CONTRACT INSPECTION REPORT

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A001100060006-8
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
6
Document Creation Date: 
December 28, 2016
Document Release Date: 
December 4, 2001
Sequence Number: 
6
Case Number: 
Publication Date: 
March 25, 1965
Content Type: 
FORM
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A001100060006-8.pdf260.71 KB
Body: 
25X1 A 25X1A CONTRACT N0. TASK NO. CONTRACT INSPECTION REPORT 25X1A TO: VAIL 25 Ma=h 1965 ENGINEERING SECTION/CB/PD/OL INSPECTION REPORT NO. (If final, so state) rinfal A) ESTIMATED C0 PLETION DATE 5 NAME OF CONTRACTOR TYPE OF COMMODITY OR SERVICE Md to ~t 'layer Study THE CONTRACTOR IS ON SCHEDULE THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED FUNDS Y E S ^ N O I F ANSWER I S "NO" ADVISE REC' YES E] NO OMMENDA ION AND/OR ACTION OF SPONSORING OFFICE, ON REVERSE HEREOF. IF KNOWN, INDICATE MAGNITUDE OF AD- no PER CENT OF WORK COMPLETED - no % DITIONAL FUNDS INVOLVED. PER CENT OF FUNDS EXPENDED - HAS AN INTERIM REPORT. FINAL REPORT. PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING THE PERIOD?, fJ YES [] NO (If yes, give details on reverse side.) HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? C] YES ? NO (If yes, indicate items, quantity, and cost on reverse side.) IlItENTIVES IS THIS AN INCENTIVE CONTRACT 0 YES NO NOTE: IF YES. CHECK TYPE aa~~ USE REVERSE SIDE FOR COMMENTS. O COST O PERFORMANCE O DELIVERY FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. OVERALL PERFORMANCE OF CONTRACTOR 1. ^ OUTSTANDING 3. ABOVE AVERAGE s. ^ BELOW AVERAGE 7. ^ UNSATISFACTORY 2. ^ EXCELLENT 4. ^ AVERAGE 6. ^ BARELY ADEQUATE IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE. INDICATE REASONS ON REVERSE SIDE. RECOMMENDED ACTION ^ CONTINUE AS PROGRAMMED ^ WITHHOLD PAYMENT PENDING NCE P M O ERF R A SATISFACTORY ^ OTHER (Specify) t^ TERMINATE IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE, WHERE APPLICABLE, THE FOLLOWING: ITEM REC D DOES NOT ITEM RECD DOES NOT APPLY APPLY PROTOTYPES MANUALS DRAWINGS AND SPECIFICATIONS FINAL REPORT PRODUCTION AND/OR OTHER SPECIAL TOOLING END ITEMS OTHER GOVERNMENT PROPERTY DATE O F LAST CONTACT WITH CONTRAD 15 March 1965 ECLASS REVIEW by N I MA/DO D SIGNATURE OF INSPECTOR DIVISION 25X1A INS NIM SIGNATURE OF APPROVER s. 2..2/.1/02: CIA-RDP7 B04747AO. FORM 1897 P L I E V I O U S 10.64 EDITION U N C L A S S I F I E D ] CONF I DENT I A L . ^ SECRET (! CONFIDENTIAL ^ UNCLASSIFIED pproved For Release 2002/01/02 CIA-RDP78B04747A001100Q npp -8 .. &-ro.ir nrnnDT M INTERIM 1IJJ 25X1A M has deigdi an excellent fimi report d x umential: their theories and e +rimentation in the L ht Modulation Viewer Feasibility Study. .i percent for these services according to the terae of the eontrir?t le rftam8rded. Approved - ^ SECRET -For RPIPq -7 1 ^ UNCLASSIFIED ] CONFIDENTIAL ^ SECRET IN NO ENGINEERING SECTION/CB/PD/OL ^ YES 25X1A THE CONTRACTOR IS ON SCHEDULE ^ YES PER CENT OF WORK COMPLETED . PER CENT OF FUNDS EXPENDED HAS AN INTERIM RIF~PORT, FINAL REPORT. PROTOTYPE, OR OTHER END ITEM BEEN REC ED R M HE CONTRACTOR DURING THE PERIOD?, YES ^ NO (If yes, give details on reverse side.) No ~uI HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? ^ YES (If yes, indicate items, quantity, and cost on reverse side.) IS THIS AN INCENTIVE CONTRACT IF YES. CHECK TYPE COST ^ PERFORMANCE In NO I NOTE: IDE FOR COMMENTS. S ^ DELIVERY ^ UNCLASSIFIED 2N CFA-I DP78B047474dcW16x'060006-8 DATE L 3 zes# INSPECTION REPORT NO. (If final, so state) THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED FUNDS ? YES O NO IF ANSWER IS "NO" ADVISE REC- OMMENDATION AND/OR ACTION OF SPONSORING OFFICE, ON REVERSE HEREOF. IF KNOWN, INDICATE MAGNITUDE OF AD- DITIONAL FUNDS INVOLVED. USE REVERSE FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. OUTSTANDING 3. ? ABOVE AVERAGE 5. ^ BELOW AVERAGE 7. 1:1 UNSATISFACTORY 4. ^ AVERAGE 6. ^ BARELY ADEQUATE 1 1:1 2. ^ EXCELLENT IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE. INDICATE REASONS ON REVERSE SIDE. -Approved or Release 2002/01 CONTRACT INSPECTION REPORT IN CONTINUE AS PROGRAMMED 13 WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE ^ OTHER (Specify) IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE. WHERE APPLICABLE. THE FOLLOWING: ^ TERMINATE PRODUCTION AND/OR OTHER END ITEMS DATE OF LAST CONTACT WITH C NTRACTOR .5 janjary FORM USE 10-64 1897 EDITIONS 25X1A ^ CONFIDENTIAL ^ UNCLASSIFIED DOES NOT APPLY 25X1A I I U IJ PI 'Pt MVV I I VVVVVVVV-V CE CONFIDENTIAL ^ SECRET (12-36) ^ SECRET CONFIDENTIAL UNCLASSIFIED NARRATIVE REPORT Q INTERIM ^ FINAL Approved For Release 2002/01/02 : CIA-RDP78BO4747AO01100060006-8 ^ UNCLASSIFIED ^ CONFIDENTIAL ^ SECRET -C R ET (Wi.'o gilled In) pprove or Release 2002iOl1O2F G1A-RDP78B 25X1A TO, ENGINE ; ?IN'? 1' ON/CB/PD/OL REVERSE H +. TIONAL FUNDS Modulated Light Film Viewer THE CONTRACT?: 'THE CONTRACTOR IS ON SCHEDULE YES FUNDS YE5 NO OMMENDAT ION A. - - '11 FREOt r 25X1 [Si 'MATED COMA"... OVERALL PERF"iI'-1ANCE OF CONTRACTOR 5. BELOW AVERAGE T. ^ UNSATISFACTORY I. ^ OUTSTANDING 3. r-1 ABOVE AVERAGE 4. F-1 AVERAGE 6. L I BARELY ADEQUATE 2. EXCELLENT 1_ IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSAI ISFACTORY OR BARELY ADEQUATE, INDICATE REASONS ON REVERSE SIDE. HAS AN INTERIM DEPORT, FINAL REPORT, PROTG OR OTHER END ITLN' SEEN RECEIVED FROM THE CONTRACTOR NO (If yes, ~ details on rever.oe side.) DURING THE PERIOD? ice' YES u Monthly report YES NO HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? El (If yes, indicate items, quantity, and cost on reverse side.) E WITHHOLD PAYMENT PENDING ? SATISFACTORY PERFORMANCE 7 IF TERMINATION IS RECOMMENDED OR IF THIS IS :, FINAL REPORT ATTACH COMMENTS IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT_ A;LnDELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED, CONTRACT '";`>'ECTIOPI REPORT F-1 TERMINATE 11FIND ITEMS DATE OF L I AST CONTACT WITH CONTRACTOR A u g : OF INSPECTOR 25X1A FORM 1897 URE 6.64 PREVIOUS EDITION DOES TI APP:. i FINAL REPORT r SPECIAL CIAL TOOLING D. (If final, so st:::e) PROBABLY REMAIN WITHIN ALLOCATED IF ANSWER iS - :~r ADVISE REC? C2 ACTION OF SPONSOP_:NC, OFFICE. ON ;r KNOWN. INDICATE MAGNITUDE OF ADDI- CC_VED. DIVISION GROUP 1 E clkd'?d from automatic x downgra dinU and dorIoulfcotion 3019 _ _ 4 `ob 1'100060006-8 25X1A DOES NOT APPLY SECRET (When Filled In CONTRACT INSPECTION REPORT HAS AN INTERIM REPORT. FINAL REPORT. PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR ? ^ No If yes, give details on reverse side.) YES DURING THE PERIODi Monthly report 11 YES ^X No HAS GOVERNMENT-OWNED PROPERTY BEENcostIVEREDvTOrsCON RA AC )OR DURING THIS PERIOD? (If yes. indicate items, quantity, 25X1A TYPE OF COMMODITY,OR SERVICE Modulated-Light Film Viewer _)-tudy TIE CONTRACTOR IS ON SCHEDULE ^ NO n YES 250 PER CENT OF WORK COMPLETED I. Q EXCELLENT 4. ^ A IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE, INDICATE REASONS ON OVERALL PERFOHMANi.c yr ^? ^ UNSATISFACTORY g, ^ BELOW AVERAGE 3. 11 ABOVE AVF_RAGE I, C] OUTSTANDING 6. 13 BARELY ADEQUATE VERAGE X CONTINUE AS PROGRAMMED RAdJ-`RDP78BO474 25X1A TASK NO. A001 100060006-8 E THE CONTRACTOR WILL PROBABLY REMAIN WITOHIADA;LOCATE D TFUNDS YES (L-~,~ NO IF ANSWER IS OMMENDA~ION AND/OR ACTION OF SPONSORING OFFICE. ON RSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF ADDI- REVE ^ WITHHOLD PAYMENT PENDING SATISFACTORY PERFORMANCE 11 TERMINATE FORM INALREPORT ATTACH COMMENTS IN NARRATIVE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. IF TERMINATION IS RECOMMENDED OR IF THIS IS A F CONTRACTOR'S PERFORMANCE THESE INCLUDE, WHERE APPLICABLE. THE FOLLOWING: DOE DRAW D SPECIFICATIONS NGS AN PRODUCTION AND/OR OTHER END ITEMS DATE OF LAST CONTACT W1TH CONTRACTOR 25X1A RECOMMENDED ACTION OTHER GOVERNMENT PROPERTY 1RDP78 downgrading and declossiflcaiion S NOT APPLY 25X1A