Housing
Complete
Complete
Complete
In Work
One Complete
Crt. Elect. Parts
Complete
Complete
In Work
One Complete
One Complete
Track Assembly - X Drive
Complete
Complete
One Complete
One Complete
One Complete In Work
Lead Screw
One Complete In Work
Drive Assembly - "X"
Complete
Complete
One Complete
One Complete
In Work
Film Index
Complete
Complete
Complete
Complete
Complete 1 Assemb
ly
A, W. Syn. Mtrs. Ordered
Cycled 10000 x
Lens Board
Complete
Complete
Complete
In Work
In Work
Valve (Pneu & Vac)
Complete
Complete
Complete
Complete
Complete One Comp
lete
Cycled 2000 Times
Platen
Complete
Complete
One Complete
Complete
One Complete One Comp
lete
Cassettes
Complete
Complete
2 Complete
Complete
Two Complete Two Com
plete
Doors
Complete
Complete
Complete
Ordered
In Work
Vac. Pump
One Complete
Focus Current Regulator
Complete
Complete
Complete
Complete
One Complete One Comp
lete
20 K.V.
Complete
Complete
Complete
One Complete
One Complete
"X" Defl. Amp.
Complete
In Work
Complete
"Y" Defl. Amp.
Complete
Complete
Complete
Approved For Release 2002/06/17 : CIA-RDP78B04747A000600080011-6
Enclosure (4) 213
Mardi 1, I7iV
ASSEMBLY
1. Rack
1. Monitor
1. Monitor Control
I. Video Amplifier
1. Sweep Amplifier
1. Tape Reader
1. Transportape
1. Reader
1. Terminal Reader
1. Program Control
1. Film Index Servo
1. Scan Servo
1. Servo Controller
1. Scan Computer
1. Power Supply
2. Power Supply 300V
2. Power Supply -300V
1. Power Supply - General
Cables
PRE DESIGN
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Approved For Release 2002/06/17 : CIA-RDP78B04747A000600080011-6
.PHASE DIAGRAM FOR CABINET
PURCHASED
DESIGN STATUS RELEASED PARTS FABRICATION
Complete
Complete
To be done
To be done
To be done
To be done
Complete
Complete
In Work
To be done
In Work
In Work
In Work
In Work
In Work
Complete
Complete
In Work
In Work
Complete 1 Unit
Complete Complete In Work
I on hand
Integral with
reader
Complete Complete for one
Complete Complete for one
Approved For Release 2002/06/17 : CIA-RDP78B04747A000600080011-6
ASSEMBLY TEST AND REMARKS
In Work
Complete for one
Complete for one
Enclosure (4)
3/3
STATINTL Approved For Release 2002/06/17 : CIA-RDP78BO4747A000600080011-6
Approved For Release 2002/06/17 : CIA-RDP78BO4747A000600080011-6
READER
AND
PRINTER
CONTROL
CONSOLE
SYSTEM
TEST
MORK.
ESC I~'T I"ON
DESIGN
FABRICATION
TEST
DE'S IN
FABRICATION
TEST
TEST
TEST
TEST
~JuN
1T1L
Approved For Release 2002106117: CIA-RDP78B04747A0006000800110
PHOTOGRAPHIC RECTIFIER-PRINTER
WORK SCHEDULE AND PROGRESS CHART
AU6
19.159
SEP
DCT
NOv
DE;C
JAN
FEB
toot
MAR
APR
MAY
JUN
JUL
#1
UNIT
A'UG
UNITS #x, 3, 4
'UNIT #1
SEP
OCT
ZITS 3&4
Approved For Release 2002/06/17 : CIA-RDP78B04747A000600080011-6
1IITS 3.4
NOV
DEC
Enclosure (3)