CONTRACT NO.(Sanitized)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A001200060001-2
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
75
Document Creation Date:
December 28, 2016
Document Release Date:
April 24, 2001
Sequence Number:
1
Case Number:
Publication Date:
October 30, 1954
Content Type:
LETTER
File:
Attachment | Size |
---|---|
![]() | 3.02 MB |
Body:
REQUESTED
Declass Review by NIMA/DOD
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
STATOTHR
STATOTHR
STATOTHR
STATOTHR
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
30 October 1964
Attention: Contracting Officer
Subject:
Gentlemen:
The above subject contract dated 19 May 1964 calls for one each
Variscan Mark II to be delivered on or before September IS,
1964. Our Production Department has informed me that a delay
in shipment has occured and the unit is now scheduled for ship-
ment from on December 6, 1964.
The cause for this delay has been the changes and modifications
we have made to the Variscan,to improve and increase its quality.
The areas of vibration isolation and improvements in the illumin-
ation and projection lens systems required the majority of the new
materials and machining time.
Our production schedule is now quite firmand we do not antici
pate any further delays.
STATOTHR
Very truly yours,
Busin
Manager
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
25X1A
*ale
25X1A
25X1A
Approved For Release 2001cNYF1 A*4747A001200060001-2
14 September 1964
MEMORANDUM FOR: Assistant for Plans and Development
THROUGH : Executive Secretary, Technical Development Committee
SUBJECT : Change of Scope of "Variscan Rear Projection Film
Viewer" contract 25X1A
25X1A
1. The EPIC has contracted with
for a Variscan Rear Projection Film Viewer for evaluation purposes.
Since the contract was negotiated, M has offered a variable speed
film traversing (across the width of the film) option at an increased
cost of if installed prior to delivery.
2. The fixed traversing speed of the Richardson Viewers has
always been considered an equipment limitation by the operating
personnel. On the Variscan the problem will be even more pronounced
with a fixed speed than the Richardson Viewers since the Variscan
has a greater magnification range.
3. The Photo Analysis Group was consulted as to the desirability
of having variable traversing speed and officially requested that it
be incorporated in the equipment. 25X1A
4. It is, therefore, recommended that Contract with
for a Variscan Mark II be modified to
include a variable speed on both axes of film movement at an increased
cost of bringing the total contract price up to
25X1A
25X1A
Development Branch, P&DS
Approved For Release 2001/05/11 :CIA-RIDP78604747A001200060001-2
CONFIDENTIAL
25X1A
GROIJPI
E.Oudedfoom
down.rodd.cksion
CONt,
DENTAL
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
pAG/14-846-64
3 September 1964
MEMORANDUM FOR: Chief Plans and Development Staff, NPIC
ATTENTION: 25X1A
SUBJECT: Variscan Film Viewer
25X1A
25X1A
Pursuant to discussions held between of Plans and
Development Staff and of the Photographic Analysis
Group (PAG concerning subject Film Viewer, PAG requests that a
variable speed drive across width of film as well as length
capability be added to the evaluation model to be procured by
NPIC.
25X1A
Colonel,
Assistant for Photographic Analysis Group, NPIC
25X1A
GROUP 1 4pproved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
I Excluded Iran automatic
i; A
Onnzratiing and
'Approved For. Releai
- SECRET -
(When Filled In)
SPEED LETTER
25X1A.
REPLY REQUESTED
DATE
YES
NO
LETTER NO.
TO :
ATTN:
FROM:
t i 4
\ c."2_15,c,, -Wv"tsr--Qd wc-N.
te) kt..? -0,1,t.... --tt';-t-?,f
,
9 t_ -3.IS'? t- .10- Ci
1-
(3,sr. ,...)-Ac? ,,,cv_s_:. C2, kt-rJ ,
P. Q, ", Cci r3I kr /
25X1A
.2.--?c--, r
r......s?
ai
SIGNATURE
5X1A
?
25X1A
1 elce :5X1A
25X1A
REPLY
25X1A
DATE
.,
SIGNATURE
RESPONDER'S FILE
,
1 ?
FORM
, 5-61 1531 - ?., SECRET .
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
ILLEGIB
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
Approved FarJRelease 2001/05/11 : CIA-RDP78604747A001200060001-2
StanOord Form 63
November 1961
GSA Gen. Reg. No. 27
MEMO NDUM OF CALL
25X1A
TO-
Date
TELEP
PLEASE CALL
0 WILL CALL AGAIN
E RETURNING YOUR CALL
0 IS REFERRED TO YOU BY:
LEFT THIS MESSAGE:
WAITING TO SEE YOU
0 WISHES AN APPOINTMENT
a_ce
25X1A
63-105
25X1A
MEMORANDUM FOR:
AA, -
FORM NO.
1 AUG 54
101
TRANSMITTAL SLIP
REMARKS:
25X1A
25X1A
DATE e. jf
FORM NO .0y' 1 REPLACES FORM 36-8
I FEB 55 ?-`1" WHICH MAY BE USED.
25X1A
GPO 1957-0-439445
ia_46-e-e-4--
/
25X1A
REPLACES FORM 10- 101
WHICH MAY BE USED.
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
( 4 7 )
(47)
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
SECRET
(When fIllod In)
SPEED LETTER
25X1A
REPLY REQUESTED
DAT*
.
..
.,.
LETT E *0
TO :
Arm:
f..01,1
koic)."L 4.--
,.....,,_
9.....cl.sc,...i li V,A-C-C1e
(2 0 ti? o.A ..?, e 1:c vdc- r k
it., ?tu
FROM:
1 g ? nio
kr-? . V-J1-25'
41._. (--
le-,
-
4r-7-
C-e...i5.e_
25X1A
.....r____
25X1A
REPLY ' N
,
et;
ii
,
44
e .
,.
.
..
..
,tY
4
?r
.
-
1
_
7
?
.
111104Avvit
MORN VD ORIGINATOR
:!:: 1101V
SECRET
o?
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
Approved For Release 2001/05/11: CIA-RDP78604
STATOTHR
\No/
STATOTHR
Noe'
STATOTHR
25 "lune 1964
LI
1 P3
Attention: Contracting Office
Reference:
Gentlemen:
Attached are the signed copies of the above referenced contract.
It has been brought to our attention by your technical repfe-
sentative that the Variscan Mark II requested should contain
variable speed on both axes. Our standard production model
which we quoted to you has variable speed on only one axis.
a'he addition of variable speed on the second or lateral axis
Is a standard addition and is priced at when in-
stalled at the time of manufacture. We are rzoccedirv:f on
this order and are requesting a modification in the amount of
1==to provide the variable speed.
Enclostires
bcc:
STATOTHR
STATOTHR
Very truly yours,
Approved For Release 2001/05/11 : CIA-RDP78B04747A001200060001-2
STATOTHR
STATOTHR
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
VARISCAN CAPTIONS
Picture 1 STATOTHR
The new Variscan - a versatile instrument for photointerpretation.
Picture 2
The Variscan control panel has a joystick for 2-axis image movement;
image rotation control; pushbutton magnification changing from 3X to
30X; continuously variable intensity; and a clip-board writing area for
notes and records.
Picture 3
At the rear of the instrument, a variable-width film transport holds and
drives films from 35mm to 9 1/2 inches in width. The lateral motion
control carries the entire transport in the "across-the-film" direction.
Picture 4
This multiple-exposure photograph shows the film transport and lateral
stage rotating about the optical axis (vertical) to turn the image on the
viewing screen.
Picture 5
A 4-lens assembly switches in projection lenses for 3X, 6X, 12X
and 30X viewing. The 12X lens is in position over the vacuum platen.
Above it, in order, are 30X, 6X and 3X.
Picture 6
In this time exposure, the 12X lens is swinging up and back as the
6X lens comes down into viewing position.
Picture 7
In the base of the Variscan are the air-cooled lamp housing and con-
denser elements-shown here set for 6X. A front-surface mirror (at
right) directs light upward through the platen.
Picture 8
When magnification is changed, the appropriate condenser elements
slide into position in the light path. Here three intermediate lenses
concentrate the light for 30X viewing.
Picture 9
At 3X, the operator can view and scan an entire 9 1/2" x 9 1/2" frame
of aerial film.
Picture 10
The operator switches to 6X and centers an area of interest.
Approved For Release 2001/05/11 : CIA-RdI5781304747A001200060001-2
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
Picture 11
The same view at 12X - intensity, position and rotation controls help
the operator establish optimum viewing conditions.
Picture 12
At 30X the full detail in the photograph is visible, with a resolution of
180 lines per millimeter on the film.
-2-
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
Approved For R
STATOTHR
II I :r.sA A Ail 111.111
6 July 1964
STATOTHR
Enclosed are the installation sheets you requested
we provide for the Variscan.
Should there be any further information you require,
please do not hesitate to ask.
Very truly yours,
STATOTHR
WHM:plf
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
INSTALLATION ENGINEERING
I. INSTRUMENT STATOTHR
A. Name Variscan Mark II
B. Manufacturer
C. Contract Number
II. PHYSICAL FEATURES
A. Number of Component Parts One
B. Dimensions of the Largest Component Part:
Length 7 Ft. 3 In. Height 6 Ft. 4 1/2 In.
Width Ft. 34 In.
C. Weight of Largest Component Part
D. Total Weight of Instrument 1700 lbs.
E. Overall Dimensions Assembled:
Length 7 Ft. 3 In. Height 6 Ft. 4 1/2 In.
Width Ft. 34 1/2In? (w/o plastic covers)
F. Type of Base of Mount:
Flat Three Point Suspension X Four Point Suspension
G. Does Instrument have built-in mobility? Yes
H. Is the instrument particularly sensitive to vibration? No
I. Are any special or unusual tools or fixtures necessary or adviseable
for the installation or maintenance of this equipment? No
III. UTILITIES
A. Electrical: AC DC
Voltage 117 Volts 10 Volts
Current 30 Amps Max
Frequency. 601 cps
Nr. of phases
Nr. of wires 3
Power required by
equipment 3500 Watts Max / Watts
Type of outlet required: Two Prong , Three Prong X
Twist Lock , Permanent Installation
1
Should the equipm nt be shielded, either from external electro-
magnetic signals, or to prevent interference with other equipment?
1. No. 2. Same as any equipment with mOtors, relays, and
switches to prevent interference with other equipment; no unusual
requirements
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
.Nrwri
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
B. Air Conditioning:
Room temperature
58? - 95?
Output of Instrument 11028
Humidity ' 60%
BTU/Hr.
If air must be filtered, what is maximum permissible particle size
What particle count? N. A,
in microns? N. A.
particles per cubic foot.
Direct connection to instrument? Yes No X
If yes to above, what is the desired air temperature to instrument?
Should discharged air be ducted separately? Yes
Is discharged air noxious? _No toxic? NO
Connector size to instrument N.A.
C. Plumbing:
Is water required for the instrument? Yes No
Water pressure N.A. Flow in GPM
X
Type of water desired:
Tap
N.A.
Tempered N.A.
Deionized N.A.
Filtered
oF
oF
oF
oF
oF
oF
oF
?F Particle size and count per
unit volume.
Type of pipe required:
Galvanized N.A. Copper
Stainless Steel DI,k. Plastic
Is floor drain required? Yes No X
Diameter of drain
Plastic drain N.A.
Galvanized drain N.A.
Glass drain N.A.
D. Compressed Air:
Diameter of connectors N.A. Type of connectors N.A,
PSI LA. Water free? N.A.
CFM N,A. Oil free? N.A.
E. Vacuum:
Is vacuum required?
Vacuum required N.A.
meters)of Hq
Displacement 14,A,
IV. REMARKS
Yes No X
PSIA or (inches) (milli-
LA.
In the event additional space is required for environmental conditions
or utilities not mentioned above, use the reverse side of this form.
2
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
App
ILLEGIB
25xiA
a
e 2001/05/11 : CIA-RDP78604747A001200060001-2
jJ
Poet Office Nos
Port Davis *OW
ussuftstest, rtx.
, ,
_
)
vised)
dentlesen
Ret*rno isod* to your Utter of July 151 1966 re-
ording the intorporation of Mel orterbeed sod C & A rotes
in &Neat footrest*
tits Costracting Offloor ooneurs with your reess000ietim
thet this eontreet he settled hy yosr retention of the i;eoperty
puretesed under the tents of this toritreet. In respcons to this
you win. soorpt overhead etv* 4 A rates low than thee* pro-
posed to DM.
Accord:4
provided *Awl the
purisaint to Artilas Six (
therein final overheed setts
to y seeeptonee in the space
et is hereby seiseded
Penaritah (d) to inctsrpsrate
fee the periods specified helmet
1
Zne-1neer134 everrogred
A =pease
algirtOotiale CMOthOod-
0 It A expense
'fi.S4 of direst 1sbc dollars
exclusive of ovstrtbss ;roam
5.4 of sost of sales
13.0%
11
NOTICE
defense of the United States
Tbis lingerie' contains Information affectinz the
a/1*ln the inosrang of ilme lf er, Title C1T
Of reve?elp,
national
7.1.3 and 194, the transmission
? I hv
tj4kdow4I:1,5r1.:1:1?!:1171:-.Trt'l
declassli1V01.711
CONfinEN
Approved For Release 2001/05/11 :
CIA-M8B04 A001200060001-2
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
itiarafte.O tt* tarnatts raga i$ iwklistvt
a this Contrast eat ow tesx Order* invest hererosher eltsieh lteett,
to, the oleo* et' stele* satheisteet east. eatgetSes of the
evreressect to relebterse the flenteseteet fete mete inserristi
Pit tot:testa ytmer seeeptenee of the ftereepiew eisoiss
this Utter sat the weelesed two =Ore twee filetittn sae sepy
ter par merle tad retosen the Liveld orisisra awl rinswaske
ese espy to the tothbreigned at the 414rtiffitt priltatiealft &tat*
25X1A
25X1A
3
Very trsli,y yew*
Ceettreetteg ft-Meer
1
Irthri
Approved2
Cf?m
ILLEGIB
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
Next 1 Page(s) In Document Exempt
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
_
_ , 4 .
---4.._,44,_, ,Vr.: .t......T.FEr - S ?. 7$11Mf11111-1?
'' I.' '' r unert,?2
-.4
20 .- ',-z.
Approw- 0 ' : ' elk ii:Cti'M'
1;
.
1
NO. OF PAGES
?b. :A .4i : NO
.BLLKE.Ald VOUCHER NO.
*
.. ?.
. ,
BUREAU SCHEDULE NO.
PREPARED BY
REFERENCE
This contractual document is entered into as of the date above, by and between the United States of America, hereinafter called the Government represented by the Contiacting Officer executing
below named Contractor, heleinafter called the Contractot. The parties he eta agree that the Contractor shall furnish the facilities and deliver the supplies and services set foith herein for the
some, and the
consideration stated.
IMPORTANT
IF "X" APPEARS
I /
2
CONTRACT- The rights and obligations of the parties hereto shall be subject to and governed by the Schedule and the terms and conditions on the attached
Form No. ( .31*.0 edition). To tire extent of any inconsistency within the Schedule and the General Provisions, the Schedule shall control.
General Provisions
TASK ORDER- The rights and obligations of the parties hereto shall be subject to and governed by this Task Order consisting of the Schedule and all terms and provhions
indicated above, which is incorporated herein by reference and made a part hereof. To the extent of any inconsistency between Basic Contract and this Task Order, this Task Order
of the Basic Contract
shall control.
TO: CONTRA TOR Ai. I LOD:
MAIL INVOICE TO
25X1A
25X1A
SHIP TO: (CONSIGNEE AND ADDRESS)
enIMPORTANT: (PLEASE COMPLY WITH IDENTIFICATION &MARKING INSTRUCTIONS PARA. 12. REVERSE).
DATE(S) OF DELIVERY DISCOUNT TERMS
+.1,,,
DELIVERY
F.O.B.
DESTINATION
OTHER (AS
SPECIFIED IN
SCHEDULE)
SCHEDULE
t
ITEM
NO.
SUPPLIES OR SERVICES
UNIT
QUANTITY
(NO. OF
UNITS)
UNIT
PRICE
AMOUNT
Mi
25X1A
, -
ACCOUNTING CLASSIFICATION
THE U
BY
CONTRACTING OFFICER
25X1A
PROCUREMENT
THE ABOVE
AND
OF NEGOTIATION
REJECTION
BY THE
PRICES
AUTHORITY/CERTIFICATE OF
THIS CONTRACT ADVERTISED
UNDER AUTHORITY AS
CONTRACTING OFFICER
CORRECT: THAT ANY REQUIRED
HAS BEEN MADE
OF LOW BIDS ATTACHED:
AGREEMENT ARE NECESSARY
CHARGED ARE JUST AND REASONABLE.
AWARD
OR NEGOTIATED
SHOWN BELOW.
CERTIFIES THAT THE FOLLOWING IS TRUE
DETERMINATION AND FINDINGS IN CASE
OR A STATEMENT OF REASON IN CASE OF
THAT THE SUPPLIES OR SERVICES COVERED
FOR THE PUBLIC SERVICE AND THAT THE
TO BE INSPECTED BY
PROCURED AS S.C.
T AND i
Other As
Specified
In Schedule
NNT
ZERO
ONE
ADV.
NO. DEALERS
NO. BIDS
REC'D.
AWARD TO LOWEST BIDDER AS
TO PRICE EXPENDITURE
YES F?NO Statement
Attached
CHARGE ALLOTMENT NO.
411404007634,004
COST CENTER SYMBOL
4145.1.034411344.
N
E
G
PURSUANT TO SEC. 3(A) PL 81 -110, 1949
AND APPLICABLE AGENCY REGULATION
REQUISITION NO.
$500.4741-64
BUDGET REQ. OFFICE COPY TO
0
T
I
A
PUBLIC
EXIGENCY
IMPRACTICAL TO
SECURE COMPETITION
frl 171,70
NAME - ROOM - BUILDING
T
E
D
SHOULD NOT BE
PUBLICLY DISCLOSED
OTHER (SPECIFY)
STOCK
ALLOCATION NO,
SHIPMENT
STATION NO.
VIA
SEA
AIR
POUCH
TRUCK
MEMORANDUM
FORM ,AAA
3_62 I
EDIrwproved For Release 20 : - -
10. REQUISITIONING
USE PRA'
OFFicE BuDGET cOpY
./D
SECR4Proved For Release 2001 ti 3 41 UNCLASS I Ft ED
CONTRACT INSPECTION REPORT
CONTRACT NO.
25X1A
TASK NO.
TO:
ENGINEERING SECTION/CB/PD/OL
DATE
INSPel.TIO RE' tVrif.*/(If final, so state)
ESTINUPPOMPLETION DATE
liamh 1955 47914PIXED
NAME OF CONTRACTOR 25X1A
TYPE OF COMM,
IrL
THE CONTRACTOR IS 61#111119PLEIP1231
( NO
YES 0
:j
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
FUNDS R YES 0 NO IF ANSWER IS "NO" ADVISE REC-
OMMENDA ON AND/OR ACTION OF SPONSORING OFFICE. ON
REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD-
DITIONAL FUNDS INVOLVED.
PER CENT OF WORK COMPLETED ?
PER CENT OF FUNDS EXPENDED -
HAS AN INTERIM REPORT. FINAL
REPORT. PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED
(If yes, give details on reverse side.)
Y BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD?
and cost on reverse side.)
FROM
THE CONTRACTOR
YES
DURING THE PERIOD 7 II YES
1NO
HAS GOVERNMENT-OWNED PROP
(If yes, indicate items, quantity,
II
NO
INCENTIVES
IS THIS AN INCENTIVE CONTRACT 0
IF YES. CHECK TYPE
YES Gj NO
0 DELIVERY
NOTE:
USE REVERSE SIDE FOR COMMENTS.
FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION.
0 COST ll PERFORMANCE
OVERALL PERFORMANCE OF CONTRACTOR
I . OUTSTANDING 3. (3 ABOVE AVERAGE 5. BELOW AVERAGE 7. UNSATISFACTORY
2. EXCELLENT 4. 0 AVERAGE 6. BARELY ADEQUATE
IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE. INDICATE REASONS ON
REVERSE SIDE.
RECOMMENDED ACTION
CONTINUE AS PROGRAMMED WITHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
OTERMINATE OTHER (Specify)
IF TERMINATION IS RECOMMENDED OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE
FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN
RECEIVED. THESE INCLUDE, WHERE APPLICABLE, THE FOLLOWING:
ITEM
REC'D
DOES NOT
APPLY
ITEM
REVD
DOES NOT
APPLY
PROTOTYPES
MANUALS
4
DRAWINGS AND SPECIFICATIONS
FINAL REPORT
PRODUCTION AND/OR OTHER
END ITEMS
SPECIAL TOOLING
OTHER GOVERNMENT PROPERTY
DATE OF LAST CONTACT WITH CONTRACTOR
1;,-2 14J;Kri 1 ig6 iephoni=
SIGNATURE OF INSPECTOR
25X1A
DIVISION 25X1A
INSPECTOR'S EXTENSION
ApproviaAr Release 2001/05/11: CIA-RDP78604747A
SIGNATURE
FORM USE
in- RA 1897 PREVIOUS
ensTlfsm
0 UNCLASSIFIED
0 CONFIDENTIAL
2-36)
0 SECRET 0 CONFIDENTIAL 0 UNCLASSIFIED
Approved For Release 2001/05/11 : CIA-ROP78B04747A001200060001-2
NARRATIVE REPORT 0 INTERIM g FINAL
Te At eU.' d rUn44r VAill co
and twiltptsd, It L now undergoing evaleut on to
ret eoz 44ttot puroliasea.
rProved For Roloacc 2001/06/11 ;_QIA-RDr701:304747A001200080001-2
0 UNCLASSIFIED LI CONFIDENTIAL
SECRET
0 SEC ET
a-CONFIDENTIAL
41 3 74 0 UNCLASSIFIED
iqpravcai oriletclbe2001/05/117elik- RIJR743r1a0474)7A,M00600015.2
CONTRACT INSPECTION REPORT
NO.
TO:
ENGINEERING SECTION/CB/PD/OL
DATE
19 Feb 65
INSPECTION REPORT NO. (If final, so state
7
ESTIMATED COMPLETION DATE
Mar 65
NAME OF CONTRACTOR 25X1A
TYPE OF COMMODITY OR SERVICE
Variscan Film Viewer
THE CONTRACTOR IS ON SCHEDULE
O YES 12 "
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
FUNDS 0 YES ONO IF ANSWER IS "NO" ADVISE REC-
OMMENDATION AND/OR ACTION OF SPONSORING OFFICE, ON
REVERSE HEREOF. IF KNOWN, INDICATE MAGNITUDE OF AD.
DITIONAL FUNDS INVOLVED.
PER CENT OF WORK COMPLETED - 85%
PER CENT OF FUNDS EXPENDED ? .., ..
HAS AN INTERIM REPORT, FINAL REPORT. PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
DURING THE PERIOD? 0 YES 0 NO (If yea, give details on reverse side.)
HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? 0 YES 0 NO
(If yes, indicate items, quantity, and cost on reverse side.)
INCENTIVES
IS THIS AN INCENTIVE CONTRACT 0
IF YES. CHECK TYPE
0 c46T 0 PERFORMANCE
YES
El NO
1 VERY
NOTE:
USE REVERSE SIDE FOR COMMENTS.
FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION.
.
a DEL
OVERALL PERFORMANCE OF CONTRACTOR
I. 0 OUTSTANDING 3. ABOVE AVERAGE 5. BELOW AVERAGE 7.
2, 17j EXCELLENT 4. 0 AVERAGE 6. BARELY ADEQUATE
IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE, INDICATE
REVERSE SIDE.
,
UNSATISFACTORY
ON
REASONS
RECOMMENDED ACTION
WITHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
0 OTHER (Specify)
OR IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE
AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN
APPLICABLE, THE FOLLOWING:
X CONTINUE AS PROGRAMMED
[:3 TERMINATE
IF TERMINATION IS RECOMMENDED
FORM ON CONTRACTOR'S PERFORMANCE
RECEIVED. THESE INCLUDE, WHERE
ITEM
RECD
DOES NOT
APPLY
ITEM
REC'D
DOES NOT
APPLY
PROTOTYPES
MANUALS
DRAWINGS AND SPECIFICATIONS
FINAL REPORT
PRODUCTION AND/OR OTHER
END ITEMS
SPECIAL TOOLING
OTHER GOVERNMENT PROPERTY
DATE OF LAST CONTACT WITH CONTRACTOR
19 Feb 65 25X1A
SIGNA
DIVISION
25X1A
P: I
SIGN
INSPECTOR'S EXTENSION
3308
A v.v..... Ai- r-. .
FORM
USE
10-64 1897 PREVIOUS
UNCLASSIFIED
. - appffieppE0001-2
EDITION
0 SECRET
(12-36)
osEcag
RFFI8F,111111-
__4747A001200000001-2 El UNCLASSIFIED
mvPri Fnr Ralaaco 2QQlIOcIjIf!
NARRATIVE REPORT
INTERIM fJ FINAL
This contract is behind schedule, therefore, it is requested
that the contracting officer take the appropriate action to
establish a new contract completion date. The contractor has
verbally informed me that he is being held up by vendor
problems but hopes to be able to ship the instrument by 15 Mar.
The overall delay is due to redesign of the film reel holding
mechanism, platen mechanism, focus mechanism, and adding varittble
film traversing speed controls. These delays are considered
justified in view of the fact that we will receive an improved
version of the Variscan.
Approved For Release 2001/05/11 : CIA,RDP78B04747A001200060001-2
0 UNCLASSIFIED
EICONF !DENT IAL 0 SECRET
SECRET
(When Pilled In)
______In.....pwerrwt-Newase 2001/05/11 . CM
CONTRACT INIIKCTION REPORT . -RIPM6T4thilaotfarbis0001-2
TASK NO.
TO:
ENGINEERING SECTION/CH/PD/OL
.._
'
DATE
1 December 1964
INSPECTION REPORT NO, (If final, so state
6
ESTIMATED'tOMPLETION DATE
30 December 1964
NAME OF CONTRACTOR
25X1A
TYPE OF COMMODITY OR SERVICE
, Varys can Film Viewer
THE CONTRACTOR IS ON SCHEDULE
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
FUNDS Er Yes9 mo IF ANSWER IS "NO" ADVISE REC-
OMMENDATION AND OR ACTION OF SPONSORING OFFICE. ON
REVERSE HEREOF. IF KNOWN, INDICATE MAGNITUDE OF ADDI-
TIONAL FUNDS INVOLVED,
YES 51 ..
PER CENT OF WORK COMPLETED 80%
HAS AN INTERIM REPORT, FINAL
REPORT. PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
NO (If yea, give details on reverse side.)
BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? YES ER3 NO
and cost on reverse side.)
DURING THE PERIOD? II YES 0
HAS GOVERNMENT-OWNED PROPERTY
(If yes, indicate items, quantity,
OVERALL
PERFORMANCE OF CONTRACTOR
AVERAGE S. BELOW AVERAGE 7. c:3 UNSATISFACTORY
6. BARELY ADEQUATE
IS UNSATISFACTORY OR BARELY ADEQUATE, INDICATE REASONS ON
. OUTSTANDING 3. II ABOVE
. 0 EXCELLENT 4. [:3 AVERAGE
IF OVERALL PERFORMANCE OF CONTRACTOR
REVERSE SIDE.
RECOMMENDED ACTION
WITHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
0 OTHER (Specify)
OR IF THIS IS A FINAL REPORT ATTACH COMMENTS IN NARRATIVE FORM ON
THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED.
THE FOLLOWING'
fl CONTINUE AS PROGRAMMED
TERMINATE
IF TERMINATION IS RECOMMENDED
CONTRACTOR'S PERFORMANCE AND CERTIFY
THESE INCLUDE, WHERE APPLICABLE,
ITEM
,--
RECODOES
'
NOT
APPLY
ITEM
RECD
DOES NOT
APPLY
PROTOTYPES. '
MANUALS
DRAWINGS AND SPECIFICATIONS
FINAL REPORT
PRODUCTION AND/OR OTHER
END ITEMS
SPECIAL TOOLING
OTHER GOVERNMENT PROPERTY
DATE OF LAST CONTACT WITH CONTRACTOR ?
18 November 14,64
SIGNATURE OF 1NSP
INSPECTOR'S EXTENSION
? 3308 25X1A
Approved For Paje.cc 2001/n1i i . - n-
. ..
DIVISION
25X1A
ORM IR97 s
6-64 r PREVIOUS
EDITION
. (When Willed In) -
Q60100
downgrodirig and
dettassilkollon
36)
ILLEGIB
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
SECRET
(When Filled In)
Approved Forkelease 2001/05/11: CIA-REY1917813r021147A0012000.M
CONTRACT INSPECTION REPORT
25X1A
/P.
TO:
ENGINEERING SECT ION/CB/PD/ a
DATE
1 Bkyy 64
INSPECTION REPORT NO. (If final, so state)
5
ESTIMATED COMPLETION DATE
Oft' 30 64
NAME OF CONTRACTOR
25X1A
JIIIIIIIIIIIIIIIIIIIIII
TYPE OF
,
Varkscan Film Viewer .
THE CONTRACTOR IS ON SCHEDULE
?
THE CONTRACTOR WILL PROBABLY
REMAIN WITHIN ALLOCATED
AN5WER IS "NO" ADVISE REC.
OF SPONSORING OFFICE. ON
INDICATE MAGNITUDE OF ADDI.
YES pa ..
FUNDS gf, YES9 NO IF
OMMENDATION AND OR ACTION
REVERSE HEREOF. IF KNOWN,
TIONAL FUNDS INVOLVED.
80(,/,
PER CENT OF WORK COMPLETED
HAS AN INTERIM REPORT, FINAL
REPORT. PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED
(If yes, dive details on reverse aide.)
BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD?
and cost on reverse side.)
FROM
THE CONTRACTOR
YES
DURING THE PERIOD? 0 YES , NO
HAS GOVERNMENT.OWNED PROPERTY
(If yes, indicate items, quantity,
Ill
X NO
OVERALL PERFORMANCE OF CONTRACTOR
OUTSTANDING 3' 0 ABOVE AVERAGE 5. BELOW AVERAGE 7. UNSATISFACTORY
e. BARELY ADEQUATE
.EJ EXCELLENT 4. [23 AVERAGE v.
IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE. INDICATE REASONS ON
REVERSE SIDE.
RECOMMENDED ACTION
WITHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
EJ OTHER (Specify)
OR IF THIS IS A FtNAL:REPORT ATTACH COMMENTS IN NARRATIVE FORM ON
THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED.
THE FOLLOWING:
X CONTINUE AS PROGRAMMED
TERMINATE
IF TERMINATION IS RECOMMENDED
CONTRACTOR'S PERFORMANCE AND CERTIFY
THESE INCLUDE, WHERE APPLICABLE.
ITEM
REC.?
DOES NOT
APPLY
ITEM
REC.()
DOES NOT
APPLY
PROTOTYPES
MANUALS
DRAWINGS AND SPECIFICATIONS
FINAL REPORT
el
PRODUCTION AND/OR OTHER
END ITEMS
SPECIAL TOOLING
OTHER GOVERNMENT PROPERTY
DATE OF LAST CONTACT WITH CONTRACTOR
20 Oct 64
3308 25X1A
DIVISION
25X1A
FORM 1897 %:vlous
6.64
EDITION
."I?.'-
(When
Filled In)
Excluded from automatic
downgrading and
declastlficallon
SECRET
Approved(When Filled In)
....A., iivai 1 1 :e1A-
CONTRACT INSPECTION REPORT
7643641?47A4bi4 oo060001
TASK_ NO.
2
TO:
ENGINEERING SECTION/CB/PD/OL
DATE
1 Oct 64
INSPECTION REPORT NO. (II final, so state)
3
ESTIMATED comncrioN DATE
Nov 19611
NAME OF CONTRACTOR 25X1A
TYPE OF COMMO.
Vhrysean Film Viewer
THE CONTRACTOR IS ON SCHEDULE
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
FUNDS Ea rts9 NO IF ANSWER IS NO ADVISE REC.
OMMENDATION AND OR ACTION OF SPONSORING OFFICE. ON
REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF ADDI.
TIONAL FUNDS INVOLVED.
0 ,,. E ..
-,........
PER CENT OF WORK COMPLETED ___M104
_
HAS AN INTERIM REPORT. FINAL
REPORT, PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
No (If yea, give details on reverse side.)
BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? 13 YE I
and cost on reverse side.)
0 DURING THE PERIOD? "s
HAS GOVERNMENT.OWNED PROPERTY
(II yea, indicate items, quantity,
,
NO ,
OVERALL PERFORMANCE OF CONTRACTOR
. OUTSTANDING 3. 0 ABOVE AVERAGE B. BELOW AVERAGE 7.(23 UNSATISFACTORY
? 0 EXCELLENT 4. 0 AVERAGE 6 . 0 BARELY ADEQUATE
IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE, INDICATE REASONS ON
REVERSE SIDE,
RECOMMENDED ACTION
El WfTHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
OTHER (Specify)
OR IF THIS IS A FINAL REPORT ATTACH COMMENTS IN NARRATIVE FORM ON
THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED.
THE FOLLOWING:
all CONTINUE AS PROGRAMMED
TERMINATE
IF TERMINATION IS RECOMMENDED
CONTRACTOR'S PERFORMANCE AND CERTIFY
THESE INCLUDE, WHERE APPLICABLE,
ITEM
REM
DOES NOT
APPLY
ITEM
REM
DOES NOT
APPLY
PROTOTYPES
MANUALS
DRAWINGS AND SPECIFICATIONS
FINAL REPORT
PRODUCTION AND/OR OTHER
END ITEMS
SPECIAL TOOLING
OTHER GOVERNMENT PROPERTY
DATE OF LAST CONTACT WITH CONTRACTOR
18 Sept 64
.
3308
Approved For Rele
DIVISION
25X1A
SIG
-
FORM 897 USE
6.64 PREVIOUS
COITION
012 0000001 2.
Exclvded from duitrtnotk
(When Filled In) downgrading end
declanIkallort
-35)
25X1A
ApproAINORWA344Mt45hille:WAIRDPU&474%4001/00060g0Ptbgress on the V
Variable Width Film Readers and Variscan Viewers was reviewed at
25X1A
was'given a complete
25X1A
review of the work is doing in the stellar comparator field.
25X1A
The first six production Varyscans,thad just been dleivered prior
to my visit, and none of the machines under construction were in operating
condition, so I was unable to evaluate a working model. The major changes
in the production model over the prototype were a completely redesigned
cabinet of far greater rigidity, and substitution of a mechanical
platen clamp instead of the vacuum platen. This platen differs from the
Richardson platens in that both asses move instead of one and the total
opening is 5/8", which allows complete freedom of the film during
scanning and slewing. The ?platemare so adjusted that whhn closed, they
cause a minimum of focus shift. Ingeneral, I was impressed with the
production engineering results which make the Varyscan production model
more functional then the prototype. Delivery of the NPIC Viewer is
scheduled for the latter part of October.
As far the Film Reader, there were a number of minor defeciencies
which require correction and two major problems areas.
Approved For Release 2001/05111 : CIA-RDP78B04747A001260060001-2
rcoinTeip &i'6 ,c7-
Approved For Release 2001/0511 la caA-Rcezepet474040000060001 -2
There was considerable vibration of the image as projected on the screen,
and the freon was not completely dried from the film when rewound at
at high speed. In addition another major problem exists in providing
an acceptable toxic vent. I have since been informed that they feel
they have solved the vibration problem by reinforcing the cabinet. At
present they are still working on solving the film drying and venting
problems. It is possible that both of these problems could be solved
eye simutaneously if we were willing to accept a higher freon loss.
NO film reeolution readings or light intensity values were taken due
to the vibration and uncomplete optical alignment. The 48x lens presently
in the machine was considered unacceptable by1111 and alorder
has been p4.aced for a new lens.
25X1A '
In general, the reader has the highest quality projection image viewed
this far by the undersigned. Resolution appeared good as far as could
be determined and their was an abeolute minimum of color fringing
apparent. The liquid gate appeared to function well and their was not
apparent flutter of the image. The transport worked well, however, several
of the minor correction requested were in the transport controls. The
estimated completion date is presentlithe end of October unless additional
problems are encountered in the venting aspect.
25X1A
Financially ?has overrun the contract price. They have been requested
to prepare a report totthe contracting officer on the actual costs involved
and the reason for not reporting at the 80% mark. This should be forthcoming
shorthly.
25X1A
In addition was given a complete briefing on the work
is doing in the stellar comparator and automatic image centering field.
I did not sit in on these discussions so far addtional details see
report in TID.
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
25X1A
_IL
(When Filled In)
,-wpiuveu rut rwiedsezwilmoill :um-hiaMON47047A00120006
CONTRACT INSPECTION REPORT
25X1A
OCK4o.
TO:
ENGINEERING SECTION/CB/PD/OL
DATE
9 Sept. 1964
INSPECTION REPORT NO. (If final, so state
2
ESTIMATED COMPLETION DATE
Oct. 1964
NAME OF CONTRACTOR 25x1A
TYPE OF COMMODITY OR SERVICE
Variscan Film Viewer
THE CONTRACTOR IS ON SCHEDULE
THE CONTRACTOR WILL PROBABLY
REMAIN WITHIN ALLOCATED
AN,SMER IS "NO" ADVISE REC-
OF SPONSORING OFFICE, ON
INDICATE MAGNITUDE OF ADDI-
YES El NO
FUNDS rg YES9 NO IF
OMMENDATION AND OR ACTION
REVERSE HEREOF. IF KNOWN,
TIONAL FUNDS INVOLVED.
PER CENT OF WORK COMPLETED 6c1
HAS AN INTERIM REPORT, FINAL
REPORT, PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
NO (If yes, give details on reverse side.)
BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? YES
and cost on reverse side.)
DURING THE PERIOD? YES
X
HAS GOVERNMENT-OWNED PROPERTY
(If yes, indicate items, quantity,
X NO
OVERALL
PERFORMANCE OF CONTRACTOR
AVERAGE 5. El BELOW AVERAGE 7. UNSATISFACTORY
6. El BARELY ADEQUATE
UNSATISFACTORY OR BARELY ADEQUATE, INDICATE REASONS ON
. OUTSTANDING 3. X ABOVE
EXCELLENT 4. AVERAGE
IF OVERALL PERFORMANCE OF CONTRACTOR IS
REVERSE SIDE.
RECOMMENDED ACTION
WITHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
OTHER (Specify)
OR IF THIS IS A FINAL REPORT ATTACH COMMENTS IN NARRATIVE FORM ON
THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED.
THE FOLLOWING:
X CONTINUE AS PROGRAMMED
TERMINATE
IF TERMINATION IS RECOMMENDED
CONTRACTOR'S PERFORMANCE AND CERTIFY
THESE INCLUDE. WHERE APPLICABLE.
ITEM
RECD
DOES NOT
APPLY
ITEM
RECD
DOES NOT
APPLY
PROTOTYPES
MANUALS
DRAWINGS AND SPECIFICATIONS
FINAL REPORT ,
PRODUCTION AND/OR OTHER
END ITEMS
SPECIAL TOOLING
OTHER GOVERNMENT PROPERTY
DATE OF LAST CONTACT WITH CONTRACTOR
9 Sept. 1964
25X1A
DIVISION
P&IDS 25X1A
SIGNATURE OF INSPECTOR
_....
INSPECTOR'S EXTENSION
3308
A. ? ? ? - ? I i
II
FORM st97 USE
6-64 " / PREVIOUS
EOITION
SECRET
GROUP I
Excluded from automatic
(When Filled In) downgrading and
declassification
(12-36)
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
A recommendation is currently being processed to change the scope
of this machine to include a variable speed film drive for film,
traversing. This will delay delivery until approximately mid-October 1964.
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
SECRET
(When Filled In)
Approved ForRelease2001/05/11:CIA-IRCP768647WA0012000600M
CONTRACT INSPECTION REPORT
2767
No.
TO:
ENGINEERING SECTION/CB/PD/OL
DATE
28 July 19614.
INSPECTION REPORT NO. (If final, so state)
I
ESTIMATED COMPLETION DATE
Septet:bar 1961!
NAME OF CONTRACTOR 25X1A
TYPE OF COMMODITY OR SERVICE
Varyscitan Rear Projectlot2 Viewer
THE CONTRACTOR IS ON SCHEDULE
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
FUNDSYES
OMMEND ION AND/ORNO IF ANSWER IS "NO" ADVISE REC.
lp ACTION OF SPONSORING OFFICE. ON
REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF ADDI-
TIONAL FUNDS INVOLVED.
YES NO
PER CENT OF WORK COMPLETED
HAS AN INTERIM REPORT, FINAL
REPORT. PROTOTYPE, OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
NO (If yes, give details on reverse side.)
BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? YES 0 NO
and cost on reverse side.)
DURING THE PERIOD? YES i
HAS GOVERNMENT-OWNED PROPERTY
(If yes, indicate items, quantity,
OVERALL PERFORMANCE OF CONTRACTOR
. OUTSTANDING 3. ABOVE AVERAGE 5 . BELOW AVERAGE 7. UNSATISFACTORY
. EXCELLENT 4. 0 AVERAGE 6. BARELY ADEQUATE
IF OVERALL PERFORMANCE OF CONTRACTOR IS UNSATISFACTORY OR BARELY ADEQUATE, INDICATE REASONS ON
REVERSE SIDE.
RECOMMENDED ACTION
WITHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
OTHER (Specify)
OR IF THIS IS A FINAL REPORT ATTACH COMMENTS IN NARRATIVE FORM ON
THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED.
THE FOLLOWING:
9111 CONTINUE AS PROGRAMMED
TERMINATE
IF TERMINATION IS RECOMMENDED
CONTRACTOR'S PERFORMANCE AND CERTIFY
THESE INCLUDE, WHERE APPLICABLE.
ITEM
REC'D
DOES NOT
APPLY
ITEM
RECD
DOES NOT
APPLY
PROTOTYPES
MANUALS
DRAWINGS AND SPECIFICATIONS
FINAL REPORT
PRODUCTION AND/OR OTHER
END ITEMS
SPECIAL TOOLING
OTHER GOVERNMENT PROPERTY
DATE OF LAST CONTACT WITH CONTRACTOR
June 1964
SIGNATURE OF INSPECTOR
25X1A
DIVISION
25X1A
M-nr
INSPECTOR
SIGNATURE 0
FORM 129, USE
6.64 " PREVIOUS
EDITION
? ?
SECRET
(When Filled In)
downgrading and
declassification
V9-
Approved For Release 2001/05(1 netfir78604747A001200060001-2
(When Filled In)
TO hicf, iPIC DATE: 1 June 1964
FROM lxief, Engineering Section/CB/PD/OL 25X1A
SUBJECT: Inspection Under Contract No. Task Order
RequisitiOn No.5500-2767-64 Voucher No. IIIIIIII 25X1A
25X1A
Contractor:
Item: varyscan Mark II Rear Projection Film Viewer
1. Your Office is responsible for performing inspection 'duties under the
subject Contract. As 'a part of this responsibility, it is requested that you
arrange; to monitor the Contractor's performance at hit facility and. determine
Whethe or not the quality standards of the Contract are being met.' It is
Nov/ also r: quested that you authenticate the need for and proper use of any. '
Govern... lent Furnished Property madeavailable to the Contractor in accordance
with tle Contract.
To assist in our evaluation of this Contractor's, capability and per-
e,it is requested that you forward to us d report of each inspection
visit to the Contractor's facility. Both the interim reports and the final
report should include information relative to the contraatual provisions for
delivery and expenditure, as well as your judgment of the Contractor's over-
all performance. The final report should be in narrative form and should
include a statement certifying that all deliverable items listed in the con-
tract have been received.
3. Reports that indicate Overall performance as unsatisfactory or barely
adeq, should support such evaluations with detailed explanations of the
specLfic discrepancies and the corrective action which is being taken. Reports
should be sUbmitted at intervals of no more than sixty (60) days so that reim-
bursement maybe made on the basis, of a current evaluation of performance by
the Conttactor. Inspection Report Form 1897 maybe used for interim reports.
A narrative report it requested for the final report.
4. Unless a current inspection report is available in .our files, it will
1 -ecessary to withhold paymant on the Contractor's invoices until such time
us this deficiency is corrected.
5. You are requested to indicate your acceptance of this inspection re-
sponlibility by filling in the space below on one copy of this memorandmaand
returning it to us in Room 1524 Quarters Eye.
25X1A
EXTENSION
OL/PD/CB/ES/E=M:bw/2893
(1524 QuarteI?s Eye) , SECRET
25X1A (When Filled In)
Approved For Release 2001/05/11: CIA-RDP78604747A001200060001-2
STATOTHR
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
?
LAMP FAN
SLEW
ON
4111
LATE.P.AL
CENTER
STATOTHR
FILM MOTION
[IIS
ROTATIONAL
CENTER
FILM
CLAMP
OFF ON
0090
MAGNIFICATION
0
FINE
FOCUS
ILLUMINATION
INTENSITY
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
STATOTHR
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
STATOTHR
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
STATOTHR
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
roved For Release 2001/05/11: CIA-RD
STATOTHR
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
II1
A8W T
STAGE
ROTATION
cw
SLAW
LAMP FAN
4111Ill
SLEW
ON
pprove or
LATERAL ROTATIONAL
CENTER CENTER
'ALI
IX- 0 0000 0
STATOTHR FILM MOTION
CONTROL
tIP"
FILM
CLAMP
OFF ON
0
MAGNIFICATION
40
FINE
FOCUS
11=1111?11==l0
ILLUMINATION
INTENST?
0
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
11?WAN1111,,ANAN?k,
1111111111111111111111111111111111111111111111111
STATOTHR
IM111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111
VARIS CAN - MARK II
1
25X1A
25X1A
P ELN
Approved For Release 2001/05/1Fial-ftue78
1747A001200060001-2
23 October /964
Cfl Varise Mark ri
Administrative Staff, OiDET, Memorandum dated
hibrmary 1964: Approval of Research and Development
Aetivitiei.
be Varis
by par
of a variable speed, ln-
Marlc It as emtlinee in Annex "An.
25X1A
ase the cost of eontreet
making a nes total
25X1A
Attachment:
Annex A
Distributien:
Orig Sc 1 - LB SS (1 - Mil:Tatter sigrutture
1 .... O/D
2 -P&1/DB
LB/SSAPIC j :2623(22 October 1964
25X1A
Approved For Release 2001/05/1
4Rd-
747A001200060001-2
iiNki?
Excleze ton autemt11
dayojOng and
00111111,003
CONFIDENTIAL
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
14 September 1964
MEMORANDUM FOR: Assistant for Plans and Development
THROUGH Executive Secretary, Technical Development Committee
SUBJECT
Change of Scope of "Variscan Rear Projection Film
Viewer" contract
25X1A
25X1A
1. The NPIC has contracted with
for a Variscan Rear Projection Film Viewer for evaluation purposes.
Since the contract was negotiated,11111Was offered a variable speed
film traversingjcross the width of the film) option at an increased
25X1A cost of if installed prior to delivery.
2. The fixed traversing speed of the Richardson Viewers has
always been considered an equipment .limitation by the operating
personnel. On the Variscan the problem will be even more pronounced
with a fixed speed than the Richardson Viewers since the Variscan
has a greater magnification range.
25X1A
3. The Photo Analysis Group was consulted as to the desirability
of having variable traversing speed and officially requested that it
be incorporated in the equipment.
4. It is therefor-recommended that Contract with
for a. Variscan Mark II be modified to
inc u e a. variable speed on both axes of film movement at an increa. d
cost of bringing the total contract price up to
25X1A 25X1A 25X1A
Development Branch, POS
CONFIDENTIAL
Approved For Release 2001/05/11 : CIA-RDP781304747A001200060001-2
25X1
25X1A
GROUP
Eticluded horn automatic
datenoradinR end declassification
CONFIDENTIAL
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
MEMORANDUM FOR:
THROUGH
SUBJECT
14 September 1964
Assistant for Plans and Development
Executive Secretary, Technical Development Committee
Change of Scope of ?"Variscan Rear Projection Film
Viewer" contract
25X1A
25X1A
1. The NPIC has contracted with
for a Variscan Rear Projection Film Viewer for evaluation purposes.
Since the contract was negotiated, =has offered a variable speed
25X1A film traversing (across the width of the film) option at an increased
cost of if installed prior to delivery.
25X1A
2. The fixed traversing speed of the Richardson Viewers has
always been considered an equipment limitation by the operating
personnel. On the Variscan the problem will be even more pronounced
with a fixed speed than the Richardson Viewers since the Variscan
has a greater magnification range.
of
be
3. The Photo Analysis Group was consulted as to the desirability
having variable traversing speed and officially requested that it
incorporated in the equipment.
25X1A
4. It is, therefore, recommended that Contract with
for a Variscan Mark II be modified to
include a variable speed on both axes of film movement at an increased
cost of bringing the total contract price up to
25X1A 25X1A
Development Branch, P&DS
CONFIDENTIAL
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
25X1A
25X1A
GROUP 1
Ergludrid from automatic
downgrading and doclossilice/ion
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
STATOTHR
PICTURES OF VARYSCAN FILM VIEWER
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
Approved For Relea 2001/05/11 : CIA-RDP78604747A001200060001-2
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
Approved For Release 2001/05/11 : 747A001200060001-2
r-
MINCRANDOC
VIA
25X1A SWIM Proeuremaat of a Ver scan Film Viewer
Chief, Administrative Staft, Op DWI, memorandum
dated 4 Februmr7 1964: Approval of Research and
Developmemt Activities.
tor, VIC
25X1A
25X1A
25X1A
0
Viewer
is requested.
25X1A
by parogrob 3
Veryecau Film
the amount of
Attachment:
Amore A
Distribution:
Orig. & -
e puniesienc
Approved For Release 2001/Q
ZIWC/P&DS;DB;WGMhIrt (311-35)
atetnati
FAR 78B04747A0012001::27
APril 1964 and
25X1A
PROBLEM:
CONFIDENTIAL
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
27 April 1964
STAFF STUDY
PROCUREMENT OF A VARYSCAN FILM VIEWER
25X1A
To obtain on a. priority basis a Varyscan Film Viewer from
for operational test and evaluation.
FACTS:
25X1A
as an in-house effort a rear projection film
4'1 roll film in lengths of up to 1,000 feet
and 30X on a. 30" by 30" screen. At 3X a.
the
the screen.
DISCUSSION:
25X1A
has developed
viewer that will handle 35 mm through
with magnifications of 3X, 6X, 12X
by 9i" image area is projected on
The Varyscan was developed in response to requirements by SAC and AMS for
a. rear projection viewer that could project the entire 9-1-' wide format at a
minimum of 3 power as well as other magnifications with minimum damage to the
film. Except for the 3X projection, the requirements given were identical
to the Richardson 707 specifications. The requested 200 foot lambret lighting
requirement was not achieved in this instrument due to the considerably higher
costs of going to more powerful light sources than the presently available
tungsten lamps.
The prototype viewer was inspected at El by the undersigned prior to its
being shipped to SAC for demonstration and evaluation. In general, the Vary-
scan has better film handling and optical qualities than the presently avail-
able Richardson Viewers and approximately 20% more screen illumination. The
outstanding feature is of course the 3X magnification which has previously
never been achieved in an instrument of this type..
25X1A
Presently MI has a contract for six Varyscans for SAC and a. potential of
35 more for SAC and 15 for AMS out of fiscal year 1964 funds. Both the SAC
and AMS personnel that have evaluated the Varyscan have indicated that they
prefer it over the Richardson 707 design.
CONCLUSION: 25X1A
The IIIIVaryscan has better overall performance characteristics than the
presently available Richardson Viewers and may be as good or better than the
Richardson 707 V under development which will not have the 3X magnification.
It would therefore be desirable to obtain one of the Varyscans for evaluation
purposes.
CONFIDENTIAL
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
. GROUP
Exoluded from automatic
dowitv arid dockssilicotion
r
INIMENTJAL
Approved For Release 200ca-, . ,,,-,.-i-xL.,,-,01304747A001200060001-2
RECOMMENDATIONS:
25X1A
25X1A
25X1AIt is recommended that the NPIC contract for one
Varyscan at a cost not to exceed Since production costs have
not been determined, it is felt that a, fixed price redeterminable or incentive
contract should be negotiated and on an 11111 Confidential Basis It is further
recommended that the contract be negotiated with on a. priority basis before
any additional orders are consummated by SAC. This is felt necessary so that
we receive the viewer in time to evaluate it with the Richardson 707V prototype
25X1A 25X1A
Approved For Release 2001/056WWM4747A001200060001-2
25XiA
25X1A
1.
25X1A
Approved F
415 03 -6100
4155-1434-6000
Aim
25X1A
/11 P78604747A00,1200060001-2
500 67-64
Varyscan Rear Project cc Film
Viemer with variable speetd film
movement on both axiom complete
with one instruction maintenance
manual.
25X1A
Approved For Release 2001/05/11 : CIA-RDP78B04747A001200060001-2
25X1A
Approved For Release 2001 I05Ib iC1ARt78B04747Aoo1200060001-2
*
mhek. II
0/MDI,
Research
the -Vertu=
411e the cost of
making a notir total contract price of
BbIe speed,
25X1A ieit, IFIC
Attachments
Anne% A
Distributicti:
Orig & 1 - LBJSS (1 PD after signatu_re)
1 - D
2 -
LB/SS/VIC Jo2623(22 October 1964)
25X1A
Approved For Release 2001/05/1
25X1A
25X1A
4 NOV 193,,
kE4747A001200060001-2
awtviT2.1ng and
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
SECRET
(When Filled In)
TECHNICALBACKGROUND PROCUREMENT INFORMATION
25X1A 27 APR 1964
I. Contractor
B. Evaluation of previous performance:
9X1A
IL Brief description of this procurement: %MOO: t3jVia*Ott
25X1A
Estimated total amt.
A. Deliverable items: Ow
B. Is this procurement for other than a standard, "off the shelf" or slightly
modified commercial item? No If "yes", is it anticipated that
any more of this unit will be procured? WeltO If so, a complete
set of directly reproducible manufacturing drawings and specifications
would normallybe included in this procurement. Comments:
C. Will contract cover a period of more than 904a.ys?
If "yes", are progress reports desired?
quency, content and number of copies desired:
Lett
If so, indicate fre-
D. Is any Government-owned property to be provided to the contractor?
NO
etc.)
If so, list and indicate its availability. (where, when,
SECRET
(When Filled In)
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
25X1A
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
SECRET
(When Filled In)
27 AP?
E Is any special tooling involved? 40
F. Security:
1. Association with the Sponsor is
2. The specifications and/or drawings are
3. The item is
Unclassified
4. Contractor personnel known to be aware of this proposed procurement:
5. Other security information
III. Reasons for selection of this source. If other sources were considered, indi-
cate results. If no other sources were considered, list the reasons why this
firm is considered to be uniquely qualified to perform this work.
25X1A
has demi/vet the .11101111 viewer in rodponee to tills v.
roVittrustnts end In vtdoftitice with the Rieberaeou Viewers. The
proteins viewer has been impacted and is considered to be- or
surtiesent QuailLy end versatility to ysrehese one for evaluation
pawns* 44with the Elichardsoll Viewer,
25X1A
IV. Technical contactillIME
3308
Name 'Telephone
In the event additional space is required, use the reverse side(s) of this form, with
a, reference to the item number to which the comment applies.
SECRET
(When Filled In)
Approved For Release 2001/05/11 : CIA-RDP781304747A001200060001-2
"
Approved. For, Release 2001/05/11: CIA-RDP78604747A001200060001-2 ?
CLASS OP SERVICE
This Is a fast message
unless its deerred char.
octet is indicated by the
1,roper
STE1N UNION
The flu n- time shown Ira the date line on domestic telegrams is LOt AL TIME at point of origin. Time of receipt is LOCAL TIME at Point of destination
LLF 23 1 0A193. /
STATOTM
O JDO 053 PO TDJD i
TELEG ANL
W. P. MAR! HALL. PPICSI.INT
International
1201 (4-60) LTanefTelegr
Telegram
SYMBOLS
DL es Day Letter
NLashilght Letter'
2 lcilp PST
STATOTHR
CE VARISCAN BASIC MACHINE INCLUDING PRESSURISATION
FOB PACKING AND CRATING SHIPPING SPARES EXTRA, MANUAL
'INCLUDED ESTIMATED COST FOR PACKING AND SHIPPING APPROXIMATELY
"1)040
Approved For Release 2001/05/11
Approved For Releas
STATOTHR
STATOTHR
01-2
3/ 32-
4,X gq
/24/4 /1-
3 ox /3 14-
34' 4-?4
X 57 3,r-
7 Au 4 2-1( iz3
?
2.5 /4?
Approved'or Release 2001/05/11 : litR6PVB04747A0012000a0t91)52
/g. /2- .3c)
STATOTHR
For &ease 21Y01/05/11
"3 7
23
t2-
F
,
Zit
)RDP78B04747A001200060001-2
STATOTHR
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
Apiz546erta360840
00120:y009t2
4.3.1 f Product Lac.-- sample viewer shall be given
a thorough visual and rie,!:Jia-i..7a! ex-ar,!nati.in to di2termi no that the
quality of all materials ?rk mansh;
requirements of this spr.,--tfy.ation.
4 . 3 2 functIonal Tests - Opt1cd1 Prowr-tion stern The follow-
ing test t: St:dii he ',A7:1:":-..)rt:TieJi under th;:. operat-onal n specified
by 4 ,2 1 .
4. 3 . 2 . 1 Maqn1tctor Tet Place i .-all
-,,vith the
mately grids in the, filni at and %-,;,,n;y ,'Iicuum clamping.
16 randr)rri medeurctrent:, of he -,:rf.)1t-cted dri 4 Ir;
Make
of which should be in Kan.! 5:'*- in Y direct:0 St Me S 7-1 ent s in
the space provicie.1 htvi:uw rpir t1raiI Al ftt')r, r71,1.1 ?
fiCatiOriS to dtermine ;.)tit, --ph . 4 . I .
Soc /4 a ey foM I i47 ',1010111.m.rali..-
findi,,gs ir.Q.ure th rt bbeertattir t t 0.0 ? :A-. f?-' -,''.1rerl.44fterreortmat4
over r'ne entire prolecti.on ?
Calibred ;rid ct
14wo b. 3X magrdf,,-,
c . bX nagnificutior.:
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
Approved For Release 2001/05/11 : CIA-RDIM014747A021.1400Q600911f2? 1.01
d. 12X magnification:
P . 30X magnification:
4.3.2.2 Rekolution Test - Place a Standard High Contrast Air Force
Resolution Target in the film gate and apply vacuum clamping. Make 17
random readings of the minimum readable tarce*s discernable at each
magnification setting, 4 in each quadrant and one at screen center,
and record findings below. Me resolutions should conform to those
specified in 3.4. 1 . 2 .
a. Resolved target at screen center:
3X 349 6X 52,..?.___12X +. 30X_/q,.
b. Random resolution readings:
3X:
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
6X:
12X:
30X:
4.4.2.3 Mght Level Test - Make 9 reading of the Light intensity with
the projection lamp at full brilliance and with an open film gate, in each
magnification ranges; record findings below. Measurement shall be taken
Madge{ /5.4
with a calibrated photometer, Weston 4"mre-A or equal; cell in contact with
screen on operator's side, facing light source.
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
Approved For Release 2001/05/1) : C14-RDW8B04747A001200060001-2
3X
6X
12X
30X
Center
Point l?.
2
3
4
5
s.
6
s I(
7
s-3
8
Z (4,
.1(
2.1%2G.
it
ay
.16
-50
2-1
31,
14v
Lici
2(
3-2_
11,
9
t bici
14
Analyze findings for conformance with paragraph 3.4. 1 . 5; does/does not
conform.
4.4.2.4 Color Frinatno j'esn While viewing the screen on axis with
an open gate, and with materials in the gate, check for the presence of
color fringing at all magnifications. Several personnel should investigate
under this test and findings noted below. ,Consensus; color fringing is/
1- A
is not apparent on the screen.
4.4.3 Functional Tests, Film Transport - The following tests shall
be performed under the operational conditions specified by *ca=miad-
4 . 4. 3. 1 itim Dasmadatign - Load the transport with a roil of film that
is free from scratches and degradation; I.e., straight from the photo lab
and in new condition. Scan and Slew in all directions with sudden stops
and changes in direction, and with several starts from vacuum clamped.
Check the film for evidence of film degradation - the film is/is not
appreciably degraded?IMake statement ,as to seriousness of degradation,
? Atfrefor .-
if any, below. 141.4..t.
rt r/&& )mou.rt...A1 feu. 46-71 a dIAA-1
0-4:04.44 ac c.,4-4.1\ - .A. .&.
4044 ...404 Olt AM Crfrf.. AV 0:4.44A--t
I
041 Atic.t.1044 et,,,A1 tA0441V?+ ?41-1H4 614" ( 114.rdit.44.
744.Q .""tit.Q. Vt 0-44-4 (f) era-4.4. tant,144-q? al
tot 17
r eas 1/05/11: CIA-RDP78604747A001200060001-2
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
4 . 4 . 3 . d .Sdanninci Mode Film. Drive - Scar several feet of film at 30X
at the slowest possible speed. Firre the 77.overrPnt of a known length
and record the ir.ehes per second below. epeat the aboyc the
fIstest sear speed and. record the se i below. While in the Flow Scan
speed ch,2ek tor perceptable jerkin or sporadic?novement. There is/
is not ap rectanle 5 poradic mr.werrent at slowest cat- speed.
Slowest Scan speed
Fastest Scan sreec,___
inch /sec
inches /see
4.4.4 General gpera4or, - fortrini th-
it-tove functid:tal
tests, al; trots and ono-anon hoUld be thoroughly exercised.
sudden and vtoit-rt !-77handc-E-, sh ld be made vrri
attempts so uid be rade tc o.orti.t .11E,
bination to check satet\? tnterlorks
in paragraphs below
-ontrols and
,-on7eivahle cc-r-
n the equipment. Make staterents
operatlk..o if ontp)Is specifed
d . FiiniLooxc, of
b. Lateral Drive - (3.4.2.0 1 :) 1344
044^ CAtAZLA Cre-?4_
rt)4. ? 1144,- v???.- A04.-J C.Q-A?Q--4
10 A, ekA:0-AAAA, rA-Tc-e? ont.
Loa Acftt
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
lic?!pfk
- (3,4.24) (i11,01) 44
idett4a4 diAorck.4 cf2ALtitap
01-guldui
center, Auto Ho- (3 .4 . 3 .4) 64-00
4,4 eit44A44 Amur Ce144. 040..60,
SOariZ5.4riff Mod! tion-SAlec (3.4 . 2 va) AS ao ?
10.404? Ail te04 C.04%-tcrik Adt4P44.4
11.444A.4
rktmj4194jon Goptrol - (1 4 3 .1)eCtak
12kolik /4.46_04Aid ek.c.kit
frCAA? 411.04.00 i411.0.4o-
Tr, rk AAA 0,:tiLdi
totir
Approved For Release 2001/05/11 : CIA-RDP781304747A001200060001-2
4414.0
drIAAVAA.4.4.4
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
h. Metallization Selector - (3 .4 . 3 . 6)
? iatigition Intensity - (3. 4 .3.5) oK
k. Fine Focus - (3.4. 3. 7)
44a-crcx_a.
44010.46444L2VRAMPI4ztelPs0
? 4 I cAtritoi - Personnel conducting tests should note below any
comments regarctng opinion on workrr,.anship, md,-;hine Fuit3bil1ty to tht'
Tiles -Au 1_044.atA4
mission, machine weaknesses, machine trength,,, Ptc,
Is. k
ttlit.,
440,4
ei24.444 ft:A-47 INP\104 odeASA.A.
. ir
4 AAA 1-13 : CA4A 0?4??1 1
43.4,14 41-4"At 1.AAk
fdihsA
4.)
.4.104?4.4 Ateitt -rof vits,r
Approved For Release 2001/05/11 : CIA-RDP78b04747A001200060001-2
e my.
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
Test Performed by:
name rank title
Approved For Release 2001/05/11 : CIA-RDP78604747A001200060001-2
21